MONTHYEARML23334A0062023-11-29029 November 2023 NRR E-mail Capture - South Texas Project - Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements ML23319A4442023-11-15015 November 2023 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements ML23278A1532023-10-0505 October 2023 NRR E-mail Capture - South Texas Project Request for Additional Information - Request for Indirect Transfer of Licenses and Conforming Amendments (L-2023-LLM-0004) ML23264A0972023-09-21021 September 2023 NRR E-mail Capture - South Texas Project - Request for Additional Information - License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23255A2862023-09-12012 September 2023 NRR E-mail Capture - South Texas Project Draft Request for Additional Information License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23191A0102023-07-0707 July 2023 NRR E-mail Capture - South Texas Project - Acceptance of Request for Indirect Transfer of Licenses and Conforming Amendments (L-2023-LLM-0004) ML23145A1872023-05-24024 May 2023 July 2023 Emergency Preparedness Program Inspection - Request for Information ML23124A3272023-05-0404 May 2023 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23115A0702023-04-24024 April 2023 NRR E-mail Capture - South Texas Project Units 1 and 2 - Audit Plan - Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections ML23096A1592023-04-0606 April 2023 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code ML23065A0912023-03-0303 March 2023 NRR E-mail Capture - South Texas Project - Draft Supplemental Information Request - Proposed Alternative to the Requirements of the ASME Code ML23003A8082022-11-28028 November 2022 NRR E-mail Capture - Texas Commission on Environmental Quality (TCEQ) Review/Comment Regarding the Draft Environmental Assessment for the South Texas Project Alternate Disposal Request (L-2021-LLL-0022)) ML22249A0692022-09-0606 September 2022 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements (L-2002-LLA-0113) ML22206A0142022-07-20020 July 2022 NRR E-mail Capture - South Texas Project - Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22194A0502022-07-0707 July 2022 NRR E-mail Capture - South Texas Project - Updated Draft Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22194A0492022-06-0808 June 2022 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22123A3272022-05-0303 May 2022 STP EP Exercise Inspection July 2022 RFI ML22115A2632022-04-19019 April 2022 Email Response to David Lochbaum Regarding Interim Configuration of Holtec HI-STORE FW Spent Fuel Multipurpose Canister at South Texas Project Energy Generating Station ML22105A5642022-04-0505 April 2022 Request for Information for Problem Identification and Resolution at STP Nuclear Operating Company ML21344A0072021-12-0909 December 2021 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Alternative Disposal Request ML21305B8022021-11-0101 November 2021 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Inservice Inspection Impracticality ML21257A2262021-09-14014 September 2021 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (L-2021-LLA-0151) ML21160A1522021-06-0909 June 2021 Request for Information NRC Inspection 2021-003 Public Radiation Safety ML21133A2372021-05-0505 May 2021 Request for Additional Information: STP EP Exercise Inspection - July 2021 ML21117A3242021-04-22022 April 2021 NRR E-mail Capture - (External_Sender) STP Questions About Eplan Amendment SE ML21103A0072021-04-12012 April 2021 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Add a Note to TS 3.6.3 and to Remove the TS Index (L-2021-LLA-0041) ML21058A0002021-02-26026 February 2021 NRR E-mail Capture - South Texas Units 1 and 2 - License Amendment Request to Revise Moderator Temperature Coefficient SRs - Audit Plan and Setup of Online Document Access (L-2021-LLA-0004) ML21049A2652021-02-16016 February 2021 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Revise the Moderator Temperature Coefficient Surveillance Requirements (L-2021-LLA-0004) ML21039A8902021-02-0808 February 2021 NRR E-mail Capture - South Texas Project - Request for Additional Information - 1RE22 Inspection Summary Report for Steam Generator Tubing ML21029A3312021-01-29029 January 2021 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - 1RE22 Inspection Summary Report for