Letter Sequence Request |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: ML110620203, ML11140A163, ML11172A096, ML11224A265, ML11230A003, ML11305A075, ML11318A121, ML11318A122, ML11318A123, ML11318A124, ML11318A125, ML11318A126, ML11318A127, ML11318A128, ML11318A129, ML11318A130, ML11318A131, ML11318A132, ML11318A133, ML11318A135, ML11318A136, ML11318A138, ML11318A139, ML11318A140, ML11318A141, ML11318A142, ML11318A143, ML11318A144, ML11318A145, ML11318A146, ML11318A147, ML11318A148, ML11318A149, ML11318A150, ML11318A151, ML11318A152, ML11318A153, ML11318A154, ML11318A155, ML11318A156, ML11318A157, ML11318A158, ML11318A159, ML11318A160, ML11318A161, ML11318A162, ML11318A163, ML11318A164, ML11318A165, ML11318A166... further results
|
MONTHYEARML1106202032011-03-17017 March 2011 License Renewal Application Online Reference Portal Project stage: Other ML1108309782011-04-14014 April 2011 Request for Additional Information for the Review of the South Texas Project, License Renewal Application, Fire Protection and Component Integrity (TAC Nos. ME4536 ME4637 Project stage: RAI ML1108907642011-04-14014 April 2011 Request for Additional Information for the Review of the South Texas Project, License Renewal Application-Electrical Branch Scoping Project stage: RAI ML1108205792011-04-14014 April 2011 Request for Additional Information for the Review of the South Texas Project, License Renewal Application -Section 2.4 Structural Project stage: RAI ML1112501472011-05-0505 May 2011 Notice of Withdrawal of Megan Wright in the Matter of South Texas Project, Units 1 and 2 Project stage: Request ML11130A0262011-05-0505 May 2011 Response to Request for Additional Information for License Renewal Application Project stage: Response to RAI ML11145A0902011-05-12012 May 2011 Response to Request for Additional Information for Licence Renewal Application Project stage: Response to RAI ML11137A0922011-05-24024 May 2011 Request for Additional Information for the Review of the South Texas Project, Units 1 and 2, License Renewal Application Future Consideration of Operating Experience Project stage: RAI ML11140A1632011-06-0606 June 2011 Plan for the Aging Management Program Regulatory Audit Regarding the South Texas Project, Units 1 and 2 License Renewal Application Review Project stage: Other ML11172A0962011-06-16016 June 2011 Amendment 2 to the License Renewal Application Project stage: Other NOC-AE-11002681, Amendment 2 to the License Renewal Application2011-06-16016 June 2011 Amendment 2 to the License Renewal Application Project stage: Other ML11181A0372011-06-23023 June 2011 Response to Request for Additional Information for License Renewal Application Project stage: Response to RAI NOC-AE-11002683, Response to Request for Additional Information for License Renewal Application (TAC Nos. ME4936 and ME4937)2011-06-23023 June 2011 Response to Request for Additional Information for License Renewal Application (TAC Nos. ME4936 and ME4937) Project stage: Response to RAI ML11154A0132011-07-0606 July 2011 Summary of Telephone Conference Call Held on May 23, 2011, Between the NRC and STPNOC, Concerning Requests for Additional Information Pertaining to the South Texas Project, LRA-Future Consideration of Operating Experience Project stage: RAI ML11166A2392011-07-12012 July 2011 Letter Request for Additional Information for South Texas Project Electric Generating Station, Units 1 and 2 License Renewal Application - Scoping and Screening Balance of Plant Project stage: RAI ML11201A0552011-07-28028 July 2011 Requests for Additional Information for the Review of the South Texas Project, License Renewal Application - Scoping and Screening Audit Project stage: RAI NOC-AE-11002702, Response to Request for Additional Information for the Review of the South Texas Project License Renewal Application2011-08-0909 August 2011 Response to Request for Additional Information for the Review of the South Texas Project License Renewal Application Project stage: Response to RAI ML11234A0452011-08-0909 August 2011 Response to Request for Additional Information for the South Texas Project License Renewal Application Project stage: Response to RAI ML11245A1012011-08-0909 August 2011 Response to Request for Additional Information for the Review of the South Texas Project License Renewal Application Project stage: Response to RAI ML11214A0052011-08-15015 August 2011 Requests for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application - Aging Management Programs Audit, Structures/Electrical Project stage: RAI ML11214A0272011-08-15015 August 2011 Requests for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application - Aging Management Programs Audit, Reactor Systems Project stage: RAI ML11214A0882011-08-15015 August 2011 Request for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application - Aging Management Programs Audit, Plant Systems Project stage: RAI ML11238A0712011-08-18018 August 2011 Response to Request for Additional Information for the South Texas Project License Renewal Application Project stage: Response to RAI ML1123000162011-08-18018 August 2011 License Renewal - Errata in AMP RAI Package Project stage: RAI NOC-AE-11002716, Response to Request for Additional Information for the South Texas Project License Renewal