Letter Sequence Response to RAI |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: ML110620203, ML11140A163, ML11224A265, ML11230A003, ML11318A121, ML11318A122, ML11318A123, ML11318A124, ML11318A125, ML11318A126, ML11318A127, ML11318A128, ML11318A129, ML11318A130, ML11318A131, ML11318A132, ML11318A133, ML11318A135, ML11318A136, ML11318A138, ML11318A139, ML11318A140, ML11318A141, ML11318A142, ML11318A143, ML11318A144, ML11318A145, ML11318A146, ML11318A147, ML11318A148, ML11318A149, ML11318A150, ML11318A151, ML11318A152, ML11318A153, ML11318A154, ML11318A155, ML11318A156, ML11318A157, ML11318A158, ML11318A159, ML11318A160, ML11318A161, ML11318A162, ML11318A163, ML11318A164, ML11318A165, ML11318A166, ML11318A167, ML11318A168... further results
|
MONTHYEARML1106202032011-03-17017 March 2011 License Renewal Application Online Reference Portal Project stage: Other ML1108907642011-04-14014 April 2011 Request for Additional Information for the Review of the South Texas Project, License Renewal Application-Electrical Branch Scoping Project stage: RAI ML1108205792011-04-14014 April 2011 Request for Additional Information for the Review of the South Texas Project, License Renewal Application -Section 2.4 Structural (TAC Nos. ME4936, ME4937) Project stage: RAI ML1108309782011-04-14014 April 2011 Request for Additional Information for the Review of the South Texas Project, License Renewal Application, Fire Protection and Component Integrity (TAC Nos. ME4536 ME4637 Project stage: RAI NOC-AE-11002670, Response to Request for Additional Information for License Renewal Application2011-05-0505 May 2011 Response to Request for Additional Information for License Renewal Application Project stage: Response to RAI NOC-AE-11002672, Response to Request for Additional Information for Licence Renewal Application2011-05-12012 May 2011 Response to Request for Additional Information for Licence Renewal Application Project stage: Response to RAI ML11137A0922011-05-24024 May 2011 Request for Additional Information for the Review of the South Texas Project, Units 1 and 2, License Renewal Application Future Consideration of Operating Experience Project stage: RAI ML11140A1632011-06-0606 June 2011 Plan for the Aging Management Program Regulatory Audit Regarding the South Texas Project, Units 1 and 2 License Renewal Application Review (TAC Nos. ME4936 and ME4937) Project stage: Other NOC-AE-11002681, Amendment 2 to the License Renewal Application2011-06-16016 June 2011 Amendment 2 to the License Renewal Application Project stage: Other NOC-AE-11002683, Response to Request for Additional Information for License Renewal Application (TAC Nos. ME4936 and ME4937)2011-06-23023 June 2011 Response to Request for Additional Information for License Renewal Application (TAC Nos. ME4936 and ME4937) Project stage: Response to RAI ML11154A0132011-07-0606 July 2011 Summary of Telephone Conference Call Held on May 23, 2011, Between the NRC and STPNOC, Concerning Requests for Additional Information Pertaining to the South Texas Project, LRA-Future Consideration of Operating Experience Project stage: RAI ML11166A2392011-07-12012 July 2011 Letter Request for Additional Information for South Texas Project Electric Generating Station, Units 1 and 2 License Renewal Application - Scoping and Screening Balance of Plant (TAC Nos. ME4936 and ME4937) Project stage: RAI ML11201A0552011-07-28028 July 2011 Requests for Additional Information for the Review of the South Texas Project, License Renewal Application - Scoping and Screening Audit (TAC Nos. ME4936 and ME4937) Project stage: RAI NOC-AE-11002702, Response to Request for Additional Information for the Review of the South Texas Project License Renewal Application2011-08-0909 August 2011 Response to Request for Additional Information for the Review of the South Texas Project License Renewal Application Project stage: Response to RAI ML11214A0882011-08-15015 August 2011 Request for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application - Aging Management Programs Audit, Plant Systems (TAC ME4936 and ME4937) Project stage: RAI ML11214A0052011-08-15015 August 2011 Requests for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application - Aging Management Programs Audit, Structures/Electrical (TAC ME4936 and ME4937) Project stage: RAI ML11214A0272011-08-15015 August 2011 Requests for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application - Aging Management Programs Audit, Reactor Systems (TAC Nos. ME4936 