Steam Generator Tubing ML20244A0222020-08-28028 August 2020 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil. (L-2020-LLA-0172) ML20135H1982020-05-14014 May 2020 NRR E-mail Capture - South Texas Unit 1 - License Amendment Request to Revise Safety Injection System Accumulator Pressure - Audit Plan and Setup of Online Reference Portal ML20125A3312020-05-0404 May 2020 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Revise the Emergency Plan (L-2020-LLA-0057) ML20111A0052020-04-17017 April 2020 NRR E-mail Capture - South Texas Project - Request for Additional Information - Proposed Alternative to ASME OM Code 2012 Edition - Relief Request PRR-01 ML20050E1192020-02-19019 February 2020 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Actions - Proposed Alternatives to ASME OM Code Requirements (EPID: L 2020-LLR-0007 to L-2020-LLR-0010) ML19344A0092019-12-0909 December 2019 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping ML19309F1412019-11-0404 November 2019 Supplemental Information Request - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping (EPID L 2019-LLR-0096) (Draft) ML19291A0332019-10-17017 October 2019 NRR E-mail Capture - Acceptance Review Results: STP License Amendment Request Regarding Request to Delete E Bar Definition ML19165A1032019-06-14014 June 2019 NRR E-mail Capture - Draft RAI for STP TS 3.8.1.1 Sbdg SR Change ML19162A1162019-05-22022 May 2019 NRR E-mail Capture - Acceptance Review Results: STP License Amendment Request Regarding TSTF-529 ML19095A6562019-04-0404 April 2019 NRR E-mail Capture - (External_Sender) Handout for 4/10/19 Meeting to Discuss a Proposed Request for South Texas Project, Units 1 and 2, Regarding Repair of Piping Using Carbon Fiber Repair Methods ML19081A1512019-03-21021 March 2019 NRR E-mail Capture - Draft Round 2 RAI - Sbdg Voltage and Frequency LAR (L-2018-LLA-0078) ML19078A3792019-03-19019 March 2019 NRR E-mail Capture - Acceptance Review Results: STP RR-ENG-3-23 (L-2018-LLR-0021) ML18292A7272018-10-19019 October 2018 NRR E-mail Capture - Acceptance Review Results: TSTF-522 (L-2018-LLA-0271) ML18283B9522018-10-10010 October 2018 NRR E-mail Capture - Final RAI - South Texas Standby DG TS Change (L-2018-LLA-0078) ML18263A1432018-09-12012 September 2018 NRR E-mail Capture - Final RAI for South Texas Project RR-ENG-E-16 (L-2018-LLR-0097) ML18190A5002018-07-0909 July 2018 NRR E-mail Capture - Acceptance Review Results - South Texas Unit 1 Relief Request - Relief Request RR-ENG-3-16 (L-2018-LLR-0097) ML18121A0322018-04-30030 April 2018 NRR E-mail Capture - Acceptance Review Results - South Texas Project Technical Specification Change for Standby Diesel Generator Surveillance Requirements Acceptance Criteria (L-2018-LLA-0078) ML18060A3062018-03-0101 March 2018 NRR E-mail Capture - Acceptance Review Results for South Texas Project Relief Request to Extend the Timeframe for Volumetric Exams of B-A and B-D Reactor Vessel Welds (L-2018-LLR-0010) ML18016A1542018-01-16016 January 2018 NRR E-mail Capture - Acceptance Review Results - South Texas Project Relief Request to Use Ultrasonic Examination Techniques in Lieu of Radiography (L-2017-LLR-0154) 2023-09-21
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24024A1162024-01-24024 January 2024 STP Unit 2 Request for Information ML23334A0062023-11-29029 November 2023 NRR E-mail Capture - South Texas Project - Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements ML23319A4442023-11-15015 November 2023 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements ML23278A1532023-10-0505 October 2023 NRR E-mail Capture - South Texas Project Request for Additional Information - Request for Indirect Transfer of Licenses and Conforming Amendments (L-2023-LLM-0004) ML23264A0972023-09-21021 September 2023 NRR E-mail Capture - South Texas Project - Request for Additional Information - License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23255A2862023-09-12012 September 2023 NRR E-mail Capture - South Texas Project Draft Request for Additional Information License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23145A1872023-05-24024 May 2023 July 2023 Emergency Preparedness Program Inspection - Request for Information ML22255A1542022-09-13013 September 2022 Operating Company Information Request for the Cyber Security