Application (TAC ME4936 and ME4937)2011-08-18018 August 2011 Response to Request for Additional Information for the South Texas Project License Renewal Application (TAC ME4936 and ME4937) Project stage: Response to RAI ML11238A0722011-08-23023 August 2011 Response to Request for Additional Information for the South Texas Project License Renewal Application Project stage: Response to RAI NOC-AE-11002714, Response to Request for Additional Information for the South Texas Project License Renewal Application (TAC ME4936 and ME4937)2011-08-23023 August 2011 Response to Request for Additional Information for the South Texas Project License Renewal Application (TAC ME4936 and ME4937) Project stage: Response to RAI ML11230A0032011-09-0606 September 2011 Scoping and Screening Audit Report Regarding the South Texas Project, Units 1 and 2 Project stage: Other ML11266A0192011-09-15015 September 2011 Response to Request for Additional Information for License Renewal Application Project stage: Response to RAI ML11266A0202011-09-15015 September 2011 Response to Requests for Additional Information for License Renewal Application Project stage: Response to RAI NOC-AE-11002731, Response to Requests for Additional Information for License Renewal Application (TAC Nos. ME4936 and ME4937)2011-09-15015 September 2011 Response to Requests for Additional Information for License Renewal Application (TAC Nos. ME4936 and ME4937) Project stage: Response to RAI NOC-AE-11002730, Response to Request for Additional Information for License Renewal Application (TAC Nos. ME4936 and ME4937)2011-09-15015 September 2011 Response to Request for Additional Information for License Renewal Application (TAC Nos. ME4936 and ME4937) Project stage: Response to RAI ML1124402012011-09-21021 September 2011 Request for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application - Aging Management Review, Set 2 Project stage: RAI ML11250A0432011-09-22022 September 2011 Requests for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application - Aging Management Review, Set 1 Project stage: RAI ML11224A2652011-09-22022 September 2011 Aging Management Programs Audit Report Regarding the South Texas Project, Units 1 and 2, Station License Renewal Application Project stage: Other ML11258A1612011-09-22022 September 2011 Request for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application - Aging Management Review, Set 3 Project stage: RAI ML11272A1652011-10-0404 October 2011 Summary of Telephone Conference Call Held on September 28, 2011, Between the NRC and STP Nuclear Operating Company, Concerning Request for Additional Information Pertaining to the South Texas Project, LRA Project stage: RAI ML11291A1522011-10-10010 October 2011 Response to Requests for Additional Information for the License Renewal Application Project stage: Response to RAI NOC-AE-11002732, Response to Requests for Additional Information for the License Renewal Application2011-10-10010 October 2011 Response to Requests for Additional Information for the License Renewal Application Project stage: Response to RAI ML11291A1202011-10-10010 October 2011 10CFR50.59 Summary Report Project stage: Request ML11273A0172011-10-11011 October 2011 Requests for Additional Information for the Review of the South Texas Project, Units 1 and 2, License Renewal Application - Aging Management Review, Set 5 Project stage: RAI ML11273A0082011-10-11011 October 2011 Requests for Additional Information for the Review of the South Texas Project, Units 1 and 2, License Renewal Application - Aging Management Review, Set 4 Project stage: RAI ML11277A0472011-10-18018 October 2011 Requests for Additional Information for the Review of the South Texas Project, Units 1 and 2, License Renewal Application - Aging Management Program, Set 6 Project stage: RAI NOC-AE-11002737, Supplement to License Renewal Application (TAC Nos. ME4936 and ME4937)2011-10-18018 October 2011 Supplement to License Renewal Application (TAC Nos. ME4936 and ME4937) Project stage: Supplement ML11298A0822011-10-18018 October 2011 Supplement to License Renewal Application Project stage: Supplement ML11305A0762011-10-25025 October 2011 Response to Requests for Additional Information for License Renewal Application Project stage: Response to RAI NOC-AE-11002756, Contact Information Change, License Renewal Application (TAC ME4936 and ME4937)2011-10-26026 October 2011 Contact Information Change, License Renewal Application (TAC ME4936 and ME4937) Project stage: Other ML11305A0752011-10-26026 October 2011 Contact Information Change, License Renewal Application Project stage: Other ML11318A1772011-11-0303 November 2011 Drawing No. LR-STP-WL-7R309F90001 1, Rev. 1, Piping and Instrumentation Diagram Liquid Waste Processing System Project stage: Other ML11318A1722011-11-0303 November 2011 Drawing No. LR-STP-WL-5R309F05022 2, Rev. 1, Piping and Instrumentation Diagram Liquid Waste Processing System Project stage: Other 2011-06-16
[Table View] |
Text
SOUTH TEXAS PROJECT ALUMINUM BRONZE AGING MANAGEMENT REQUEST FOR ADDITIONAL INFORMATION December 21, 2016 1
Purpose Discuss enhancements to the Aluminum Bronze Aging Management Program and clarification information in response to the Request for Additional Information dated December 5, 2016.