and ME4937) Project stage: RAI NOC-AE-11002716, Response to Request for Additional Information for the South Texas Project License Renewal Application (TAC ME4936 and ME4937)2011-08-18018 August 2011 Response to Request for Additional Information for the South Texas Project License Renewal Application (TAC ME4936 and ME4937) Project stage: Response to RAI ML1123000162011-08-18018 August 2011 License Renewal - Errata in AMP RAI Package Project stage: RAI NOC-AE-11002714, Response to Request for Additional Information for the South Texas Project License Renewal Application (TAC ME4936 and ME4937)2011-08-23023 August 2011 Response to Request for Additional Information for the South Texas Project License Renewal Application (TAC ME4936 and ME4937) Project stage: Response to RAI ML11230A0032011-09-0606 September 2011 Scoping and Screening Audit Report Regarding the South Texas Project, Units 1 and 2 (TAC Nos. ME4936 and ME4937) Project stage: Other NOC-AE-11002730, Response to Request for Additional Information for License Renewal Application (TAC Nos. ME4936 and ME4937)2011-09-15015 September 2011 Response to Request for Additional Information for License Renewal Application (TAC Nos. ME4936 and ME4937) Project stage: Response to RAI NOC-AE-11002731, Response to Requests for Additional Information for License Renewal Application (TAC Nos. ME4936 and ME4937)2011-09-15015 September 2011 Response to Requests for Additional Information for License Renewal Application (TAC Nos. ME4936 and ME4937) Project stage: Response to RAI ML1124402012011-09-21021 September 2011 Request for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application - Aging Management Review, Set 2 (TAC Nos. ME4936, ME4937) Project stage: RAI ML11250A0432011-09-22022 September 2011 Requests for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application - Aging Management Review, Set 1 (TAC Nos. ME4936 and ME4937) Project stage: RAI ML11224A2652011-09-22022 September 2011 Aging Management Programs Audit Report Regarding the South Texas Project, Units 1 and 2, Station License Renewal Application (TAC Nos. ME4936 and ME4937) Project stage: Other ML11258A1612011-09-22022 September 2011 Request for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application - Aging Management Review, Set 3 (TAC Nos. ME4936 and ME4937) Project stage: RAI ML11272A1652011-10-0404 October 2011 Summary of Telephone Conference Call Held on September 28, 2011, Between the NRC and STP Nuclear Operating Company, Concerning Request for Additional Information Pertaining to the South Texas Project, LRA (TAC Nos. ME4936 and ME4937) Project stage: RAI NOC-AE-11002732, Response to Requests for Additional Information for the License Renewal Application2011-10-10010 October 2011 Response to Requests for Additional Information for the License Renewal Application Project stage: Response to RAI ML11273A0172011-10-11011 October 2011 Requests for Additional Information for the Review of the South Texas Project, Units 1 and 2, License Renewal Application - Aging Management Review, Set 5 (TAC Nos. ME4936 and ME4937) Project stage: RAI ML11273A0082011-10-11011 October 2011 Requests for Additional Information for the Review of the South Texas Project, Units 1 and 2, License Renewal Application - Aging Management Review, Set 4 (TAC Nos. ME4936 and ME4937) Project stage: RAI NOC-AE-11002737, Supplement to License Renewal Application (TAC Nos. ME4936 and ME4937)2011-10-18018 October 2011 Supplement to License Renewal Application (TAC Nos. ME4936 and ME4937) Project stage: Supplement ML11277A0472011-10-18018 October 2011 Requests for Additional Information for the Review of the South Texas Project, Units 1 and 2, License Renewal Application - Aging Management Program, Set 6 Project stage: RAI ML11305A0762011-10-25025 October 2011 Response to Requests for Additional Information for License Renewal Application (TAC ME4936 and ME4937) Project stage: Response to RAI NOC-AE-11002756, Contact Information Change, License Renewal Application (TAC ME4936 and ME4937)2011-10-26026 October 2011 Contact Information Change, License Renewal Application (TAC ME4936 and ME4937) Project stage: Other ML11318A1792011-11-0303 November 2011 Drawing No. LR-STP-WL-7R309F90021#2, Rev. 1, Piping and Instrumentation Diagram Liquid Waste Processing System Project stage: Other ML11318A1802011-11-0303 November 2011 Drawing No. LR-STP-WS-6R329F05048#1, Rev. 1, Piping and Instrumentation Diagram Solid Waste Processing System