Baseline Inspection 05000498/2022401 and 05000499/2022401 ML22206A0142022-07-20020 July 2022 NRR E-mail Capture - South Texas Project - Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22194A0502022-07-0707 July 2022 NRR E-mail Capture - South Texas Project - Updated Draft Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22194A0492022-06-0808 June 2022 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22123A3272022-05-0303 May 2022 STP EP Exercise Inspection July 2022 RFI ML22084A0762022-04-0404 April 2022 Notification of NRC Design Bases Assurance Inspection (Team) (05000498/2022012 and 05000499/2022012) and Request for Information ML21286A5732021-10-18018 October 2021 Notification of NRC Design Bases Assurance Inspection (Programs) (05000498/2022011 and 05000499/2022011) and Request for Information ML21166A2392021-06-16016 June 2021 Notification of Inspection (NRC Inspection Report 05000498/2021003 and 05000499/2021003) and Request for Information ML21160A1522021-06-0909 June 2021 Request for Information NRC Inspection 2021-003 Public Radiation Safety ML21133A2372021-05-0505 May 2021 Request for Additional Information: STP EP Exercise Inspection - July 2021 ML21039A8902021-02-0808 February 2021 NRR E-mail Capture - South Texas Project - Request for Additional Information - 1RE22 Inspection Summary Report for Steam Generator Tubing ML21029A3312021-01-29029 January 2021 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - 1RE22 Inspection Summary Report for Steam Generator Tubing ML20280A5452020-08-17017 August 2020 STP 2020 PIR Request for Information ML20111A0052020-04-17017 April 2020 NRR E-mail Capture - South Texas Project - Request for Additional Information - Proposed Alternative to ASME OM Code 2012 Edition - Relief Request PRR-01 ML20070N0222020-03-10010 March 2020 NRC Selection for Onsite Review ML20057G4612020-02-26026 February 2020 05000498/499 Request for Information - Occupational Radiation Safety Inspection ML20045E2172020-02-13013 February 2020 Licensed Operator Positive Fitness-For-Duty Test ML20036F5862020-02-0404 February 2020 Request for Additional Information - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping (EPID L-2019-LLR-0096)Redacted ML19165A1032019-06-14014 June 2019 NRR E-mail Capture - Draft RAI for STP TS 3.8.1.1 Sbdg SR Change ML19081A1512019-03-21021 March 2019 NRR E-mail Capture - Draft Round 2 RAI - Sbdg Voltage and Frequency LAR (L-2018-LLA-0078) ML18283B9522018-10-10010 October 2018 NRR E-mail Capture - Final RAI - South Texas Standby DG TS Change (L-2018-LLA-0078) ML18263A1432018-09-12012 September 2018 NRR E-mail Capture - Final RAI for South Texas Project RR-ENG-E-16 (L-2018-LLR-0097) ML18197A4172018-07-17017 July 2018 Notification of NRC Triennial Heat Sink Performance Inspection (05000498/2018003 and 05000499/2018003) and Request for Information ML18003B4222018-01-0303 January 2018 NRR E-mail Capture - Final Request for Additional Information Amendment Request to Modify the Emergency Response Organization for South Texas Project ML17229B4672017-08-16016 August 2017 Notification of NRC Inspection 05000499/2017008 and Request for Information ML17132A0712017-05-15015 May 2017 Information Request the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000498/2017407; 05000499/2017407 ML17103A6272017-04-13013 April 2017 Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000498/2017007 and 05000499/2017007) and Request for Information ML16351A1502016-12-16016 December 2016 Correction Letter Closeout of Request for Information Questions That Are No Longer Applicable Associated with the Resolution of Generic Safety Issue 191 (CAC Nos. MF2400 - MF2409) ML16302A4532016-12-12012 December 2016 Closeout of Request for Additional Information Questions That Are No Longer Applicable, Resolution of Generic Safety Issue (GSI) 191 (CAC Nos. MF2400-MF2409) ML16343A0422016-12-0808 December 2016 Request for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application (CAC NOS. ME4936, ME4937) ML16340A1022016-12-0505 December 2016 Requests for Additional Information for the Review of the South Texas Project License Renewal Application (CAC Nos. ME4936 and ME4937) ML16246A0952016-09-15015 September 2016 Correction to 8/26/16 Request for Additional Information