NRR E-mail Capture - South Texas Project - Request for Additional Information - 1RE22 Inspection Summary Report for Steam Generator Tubing
ML21039A890
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 02/08/2021
From: Dennis Galvin
NRC/NRR/DORL/LPL4
To: Brost W
South Texas
References
L-2020-LRO-0062
Download: ML21039A890 (4)


Text

From: Galvin, Dennis Sent: Monday, February 8, 2021 2:05 PM To: Wendy Brost (webrost@stpegs.com)

Subject:

South Texas Project - Request for Additional Information - 1RE22 Inspection Summary Report for Steam Generator Tubing (EPID: L 2020-LRO-0062)

Attachments: STP 1RE22 SG Tube Inspection Summary Report RAI 2021-02-08.pdf Ms. Brost, By letter dated October 7, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20281A854), STP Nuclear Operating Company submitted information summarizing the results of the spring 2020 steam generator (SG) inspections performed at South Texas Project Electric Generating Station, Unit 1 (South Texas Unit 1). The inspections were performed during refueling outage 22 (1RE22).

The NRC staff has determined that additional information is needed to complete its review. The requests for additional information (RAIs) were transmitted to the licensee in draft form on January 29, 2021. On February 8, 2021, the licensee indicated that a clarification call was not needed and the licensee agreed to provide responses to the RAls by March 10, 2021. The NRC staff agreed with this date.

If you have any questions, please contact me at (301) 415-6256 or Dennis.Galvin@nrc.gov.

Respectfully, Dennis Galvin Project Manager U.S Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Operating Reactor Licensing Licensing Project Branch 4 301-415-6256 Docket No. 50-498

Hearing Identifier: NRR_DRMA Email Number: 1010 Mail Envelope Properties (SA9PR09MB5519C872E829CA3D6022CAE8FB8F9)

Subject:

South Texas Project - Request for Additional Information - 1RE22 Inspection Summary Report for Steam Generator Tubing (EPID: L 2020-LRO-0062)

Sent Date: 2/8/2021 2:04:43 PM Received Date: 2/8/2021 2:04:00 PM From: Galvin, Dennis Created By: Dennis.Galvin@nrc.gov Recipients:

"Wendy Brost (webrost@stpegs.com)" <webrost@stpegs.com>

Tracking Status: None Post Office: SA9PR09MB5519.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 1160 2/8/2021 2:04:00 PM STP 1RE22 SG Tube Inspection Summary Report RAI 2021-02-08.pdf 105419 Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

REQUEST FOR ADDITIONAL INFORMATION 1RE22 INSPECTION

SUMMARY

REPORT FOR STEAM GENERATOR TUBING STP NUCLEAR OPERATING COMPANY SOUTH TEXAS PROJECT UNIT 1 DOCKETS 50-498 By letter dated October 7, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20281A854), STP Nuclear Operating Company submitted information summarizing the results of the spring 2020 steam generator (SG) inspections performed at South Texas Project Electric Generating Station, Unit 1 (South Texas Unit 1). The inspections were performed during refueling outage 22 (1RE22).

In Appendix A of Part 50 of Title 10 of the Code of Federal Regulations (10 CFR), General Design Criteria 14, 15, 30, 31, and 32 define requirements for the structural and leakage integrity of the reactor coolant pressure boundary (RCPB). As part of the RCPB, the SG tubes must also meet the requirements of 10 CFR 50.55a with respect to inspection and repair requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code. All pressurized water reactors have Technical Specifications (TS) according to 10 CFR 50.36 that include a SG Program with specific criteria for the structural and leakage integrity, repair, and inspection of SG tubes. South Texas Unit 1 TS Section 6.9.1.7 requires that a report be submitted within 180 days after the initial entry into hot shutdown (MODE 4) following completion of an inspection of the SGs performed in accordance with TS Section 6.8.3.o, which requires that a SG Program be established and implemented to ensure SG tube integrity is maintained.

To complete its review of the inspection report, the U.S. Nuclear Regulatory Commission (NRC) staff requests the following additional information.

1. As required by South Texas Unit 1 TS Sections 6.9.1.7.e and f, provide the following:
a. Number of tubes plugged during 1RE22 for each degradation mechanism.
b. Number and percentage of tubes plugged to date, and the effective plugging percentage in each SG.
2. The NRC staff have the following questions regarding Table 1 of the spring 2020 SG tube inspection report (SGTIR).
a. During 1RE22, 811 (209 in SG-A, 175 in SG-B, 201 in SG-C, and 226 in SG-D) total manufacturing burnish marks (MBMs) were reported. However, a total of 1036 (247 in SG-A, 226 in SG-B, 260 in SG-C, and 303 in SG-D) MBMs were reported in the fall 2015 SGTIR (1RE19) (ADAMS Accession No. ML16125A248). Please discuss the difference in the number of MBMs between the two reports.
b. A total of 40 (20 in SG-A, 8 in SG-B, 4 in SG-C, and 8 in SG D) tube-to-tube proximity (PRO) indications were reported during 1RE22. However, a total of 27 (16 in SG-A, 7 in 1

SG-B, 4 in SG-C, and 0 in SG-D) PRO indications were reported during 1RE19. Please discuss the difference in the number of PRO indications between the two reports. In addition, if new PRO indications were identified during 1RE22, please discuss any insight you may have with regards to the cause of the PRO indications.

c. During 1RE22, 11 (0 in SG-A, 1 in SG-B, 3 in SG-C, and 7 in SG-D) total volumetric (VOL) indications were reported. However, a total of 13 (1 in SG-A, 1 in SG-B, 3 in SG-C, and 8 in SG-D) VOL indications were reported during 1RE19. The NRC staff understands that tube Row 30, Column 78 in SG-D was plugged during 1RE19. Please discuss why the VOL indication reported in SG-A during 1RE19 was not reported during 1RE22.

2