Project stage: Other ML11318A1762011-11-0303 November 2011 Drawing No. LR-STP-WL-7R309F05024#2, Rev. 1, Piping and Instrumentation Diagram Liquid Waste Processing System Project stage: Other ML11318A1652011-11-0303 November 2011 Drawing No. LR-STP-PS9Z329Z00047#1, Rev. 1, Piping and Instrumentation Diagram Primary Sampling System. Project stage: Other ML11318A1642011-11-0303 November 2011 Drawing No. LR-STP-PS-5Z329Z00045#2, Rev. 1, Piping & Instrumentation Diagram Primary Sampling System. Project stage: Other ML11318A1782011-11-0303 November 2011 Drawing No. LR-STP-WL-7R309F90021#1, Rev. 1, Piping and Instrumentation Diagram Liquid Waste Processing System Project stage: Other ML11318A1682011-11-0303 November 2011 Drawing No. LR-STP-RC-5R149F05004#2, Rev. 1, Piping and Instrumentation Diagram Acs Pressurizer Relief Tank. Project stage: Other ML11318A1722011-11-0303 November 2011 Drawing No. LR-STP-WL-5R309F05022#2, Rev. 1, Piping and Instrumentation Diagram Liquid Waste Processing System. Project stage: Other ML11318A1702011-11-0303 November 2011 Drawing No. LR-STP-RM-5R279F05033#2, Rev. 1, Piping & Instrumentation Reactor Makeup Water System. Project stage: Other ML11318A1602011-11-0303 November 2011 Drawing No. LR-STP-IA-8Q119F05050#2, Rev. 1, Piping & Instrumentation Diagram Mechanical Aux. Building Instrument Air. Project stage: Other ML11318A1472011-11-0303 November 2011 Drawing No. LR-STP-ED-5Q069F90011#1, Revision 1, Piping & Instrumentation Diagram Radioactive Vent and Drain System Fuel Handling Building Gravity Drains. Project stage: Other ML11318A1742011-11-0303 November 2011 Drawing No. LR-STP-WL-5R309F05027#2, Rev. 1, Piping & Instrumentation Diagram Auxiliary Steam and Condensate Return System (Lwps) Project stage: Other ML11318A1462011-11-0303 November 2011 Drawing LR-STP-ED-5Q069F05030 #2, Rev. 17, Piping & Instrumentation Diagram Radioactive Vent & Drain System Sump Pumps. Project stage: Other ML11318A1552011-11-0303 November 2011 Drawing No. LR-STP-FP-7Q272F00046, Rev. 1, Piping and Instrumentation Diagram Fire Protection Loop. Project stage: Other ML11318A1482011-11-0303 November 2011 Drawing No. LR-STP-ED-5Q069F90011#2, Revision 1, Piping & Instrumentation Diagram Radioactive Vent and Drain System Fuel Handling Building Gravity Drains. Project stage: Other 2011-06-16
[Table View] |
|
---|
Category:Letter type:NOC
MONTHYEARNOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) NOC-AE-230039, Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/20230032023-12-12012 December 2023 Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/2023003 NOC-AE-230039, Submittal of Update Foreign Ownership, Control or Influence (FOCI)2023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) NOC-AE-220039, Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 252023-02-0606 February 2023 Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 25 NOC-AE-220038, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2022-06-23023 June 2022 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask NOC-AE-210038, Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 252022-01-0404 January 2022 Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 25 NOC-AE-21003858, 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes2021-12-0606 December 2021 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes NOC-AE-21003853, Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-12-0303 December 2021 Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003848, Unit 1 Cycle 24 Core Operating Limits Report2021-11-18018 November 2021 Unit 1 Cycle 24 Core Operating Limits Report NOC-AE-21003846, Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-11-0404 November 2021 Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003842, 10 CFR 50.59 Summary Report2021-09-23023 September 2021 10 CFR 50.59 Summary Report NOC-AE-21003841, Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25)2021-09-23023 September 2021 Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) NOC-AE-21003832, Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-09-0909 September 2021 Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003812, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-08-10010 August 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003825, Update of Foreign Ownership, Control, or Influence Information (FOCI)2021-08-0505 August 2021 Update of Foreign Ownership, Control, or Influence Information (FOCI) NOC-AE-21003824, Update Foreign