ML12256B049: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 13: Line 13:
| document type = Letter, Request for Additional Information (RAI)
| document type = Letter, Request for Additional Information (RAI)
| page count = 5
| page count = 5
| project = TAC:ME4936, TAC:ME4937
}}
=Text=
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555*0001 October 3,2012 Mr. D. W. Rencurrel Chief Nuclear Officer STP Nuclear Operating Company P.O. Box 289 Wadsworth,TX 77483 SUB..REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE SOUTH TEXAS PROJECT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION -RWST CRACKING, SET 24 (TAC NOS. ME4936 AND ME4937) Dear Mr. Rencurrel: By Jetter dated October 25, 2010, STP Nuclear Operating Company (STPNOC or the applicant) submitted an application pursuant to Title 10 of the Code ofFederal Regulations Part 54, to renew operating licenses and NPF-80 for South Texas Project, Units 1 and 2, for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. These requests for additional information were discussed with Arden Aldridge, and a mutually agreeable date for the response is by December 1, 2012. If you have any questions, please contact me by telephone at 301415-3873 or bye-mail at john.daily@nrc.gov. Sincerely, John W. Daily, Sr. Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-498 and Requests for additional cc w/encl:
SOUTH TEXAS PROJECT, UNITS 1 AND REQUEST FOR ADDITIONAL RWST CRACKING, SET (TAC NOS. ME4936 AND RAI Set 24, RWST Cracking (076) RAI82.1.16-3 Background: License renewal application (LRA) Table 3.2.2-4, Safety Injection System, contains an aging management review (AMR) item for the stainless steel refueling water storage tanks (RWSTs), which are exposed internally to treated borated water and are managed for loss of material with the Water Chemistry and One-Time Inspection programs. The response to request for additional information (RAI) 4.7.2-1, dated May 12, 2011, states that the Unit 1 RWST had an indication of a small active leak at the top of the shell to base plate weld. In documentation associated with the relief request for this leak (South Texas Project (STP) letters dated November 29, 1999; December 16, 1999; and later supplements), the leak was attributed to a crack in the tank base plate. Altran Technical Report No. 00115-TR-001, "Evaluation of the Refueling Water Storage Tank Bottom Plate Crack," concluded that the apparent cracking mechanism was stress corrosion cracking, based on evidence of transgranular crack propagation and branching. The leak in the Unit 1 RWST has not been repaired. On August 23, 2001, an inspection of the interior of the tank was conducted using a video camera in the submerged environment; however, the identification of the defect was not successful. STP letter dated October 25, 2001, states that there are no plans to conduct further analysis, inspection, or repair activities with respect to detection of the defect during the service life of the Unit 1 RWST, including service life extension, except those inspections required by American Society of Mechanical Engineers (ASME) Code Section XI, or approved alternative, and those required by the STP RWST Monitoring Program. This program consists of exterior visual inspections and monitoring of tank levels in the control room. The U.S. Nuclear Regulatory Commission (NRC or the staff) granted relief from the requirements of ASME Code Section XI by letter dated December 14, 2001. The staff concluded, "[tJhe NRC staff further determined that it is not necessary for the licensee to renew the relief request that was granted on June 22, 2000, regarding the RWST leakage because the licensee has upgraded its inservice inspection program to the 1989 Edition of the Code." Issue: It is unclear to the staff why the RWSTs and similar tanks will not be managed for cracking, given the occurrence of this aging effect. While the staff acknowledges that the original crack detected in the Unit 1 RWST in 1999 appears to be in a low-stress area in the tank base plate, and thus may be unlikely to grow, the staff notes that there is no basis to conclude that other cracking will not occur in higher-stress areas in tank sidewalls. As a result, in the absence of inspections on the interiors of tanks capable of detecting stress corrosion cracking, the staff cannot conclude that the structural integrity of the tanks will not be challenged during the period of extended operation. 
-Request: Describe the inspections that will be performed on the interior surfaces of the Unit 1 and Unit 2 RWSTs during the period of extended operation to detect cracking and to specifically characterize the existing defect to ensure it has not grown into the tank sidewall. In the response, include information on the inspection technique, sampling methodology, timing, and frequency. Alternatively, state the basis for how internal cracking will be effectively managed in the absence of such inspections. Given the presence of cracking in the Unit 1 RWST, describe how cracking will be managed for similar stainless steel tanks, such as the auxiliary feedwater storage tank (i.e., large-volume, near atmospheric pressure, safety-related tanks that rest on concrete and contain water), or state the basis why managing the aging effect of cracking is not necessary.
October 3, 2012 Mr. D. W. Chief Nuclear STP Nuclear Operating P.O. Box Wadsworth, TX REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF SOUTH TEXAS PROJECT, UNITS 1 AND 2, LICENSE APPLICATION -RWST CRACKING, SET 24 (TAC NOS. ME4936 Dear Mr. Rencurrel: By letter dated October 25, 2010, STP Nuclear Operating Company (STPNOC or the applicant) submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54, to renew operating licenses NPF-76 and NPF-80 for South Texas Project, Units 1 and 2, for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. These requests for additional information were discussed with Arden Aldridge, and a mutually agreeable date for the response is by December 1, 2012. If you have any questions, please contact me by telephone at 301-415-3873 or bye-mail at john.daily@nrc.gov. Sincerely, IRA! John W. Daily, Sr. Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-498 and Requests for additional cc w/encl: See next ADAMS Accession No. ML *concurrence via email OFFICE PM: DLRlRPB1 LA: DLR/RPB2* BC: DLR/RPB1 DMorey PM: DLR/RPB1 JDailyNAME JDaily IKing DATE 10/02/12 09/18/12 10/03112 10/03/12 OFFICIAL RECORD Letter to D. Rencurrel from John W. Daily dated October 3, 2012 REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE SOUTH TEXAS PROJECT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION -RWST CRACKING, SET 24 (TAC NOS. ME4936 AND ME4937) DISTRIBUTION: E-MAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrD/rRsrg Resource RidsNrrDraApla Resource RidsOgcMailCenter JDaily TTran DMc/ntyre, OPA BSingal, DORL WWa/ker, R/V JDixon, RIV BTharakan, RIV WMaier, RIV VDricks, RIV NOKeefe, R/V AVegel, RIV GPick, RIV 
}}
}}