Enclosure, License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies ML16214A2912016-08-26026 August 2016 Summary of June 28-30, 2016, Regulatory Audit at Westinghouse in Rockville, MD, License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies ML16187A0522016-07-0707 July 2016 Request for Additional Information Regarding License Renewal Application ML16141B0812016-05-31031 May 2016 Audit Summary, Risk Audit on April 12-13, 2016, at Alumni Center at the University of Texas, Austin, Tx; Pilot Generic Safety Issue 191 Submittal and Exemption Request, and Draft Request for Additional Information ML16125A2902016-05-26026 May 2016 Request for Additional Information, Risk Review, Exemption and License Amendment Request for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 (CAC Nos. MF2400-MF2409) ML16127A4522016-05-12012 May 2016 Supplemental Information Needed for Acceptance of Requested Licensing Action, Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies ML16104A3522016-04-22022 April 2016 Requests for Additional Information Set 35 for the Review of the South Texas Project License Renewal Application (Tac Nos. ME4936, ME4937) ML16082A5072016-04-11011 April 2016 Request for Additional Information, Phased Response Requested, Exemption and License Amendment Request for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 (CAC Nos. MF2400-MF2409) ML16082A4842016-03-22022 March 2016 NRR E-mail Capture - South Texas Project Units 1 & 2, Draft Request for Additional Information for Risk Review for GSI-191 ML16081A0042016-03-18018 March 2016 NRR E-mail Capture - South Texas Project Units 1 & 2, Draft Request for Additional Information for Thermal-hydraulic Review for GSI-191 ML16053A1872016-03-0101 March 2016 Request for Additional Information, Request to Revise Technical Specification 6.8.3.j, Containment Leakage Rate Testing Program, to Extend Integrated Leak Rate Test Interval from 10 to 15 Years (CAC MF6176-MF6177) ML16060A2872016-02-29029 February 2016 NRR E-mail Capture - Request for Additional Information - STP LRA Safety Review 2024-01-24
[Table view] |
Text
NRR-PMDAPEm Resource From: Regner, Lisa Sent: Friday, March 18, 2016 4:43 PM To: Wayne Harrison
Subject:
DRAFT RAI: STP CLB BAP RAI Attachments: STP BAP RAI.docx
- Wayne, In order to continue our review of your risk-informed resolution to GSI-191, the NRC staff needs additional information concerning the HLSO timing currently used in the STP Emergency Operating Procedures as it impacts the thermal-hydraulic analysis with the addition of debris.
Attached is a draft RAI question that, given an acceptable response, should close out the previous questions issued on this topic in 2009 and 2015. If you would like clarifications, we will be available to discuss at the March 31 and/or April 14 public conference calls. Alternately, we can set up a soon clarification call.
Thank you, Lisa Lisa M Regner, Sr. Project Manager, Branch LPLIV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Lisa.Regner@NRC.Gov Office: O8D08 Mail Stop: O8B01 (301) 415-1906 1
Hearing Identifier: NRR_PMDA Email Number: 2718 Mail Envelope Properties (fcc0c6ab467549e5a862b546d097990b)
Subject:
DRAFT RAI: STP CLB BAP RAI Sent Date: 3/18/2016 4:42:32 PM Received Date: 3/18/2016 4:42:33 PM From: Regner, Lisa Created By: Lisa.Regner@nrc.gov Recipients:
"Wayne Harrison" <awharrison@STPEGS.COM>
Tracking Status: None Post Office: HQPWMSMRS01.nrc.gov Files Size Date & Time MESSAGE 893 3/18/2016 4:42:33 PM STP BAP RAI.docx 20689 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
South Texas Project Risk-Informed GSI-191 Resolution RAI Regarding Boric Acid Precipitation Analysis In response to SNPB RAI 10 and SSIB RAI 66 (issued in ML14357A171), STPNOC stated (ML15246A128) that the current risk-over-deterministic (RoverD) analysis relies on the hot leg switchover (HLSO) timing of 5.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> as stated in STP UFSAR Section 15.6.5.2. As such, the NRC staff believes that changes to the HLSO timing would impact the RoverD analysis and thus the risk-informed resolution to GSI-191. In order to better understand the basis for the current HLSO timing, NRC staff have audited STPNOCs current boric acid precipitation (BAP) control analysis on two occasions, in March 2015 and February 2016.