Ownership, Control, or Influence (FOCI)2021-07-29029 July 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003823, Update Foreign Ownership Control or Influence (FOCI)2021-07-28028 July 2021 Update Foreign Ownership Control or Influence (FOCI) NOC-AE-21003820, Nuclear Insurance Protection2021-07-20020 July 2021 Nuclear Insurance Protection NOC-AE-21003819, Inservice Inspection Summary Report - 2RE212021-07-15015 July 2021 Inservice Inspection Summary Report - 2RE21 NOC-AE-21003816, Commitment Change Summary Report2021-06-30030 June 2021 Commitment Change Summary Report NOC-AE-21003814, Technical Specification Bases Control Program2021-06-24024 June 2021 Technical Specification Bases Control Program NOC-AE-21003810, Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy NOC-AE-21003811, Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy NOC-AE-21003806, Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval2021-05-20020 May 2021 Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval NOC-AE-21003801, Annual Dose Report for 20202021-04-26026 April 2021 Annual Dose Report for 2020 NOC-AE-21003802, 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report2021-04-26026 April 2021 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report NOC-AE-21003804, Operator Licensing Examination Schedule2021-04-21021 April 2021 Operator Licensing Examination Schedule NOC-AE-21003800, Radioactive Effluent Release Report2021-04-19019 April 2021 Radioactive Effluent Release Report NOC-AE-21003799, Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan2021-04-15015 April 2021 Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan NOC-AE-21003795, Cycle 22 Core Operating Limits Report2021-04-15015 April 2021 Cycle 22 Core Operating Limits Report NOC-AE-21003796, Update Foreign Ownership, Control, or Influence (FOCI)2021-04-15015 April 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003791, Financial Assurance for Decommissioning - 2021 Update2021-03-31031 March 2021 Financial Assurance for Decommissioning - 2021 Update NOC-AE-21003790, Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter)2021-03-31031 March 2021 Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter) NOC-AE-210037, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-21003792, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-200037, License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications2021-03-11011 March 2021 License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications NOC-AE-21003784, Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing2021-03-0808 March 2021 Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-21003786, Annual Fitness for Duty Performance Report for 20202021-03-0101 March 2021 Annual Fitness for Duty Performance Report for 2020 NOC-AE-21003785, Evidence of Financial Protection2021-02-23023 February 2021 Evidence of Financial Protection NOC-AE-21003781, Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts2021-01-27027 January 2021 Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts NOC-AE-21003780, Submittal of Update Foreign Ownership, Control, or Influence (FOCI)2021-01-0707 January 2021 Submittal of Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-20003778, Changes to South Texas Project Electric Generating Station Emergency Plan2020-12-17017 December 2020 Changes to South Texas Project Electric Generating Station Emergency Plan NOC-AE-20003777, STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency2020-12-10010 December 2020 STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency NOC-AE-20003766, Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan2020-12-0202 December 2020 Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan NOC-AE-20003767, Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-16016 November 2020 Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic NOC-AE-20003765, Inservice Testing Program Description for the Fourth Ten-Year Interval2020-10-28028 October 2020 Inservice Testing Program Description for the Fourth Ten-Year Interval NOC-AE-20003764, 1 RE22 Inspection Summary Report for Steam Generator Tubing2020-10-0707 October 2020 1 RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-20003762, Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen2020-09-22022 September 2020 Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen NOC-AE-20003761, Supplement to Exemption Request from 10 CFR 50 Appendix E Due to COVID-19 Pandemic2020-09-10010 September 2020 Supplement to Exemption Request from 10 CFR 50 Appendix E Due to COVID-19 Pandemic NOC-AE-20003760, Update Foreign Ownership. Control. or Influence(FOCI)- Transmittal2020-09-0808 September 2020 Update Foreign Ownership. Control. or Influence(FOCI)- Transmittal 2023-07-11