Revision as of 10:53, 28 March 2018

Requests for Additional Information for the Review of the South Texas Project, Units 1 and 2, License Renewal Application - RWST Cracking, Set 24 (TAC Nos. ME4936 and ME4937)
ML12256B049
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 10/03/2012
From: Daily J W
License Renewal Projects Branch 1
To: Rencurrel D W
South Texas
Daily J W, 415-3873
References
TAC ME4936, TAC ME4937
Download: ML12256B049 (5)


Text

UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555*0001 October 3,2012 Mr. D. W. Rencurrel Chief Nuclear Officer STP Nuclear Operating Company P.O. Box 289 Wadsworth,TX 77483 SUB..REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE SOUTH TEXAS PROJECT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION -RWST CRACKING, SET 24 (TAC NOS. ME4936 AND ME4937) Dear Mr. Rencurrel: By Jetter dated October 25, 2010, STP Nuclear Operating Company (STPNOC or the applicant) submitted an application pursuant to Title 10 of the Code ofFederal Regulations Part 54, to renew operating licenses and NPF-80 for South Texas Project, Units 1 and 2, for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. These requests for additional information were discussed with Arden Aldridge, and a mutually agreeable date for the response is by December 1, 2012. If you have any questions, please contact me by telephone at 301415-3873 or bye-mail at john.daily@nrc.gov. Sincerely, John W. Daily, Sr. Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-498 and Requests for additional cc w/encl:

SOUTH TEXAS PROJECT, UNITS 1 AND REQUEST FOR ADDITIONAL RWST CRACKING, SET (TAC NOS. ME4936 AND RAI Set 24, RWST Cracking (076) RAI82.1.16-3 Background: License renewal application (LRA) Table 3.2.2-4, Safety Injection System, contains an aging management review (AMR) item for the stainless steel refueling water storage tanks (RWSTs), which are exposed internally to treated borated water and are managed for loss of material with the Water Chemistry and One-Time Inspection programs. The response to request for additional information (RAI) 4.7.2-1, dated May 12, 2011, states that the Unit 1 RWST had an indication of a small active leak at the top of the shell to base plate weld. In documentation associated with the relief request for this leak (South Texas Project (STP) letters dated November 29, 1999; December 16, 1999; and later supplements), the leak was attributed to a crack in the tank base plate. Altran Technical Report No. 00115-TR-001, "Evaluation of the Refueling Water Storage Tank Bottom Plate Crack," concluded that the apparent cracking mechanism was stress corrosion cracking, based on evidence of transgranular crack propagation and branching. The leak in the Unit 1 RWST has not been repaired. On August 23, 2001, an inspection of the interior of the tank was conducted using a video camera in the submerged environment; however, the identification of the defect was not successful. STP letter dated October 25, 2001, states that there are no plans to conduct further analysis, inspection, or repair activities with respect to detection of the defect during the service life of the Unit 1 RWST, including service life extension, except those inspections required by American Society of Mechanical Engineers (ASME) Code Section XI, or approved alternative, and those required by the STP RWST Monitoring Program. This program consists of exterior visual inspections and monitoring of tank levels in the control room. The U.S. Nuclear Regulatory Commission (NRC or the staff) granted relief from the requirements of ASME Code Section XI by letter dated December 14, 2001. The staff concluded, "[tJhe NRC staff further determined that it is not necessary for the licensee to renew the relief request that was granted on June 22, 2000, regarding the RWST leakage because the licensee has upgraded its inservice inspection program to the 1989 Edition of the Code." Issue: It is unclear to the staff why the RWSTs and similar tanks will not be managed for cracking, given the occurrence of this aging effect. While the staff acknowledges that the original crack detected in the Unit 1 RWST in 1999 appears to be in a low-stress area in the tank base plate, and thus may be unlikely to grow, the staff notes that there is no basis to conclude that other cracking will not occur in higher-stress areas in tank sidewalls. As a result, in the absence of inspections on the interiors of tanks capable of detecting stress corrosion cracking, the staff cannot conclude that the structural integrity of the tanks will not be challenged during the period of extended operation.

-Request: Describe the inspections that will be performed on the interior surfaces of the Unit 1 and Unit 2 RWSTs during the period of extended operation to detect cracking and to specifically characterize the existing defect to ensure it has not grown into the tank sidewall. In the response, include information on the inspection technique, sampling methodology, timing, and frequency. Alternatively, state the basis for how internal cracking will be effectively managed in the absence of such inspections. Given the presence of cracking in the Unit 1 RWST, describe how cracking will be managed for similar stainless steel tanks, such as the auxiliary feedwater storage tank (i.e., large-volume, near atmospheric pressure, safety-related tanks that rest on concrete and contain water), or state the basis why managing the aging effect of cracking is not necessary.

October 3, 2012 Mr. D. W. Chief Nuclear STP Nuclear Operating P.O. Box Wadsworth, TX REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF SOUTH TEXAS PROJECT, UNITS 1 AND 2, LICENSE APPLICATION -RWST CRACKING, SET 24 (TAC NOS. ME4936 Dear Mr. Rencurrel: By letter dated October 25, 2010, STP Nuclear Operating Company (STPNOC or the applicant) submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54, to renew operating licenses NPF-76 and NPF-80 for South Texas Project, Units 1 and 2, for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. These requests for additional information were discussed with Arden Aldridge, and a mutually agreeable date for the response is by December 1, 2012. If you have any questions, please contact me by telephone at 301-415-3873 or bye-mail at john.daily@nrc.gov. Sincerely, IRA! John W. Daily, Sr. Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-498 and Requests for additional cc w/encl: See next ADAMS Accession No. ML *concurrence via email OFFICE PM: DLRlRPB1 LA: DLR/RPB2* BC: DLR/RPB1 DMorey PM: DLR/RPB1 JDailyNAME JDaily IKing DATE 10/02/12 09/18/12 10/03112 10/03/12 OFFICIAL RECORD Letter to D. Rencurrel from John W. Daily dated October 3, 2012 REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE SOUTH TEXAS PROJECT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION -RWST CRACKING, SET 24 (TAC NOS. ME4936 AND ME4937) DISTRIBUTION: E-MAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrD/rRsrg Resource RidsNrrDraApla Resource RidsOgcMailCenter JDaily TTran DMc/ntyre, OPA BSingal, DORL WWa/ker, R/V JDixon, RIV BTharakan, RIV WMaier, RIV VDricks, RIV NOKeefe, R/V AVegel, RIV GPick, RIV