Identify any areas where additional information would be beneficial.
2
Requested Clarification Information 1.
Approximate number of susceptible above and below ground welds.
3 Size Above Grd Butt Welds w/BR Above Grd Butt Welds No BR Below Grd Butt Welds w/BR Below Grd Butt Welds No BR Total Butt Welds w/BR Total Butt Welds No BR Total Butt Welds 1
12 12 12 2
18 18 18 3
148 158 148 158 306 4
104 156 104 156 260 6
206 136 6
12 212 148 342 8
47 51 47 51 98 10 74 162 76 350 150 512 662 14 15 9
15 9
22 24 9
33 9
33 42 30 75 81 275 1224 350 1305 1655 Total 678 816 357 1586 1035 2402 3437 1494 1943
Requested Clarification Information 1.
Approximate number of susceptible above and below ground welds.
2.
Time of Flight Defraction Technique (TOFD)
- a. Opposing probes producing three primary wave components
- b. Demonstrated through Low Rigor level qualification in accordance with section V, article 14 of the 2004 edition of the ASME,BPVC. Additional demonstration by NDE UT Level III for the Authorized Nuclear Inservice Inspector.
- c. Graphical representation of results with a resolution in depth accuracy between 0.2mm to 1.0mm.
- d. Non Destructive Examination personnel are qualified in conducting and evaluating examination results in accordance with STP procedure which is applicable to the examination of ASME Code Class 1, 2, and 3 pressure retaining components which meet the requirements of the ASME Boiler and Pressure Vessel Code,Section XI, 2004.
4
Requested Clarification Information (cont)
- 3. Acceptance Criteria for TOFD examination results
- A destructive examination not meeting acceptance criteria would provide evidence that the welds are susceptible to selective leaching through the root pass. Requiring periodic monitoring, corrective actions, and tracking and trending requirements to assure on-going selective leaching is managed.
- TOFD Examination will be utilized to perform extent of condition determinations in the event destructive examinations do not meet acceptance criteria and in performing periodic monitoring.
- Loss of material due to selective leaching resulting in not meeting ASME Section XI Code required margins imposed by ASME Section XI structural factors for normal/upset and emergency/faulted conditions.
5
Requested Clarification Information (cont)
- 4. Failed Structural Integrity Analysis Results:
a.
Quantity of Extent of Condition TOFD UT examinations
- TOFD UT Examination on the remaining above ground weld population using a sample with a 95/95 confidence until no additional weld indication not meeting the acceptance criteria and within structural integrity is found.
- If a second weld is found that does not meet structural integrity, 100 percent of the remaining above ground welds will be TOFD UT examined b.
Timing of Examination
- The extent of condition following one condition not meeting structural integrity of TOFD UT examinations will be completed within the limiting condition for operation time limits of the ECW system.
- If a second weld is found that does not meet structural integrity the remaining TOFD UT examinations will be performed within 6 months.
6
Requested Clarification Information (cont)
- 4. Failed Structural Integrity Analysis Results:
c.
Periodic TOFD UT examinations will be performed every 5 years with a 95/95 confidence sample.
d.