[Table view] |
Text
Nuclear Operating Company South Texas Prolect Eletric GeneratinmgStation PO Box 289 Wadsworth. Texas 77483 February 6, 2012 NOC-AE-12002786 10 CFR 54 STI: 33263076 File: G25 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2746 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Response to Requests for Additional Information for the South Texas Project License Renewal Application Aging Management Program, Set 10 (RAI 4.7.3-2) (TAC Nos. ME4936 and ME4937)
References:
- 1. STPNOC letter dated October 25, 2010, from G. T. Powell to NRC Document Control Desk, "License Renewal Application" (NOC-AE-10002607) (ML103010257)
- 2. NRC letter dated December 14, 2011, "Requests for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application -
Aging Management, Set 10 (TAC Nos. ME4936 and ME 4937)"(ML11332A100)
- 3. STPNOC letter dated January 18, 2012, from D. W. Rencurrel to NRC Document Control Desk, "Response to Requests for Additional Information for the South Texas Project License Renewal Application Aging Management Program, Set 10 (TAC Nos. ME4936 and ME 4937)" (NOC-AE-1 1002779) (ML12020A072)
By Reference 1, STP Nuclear Operating Company (STPNOC) submitted a License Renewal Application (LRA) for South Texas Project (STP) Units 1 and 2. By Reference 2, the NRC staff requests additional information (RAI) for review of the STP LRA. STPNOC's response to the requests for additional information was provided by Reference 3 with the exception of a response to RAI 4.7.3-2. Enclosure 1 to this letter provides a response to RAI 4.7.3-2. Changes to LRA described in Enclosure 1 are depicted in a line-in/line-out page provided in Enclosure 2.
There are no regulatory commitments provided in this letter.
Should you have any questions regarding this letter, please contact either Arden Aldridge, STP License Renewal Project Lead, at (361) 972-8243 or Ken Taplett, STP License Renewal Project regulatory point-of-contact, at (361) 972-8416.
NOC-AE-12002786 Page 2 I declare under penalty of perjury that the foregoing is true and correct.
Executed on 2-/b2lz.l Date D. W. Rencurdel Senior Vice President, Technical Support & Oversight KJT
Enclosure:
- 1. STPNOC Response to RAI 4.7.3-2
- 2. STPNOC LRA Changes with Line-in/Line-out Annotations
NOC-AE-12002786 Page 3 cc:
(paper copy) (electronic copy)
Regional Administrator, Region IV A. H. Gutterman, Esquire U. S. Nuclear Regulatory Commission Kathryn M. Sutton, Esquire 1600 East Lamar Boulevard Morgan, Lewis & Bockius, LLP Arlington, Texas 76011-4511 Balwant K. Singal John Ragan Senior Project Manager Chris O'Hara U.S. Nuclear Regulatory Commission Jim von Suskil One White Flint North (MS 8B1) NRG South Texas LP 11555 Rockville Pike Rockville, MD 20852 Senior Resident Inspector Kevin Polio U. S. Nuclear Regulatory Commission Richard Pena P. 0. Box 289, Mail Code: MN1 16 City Public Service Wadsworth, TX 77483 C. M. Canady Peter Nemeth City of Austin Crain Caton & James, P.C.
Electric Utility Department 721 Barton Springs Road C. Mele Austin, TX 78704 City of Austin John W. Daily Richard A. Ratliff License Renewal Project Manager (Safety) Alice Rogers U.S. Nuclear Regulatory Commission Texas Department of State Health Services One White Flint North (MS 011-Fl)
Washington, DC 20555-0001 Tam Tran Balwant K. Singal License Renewal Project Manager John W. Daily (Environmental) Tam Tran U. S. Nuclear Regulatory Commission U. S. Nuclear Regulatory Commission One White Flint North (MS O11F01)
Washington, DC 20555-0001
Enclosure 1 NOC-AE-12002786 Enclosure I STPNOC Response to RAI 4.7.3-2
Enclosure 1 NOC-AE-12002786 Page 1 of 3 STPNOC Response to RAI 4.7.3-2 SOUTH TEXAS PROJECT, UNITS I AND 2 REQUEST FOR ADDITIONAL INFORMATION -
AGING MANAGEMENT, SET 10 (TAC NOS. ME4936 AND ME4937)
RAI 4.7.3-2 (066)
Backgqround:
In a letter dated September 21, 2011, the staff issued RAI 4.7.3-1, requesting that the applicant state how visual inspections in the Open-Cycle Cooling Water System program are capable of ensuring that corrosion in the essential cooling water (ECW) system will not exceed the 40-mil corrosion allowance, given that LRA Section 4.7.3 documented the use of this program as the disposition for the related TLAA.