During the February 2016 audit, NRC staff were presented with testing data supporting STPNOCs contention that the barrel-baffle region mixes with the core under certain conditions.
This region has not been previously credited in a BAP analysis. Given this, the NRC staff is not satisfied that a sufficient level of quantitative support has been provided for inclusion of any portion of the barrel-baffle region in the mixing volume. The NRC staff requests that STPNOC either:
- a. Provide additional quantitative justification for the use of the barrel-baffle region in the mixing volume, including discussion of the applicability of test data to the STP plants (e.g., scaling of the tests used and the design of the test facilities relative to the design of STP). Or,
- b. Perform a sensitivity analysis of the impact of omitting the barrel-baffle region from the mixing volume, to demonstrate that the current STP HLSO timing of 5.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> would be supported.
NRR-PMDAPEm Resource From: Regner, Lisa Sent: Friday, March 18, 2016 4:43 PM To: Wayne Harrison
Subject:
DRAFT RAI: STP CLB BAP RAI Attachments: STP BAP RAI.docx
- Wayne, In order to continue our review of your risk-informed resolution to GSI-191, the NRC staff needs additional information concerning the HLSO timing currently used in the STP Emergency Operating Procedures as it impacts the thermal-hydraulic analysis with the addition of debris.
Attached is a draft RAI question that, given an acceptable response, should close out the previous questions issued on this topic in 2009 and 2015. If you would like clarifications, we will be available to discuss at the March 31 and/or April 14 public conference calls. Alternately, we can set up a soon clarification call.
Thank you, Lisa Lisa M Regner, Sr. Project Manager, Branch LPLIV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Lisa.Regner@NRC.Gov Office: O8D08 Mail Stop: O8B01 (301) 415-1906 1
Hearing Identifier: NRR_PMDA Email Number: 2718 Mail Envelope Properties (fcc0c6ab467549e5a862b546d097990b)
Subject:
DRAFT RAI: STP CLB BAP RAI Sent Date: 3/18/2016 4:42:32 PM Received Date: 3/18/2016 4:42:33 PM From: Regner, Lisa Created By: Lisa.Regner@nrc.gov Recipients:
"Wayne Harrison" <awharrison@STPEGS.COM>
Tracking Status: None Post Office: HQPWMSMRS01.nrc.gov Files Size Date & Time MESSAGE 893 3/18/2016 4:42:33 PM STP BAP RAI.docx 20689 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
South Texas Project Risk-Informed GSI-191 Resolution RAI Regarding Boric Acid Precipitation Analysis In response to SNPB RAI 10 and SSIB RAI 66 (issued in ML14357A171), STPNOC stated (ML15246A128) that the current risk-over-deterministic (RoverD) analysis relies on the hot leg switchover (HLSO) timing of 5.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> as stated in STP UFSAR Section 15.6.5.2. As such, the NRC staff believes that changes to the HLSO timing would impact the RoverD analysis and thus the risk-informed resolution to GSI-191. In order to better understand the basis for the current HLSO timing, NRC staff have audited STPNOCs current boric acid precipitation (BAP) control analysis on two occasions, in March 2015 and February 2016.
During the February 2016 audit, NRC staff were presented with testing data supporting STPNOCs contention that the barrel-baffle region mixes with the core under certain conditions.
This region has not been previously credited in a BAP analysis. Given this, the NRC staff is not satisfied that a sufficient level of quantitative support has been provided for inclusion of any portion of the barrel-baffle region in the mixing volume. The NRC staff requests that STPNOC either:
- a. Provide additional quantitative justification for the use of the barrel-baffle region in the mixing volume, including discussion of the applicability of test data to the STP plants (e.g., scaling of the tests used and the design of the test facilities relative to the design of STP). Or,
- b. Perform a sensitivity analysis of the impact of omitting the barrel-baffle region from the mixing volume, to demonstrate that the current STP HLSO timing of 5.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> would be supported.