The sample will be randomly selected from the total population of above ground welds associated with the weld type (with or without backing ring) not meeting acceptance criteria, considering construction, size distributions, structural integrity margins, and consequence of failure.
e.
Basis for the samplinging inspection parameters
- Sample is based on a confidence level of 95 percent with a margin of error of 5 percent.
- Selection criteria considers risk and variability of construction, structural integrity margins, and consequence of failure
- Periodic Examinations frequency and quantity to assure detection and correction prior to exceeding design limits.
7
Requested Clarification Information (cont)
- 4. Failed Structural Integrity Analysis Results:
f.
Actions if subsequent inspections do not meet Structural Integrity:
- Enter Limiting condition of operation
- Determine extent of condition by performing TOFD UT examinations on 100 percent of the remaining above ground welds.
- Repair or replacement program of the susceptible weld(s)
- Perform an evaluation of the below ground weld margins to identify locations requiring inspection.
8
Requested Clarification Information (cont) 5.
Destructive Examinations not meeting Acceptance Criteria:
A destructive examination not meeting acceptance criteria would provide evidence that the welds are susceptible to selective leaching through the root pass. Requiring periodic monitoring, corrective actions, and tracking and trending requirements to assure on-going selective leaching is managed.
a.
How many TOFD examinations (loss of material due to selective leaching)
- Within 60 days perform five TOFD examinations for each weld not meeting acceptance criteria (destructive examination, or periodic TOFD examination) until no additional weld indication not meeting the acceptance criteria is found.
- Every 5 years perform periodic TOFD monitoring of any welds previously found to not meet acceptance criteria. These welds shall be monitored until 3 consecutive examinations identify no additional propagation of the selective leaching. (Periodic examination and Tracking and Trending)
- Perform periodic TOFD examinations of an additional 10% sample of the remaining above ground weld types every 5 years. (Periodic examination and Tracking and Trending) 9
Requested Clarification Information (cont)
- 5. Destructive Examinations not meeting Acceptance Criteria:
- b. The examinations to be completed within 60 days of identifying acceptance criteria not met.
c.
Periodicity and quantity of periodic examinations
- Change the one time Destructive Examination to periodic TOFD examinations to be performed every 5 years.
- Perform periodic TOFD monitoring of any welds found to not meet acceptance criteria. These welds shall be monitored until 3 consecutive examinations identify no additional propagation of the selective leaching. (Periodic examination and Tracking and Trending)
- Perform periodic TOFD examination of an additional 10% sample of the remaining above ground weld types. (Periodic examination and Tracking and Trending) 10
Requested Clarification Information (cont)
- 5. Destructive Examinations not meeting Acceptance Criteria:
- d. Sampling locations are from previously identified weld locations not meeting acceptance criteria plus an additional 10% sample will be randomly selected from the total population of above ground welds associated with the weld type (with or without backing ring) not meeting acceptance criteria, considering construction, size distributions, structural integrity margins, and consequence of failure.
- e. Basis for sampling inspection parameters
- The destructive examination is replaced by periodic TOFD UT examinations to track and trend potential degradation.
- Selection criteria considers risk and variability of construction, structural integrity margins, and consequence of failure.
- Periodic Examinations frequency and quantity to assure detection and correction prior to exceeding design limits.
11
Requested Clarification Information (cont) 6.
The results of the UT examinations will be incorporated into the existing acceptance criteria for destructive examinations and the associated corrective actions addressed in question 3, 4, and 5.
7.
Evaluation demonstrating the structural integrity margins of buried piping as compared to aboveground piping.
- Considering the worst case conditions, the above ground 30 ECW piping has stress levels approximately twice that of the below ground piping; the above ground 10 ECW piping has stress levels approximately three times that of the below ground piping. In terms of flaw tolerance, for the maximum bending stresses discussed above, a comparison of the limiting through-wall flaw lengths for meeting structural integrity (L) for the below and above ground piping is 1.96/1.83.
12
Requested Clarification Information (cont)
- 8. Acceptance criteria for Destructive examinations:
- 1. No loss of material due to selective leaching penetrating 80% of the root-pass region.
- 2. Found selective leaching is non-propagating (surrounded by a resistant phase distribution).
- 3. The microstructure of the weld root region shall exhibits a non-continuous phase distribution consistent with the metallurgical technical basis report.
13
Questions?
14