In its response dated November 21, 2011, the applicant stated that ECW corrosion is managed consistent with NRC Generic Letter 89-13. The applicant also stated that, when visual inspections identify corrosion, thickness measurements are taken as part of the corrective action program.
Issue:
The staff lacks sufficient information to conclude that visual inspections alone will be capable of prompting follow-up thickness measurements such that the 40-mil corrosion allowance will not be exceeded during the period of extended operation. The staff believes that visual examinations may need to be augmented with physical measurements, using tools such as inside calipers, to ensure that corrosion is not approaching the limit. Given that physical measurements may be required to augment the visual inspections, the staff requires further details on how the program will manage this TLAA, such as how often physical measurements will be conducted, how many locations will be checked, how the most susceptible location will be selected, what devices will be used, and the criteria that would result in a follow-up volumetric examination.
Request:
- 1. State how visual inspections of the ECW system, without augmented physical measurements, will be capable of detecting a 40-mil loss of material.
- 2. Alternatively, state what augmented inspection techniques will be used to detect loss of material.
Include information such as how often physical measurements will be conducted, how many locations will be checked, how the most susceptible location will be selected, what devices will be used, and the criteria that would result in a follow-up volumetric examination in sufficient detail such that the staff can independently conclude that the inspection methodologies will adequately manage loss of material for this TLAA.
Enclosure 1 NOC-AE-12002786 Page 2 of 3 STPNOC Response:
LRA Section 4.7.3 was reviewed along with the station's responses to NRC Generic Letter (GL) 89-13, "Service Water System Problems Affecting Safety-Related Equipment". The review concluded that the corrosion effects in the Essential Cooling Water (ECW) system were incorrectly identified as a time-limiting aging analysis (TLAA) in the LRA. They are not a TLAA as defined by 10 CFR 54.3(a), criteria 3 and 4.
STP response to GL 89-13 dated January 29, 1990 (ST-HL-AE-3341), "Service Water System Problems Affecting Safety-Related Equipment" stated:
STPEGS has a program to chemically treat the ECW to limit biological fouling. Clams have not been found since the ECP was chemically shocked with sodium hypochlorite.
The predominant biological fouling species of concern is bryozoa, which is controlled using sodium hypochlorite additions on a routine basis. Scaling and corrosion inhibitors are also adcled to the ECW. HL&P has not found it necessary to continuously chlorinate the ECP.
The revised response to GL 89-13 dated June 23, 1992, (ST-HL-AE-4126), "Revised Response to NRC Generic Letter 89-13, "Service Water System Problems Affecting Safety-Related Equipment," presented the following statements:
Under Recommended Action I of the Generic Letter, HL&P was to implement and maintain an ongoing program of surveillance and control techniques to significantly reduce the incidence of flow blockage problems as a result of biofouling of the Essential Cooling Water System (ECW). Included in the response was a statement that "scaling and corrosion inhibitors are also added to the ECW." HL&P considers the addition of corrosion inhibitors to the ECW system an option and has discontinued this treatment.
Use of corrosion inhibitors was discontinued because operational experience has shown that the corrosion rate without inhibitors has no impact on the design life of the ECW system. Without the inhibitors, the corrosion rate is 0.6 mil/year compared to less than 0.1 mil/year with the inhibitor. Assuming 40 years of service life, this will not result in corrosion exceeding the design level of 40 mils.
The statements regarding corrosion rate, service life, and design level do not represent licensee calculations or analyses that meet the 10 CFR 54.3(a) definition of a TLAA for reasons stated below.
Corrosion rate The corrosion rate of 0.6 mil/year and the design level of 40 mils were originally utilized as justification for eliminating use of corrosion inhibitors in the response to GL 89-13 dated June 23, 1992. Application of corrosion inhibitors was intended to address the potential for flow blockage in the ECW heat exchangers. Subsequent review determined that use of corrosion inhibitors could be discontinued because ECW heat exchanger fouling, as well as ECW piping integrity, are effectively managed through proper water
Enclosure 1 NOC-AE-12002786 Page 3 of 3 chemistry, routine heat exchanger testing, and system maintenance, consistent with the guidance of GL 89-13.
The corrosion rate of 0.6 mil/year was identified through a NALCO corrosion correlator which measures the corrosive characteristics of the water chemistry. The correlator provides an indication of the general corrosion rate but does not measure a corrosion rate in any specific area of the pipe wall. This instrument is utilized as one parameter in adjusting and optimizing the ECW water chemistry. The optimized ECW chemistry is used as a basis to address potential heat exchanger fouling or flow blockage. The 0.6 mil/year corrosion rate is not utilized in a plant analysis for making a safety determination for the ECW system. Therefore, criterion 4 of 10 CFR 54.3(a) is not met.
The Open Cycle Cooling Water System Program, B2.1.9, manages aging effects of the ECW system to provide reasonable assurance that the intended safety functions will be met.
Desigqn level of 40 mils The 40 mils is not a design level or limit but is an allowance that is part of the design methodology which provides an additional conservative factor for determining the design minimum wall requirements for the piping service pressure, temperature, and allowable stresses. The 40 mils includes the threading, grooving, mechanical strength, corrosion, erosion, etc, allowance applied to the piping design piping minimum wall thickness calculations for aluminum-bronze piping with diameters of greater than or equal to four inches. There is no time dependence placed on this allowance. Utilization of the 40 mil design allowance does not meet 10 CFR 54.3(a) criterion 3 in that there is not a time-limited assumption inferred in the piping minimum wall thickness calculations where the 40 mil allowance is applied.
ECW heat exchanger performance is effectively managed through proper water chemistry, routine heat exchanger testing, and system maintenance. The ECW piping integrity is monitored with visual inspections and/or non-destructive examinations (NDE) through the Open-Cycle Cooling Water System Program, B2.1.9, consistent with the requirements of NRC Generic Letter 89-13.
Corrosion effects will be managed during the period of extended operation as described in Open-Cycle Cooling Water System Program B2.1.9, to provide reasonable assurance that the intended function of the ECW system is maintained during the period of extended operation.
It is concluded that the 0.6 mil/year corrosion rate used in the response to GL 89-13 as well as the 40 mils allowance were incorrectly identified in LRA section 4.7.3 as a time-dependent analysis. The LRA is revised to delete Section 4.7.3.
See Enclosure 2 for the revision to LRA Section 4.7.3.
Enclosure 2 NOC-AE-12002786 Enclosure.2 STPNOC LRA Changes with Line-inlLine-out Annotations
Enclosure 2 NOC-AE-12002786 Page 1 of 2 List of Revised LRA Section RAI Affected LRA Section RAI 4.7.3-2 4.7.3
Enclosure 2 NOC-AE-12002786 Page 2 of 2 4.7.3 This section not used. T-AA for the COFoeion Effects in ,the E.s..ent. Cooling WatOr (EC"~ System In response to NRC Generic Letter 89 13, STPR committed to implementation and m~aintenancep of a surveillance and control program; to significantly redure thoeniec of flow blockage problemns as a resul~t Of biofouling. Included in this respnei statement that "Scaling and corros~ion inhibitors are also addedd to the ECW." T-his comnmitment was subsequently revised, and the use of corrosion inhibitors was-discontinued at ST-P, based OR the following:
Without the inhibfitors, the corrosion rate is 0.6 millyear compared to less than 0.1 mV/iyear with the inhibitor. A-ssuming 40 years of ste~rvice lie, this will not result in corroion xceeding the design level of 40 milss. This conclusion is based OR a 40 yearF plant life. Therefore, this analysis is a T-LA..
Disposition: Aging Management, 10 CFR 54.21 (c)(1)(aii)
Corr-osion effects in the essential cooling water system are managed under the Open Cycle Cooling Water program described in B2.1.9. Therefore, corrosion effect will be managed during the pwerid of extended operation. This TLAA is dispositionodi accordance with 10 CFR 5412 1(c)(1)(iii).