Letter Sequence RAI |
---|
EPID:L-2023-LLR-0004, Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspections (Relief Request RR-ENG-4-06) (Approved, Closed) |
|
MONTHYEARML23032A4842023-02-0101 February 2023 Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspections (Relief Request RR-ENG-4-06) Project stage: Request ML23065A0912023-03-0303 March 2023 NRR E-mail Capture - South Texas Project - Draft Supplemental Information Request - Proposed Alternative to the Requirements of the ASME Code Project stage: Draft Other ML23068A3642023-03-0909 March 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) Project stage: Supplement ML23096A1592023-04-0606 April 2023 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code Project stage: Acceptance Review ML23115A0702023-04-24024 April 2023 NRR E-mail Capture - South Texas Project Units 1 and 2 - Audit Plan - Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections Project stage: Other ML23229A4992023-08-17017 August 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) Project stage: Supplement ML23319A4442023-11-15015 November 2023 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements Project stage: Draft RAI ML23334A0062023-11-29029 November 2023 NRR E-mail Capture - South Texas Project - Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements Project stage: RAI NOC-AE-230040, Update Foreign Ownership, Control, or Influence (FOCI)2023-12-0505 December 2023 Update Foreign Ownership, Control, or Influence (FOCI) Project stage: Request ML24033A3002024-02-0707 February 2024 Summary of Regulatory Audit Regarding a Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections Project stage: Other ML24040A1962024-02-13013 February 2024 Authorization and Safety Evaluation for Alternative Request No. RR-ENG-4-06 Project stage: Approval 2023-03-09
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24086A4212024-06-26026 June 2024 Email to Chris Warren Decision on the Exemption Request for South Texas Project ML24086A4252024-06-24024 June 2024 Email to Chris Warren Availability of Environmental Assessment for the South Texas Project Exemption ML24101A0082024-04-10010 April 2024 NRR E-mail Capture - South Texas Project - Relief Request - 50.55a(z)(2) - Rvh Penetration 75 ML24052A0152024-02-20020 February 2024 NRR E-mail Capture - South Texas Project - Request for Additional Information - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications (L-2023-LLE-0046) ML24052A0112024-02-16016 February 2024 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications (L-2023-LLE-0046) ML23334A0062023-11-29029 November 2023 NRR E-mail Capture - South Texas Project - Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements ML23319A4442023-11-15015 November 2023 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements ML23278A1532023-10-0505 October 2023 NRR E-mail Capture - South Texas Project Request for Additional Information - Request for Indirect Transfer of Licenses and Conforming Amendments (L-2023-LLM-0004) ML23264A0972023-09-21021 September 2023 NRR E-mail Capture - South Texas Project - Request for Additional Information - License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23255A2862023-09-12012 September 2023 NRR E-mail Capture - South Texas Project Draft Request for Additional Information License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23191A0102023-07-0707 July 2023 NRR E-mail Capture - South Texas Project - Acceptance of Request for Indirect Transfer of Licenses and Conforming Amendments (L-2023-LLM-0004) ML23145A1872023-05-24024 May 2023 July 2023 Emergency Preparedness Program Inspection - Request for Information ML23124A3272023-05-0404 May 2023 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23115A0702023-04-24024 April 2023 NRR E-mail Capture - South Texas Project Units 1 and 2 - Audit Plan - Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections ML23096A1592023-04-0606 April 2023 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code ML23065A0912023-03-0303 March 2023 NRR E-mail Capture - South Texas Project - Draft Supplemental Information Request - Proposed Alternative to the Requirements of the ASME Code ML23003A8082022-11-28028 November 2022 NRR E-mail Capture - Texas Commission on Environmental Quality (TCEQ) Review/Comment Regarding the Draft Environmental Assessment for the South Texas Project Alternate Disposal Request (L-2021-LLL-0022)) ML22249A0692022-09-0606 September 2022 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements (L-2002-LLA-0113) ML22206A0142022-07-20020 July 2022 NRR E-mail Capture - South Texas Project - Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22194A0502022-07-0707 July 2022 NRR E-mail Capture - South Texas Project - Updated Draft Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22194A0492022-06-0808 June 2022 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22123A3272022-05-0303 May 2022 STP EP Exercise Inspection July 2022 RFI ML22115A2632022-04-19019 April 2022 Email Response to David Lochbaum Regarding Interim Configuration of Holtec HI-STORE FW Spent Fuel Multipurpose Canister at South Texas Project Energy Generating Station ML22105A5642022-04-0505 April 2022 Request for Information for Problem Identification and Resolution at STP Nuclear Operating Company ML21344A0072021-12-0909 December 2021 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Alternative Disposal Request ML21305B8022021-11-0101 November 2021 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Inservice Inspection Impracticality ML21257A2262021-09-14014 September 2021 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (L-2021-LLA-0151) ML21160A1522021-06-0909 June 2021 Request for Information NRC Inspection 2021-003 Public Radiation Safety ML21133A2372021-05-0505 May 2021 Request for Additional Information: STP EP Exercise Inspection - July 2021 ML21117A3242021-04-22022 April 2021 NRR E-mail Capture - (External_Sender) STP Questions About Eplan Amendment SE ML21103A0072021-04-12012 April 2021 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Add a Note to TS 3.6.3 and to Remove the TS Index (L-2021-LLA-0041) ML21058A0002021-02-26026 February 2021 NRR E-mail Capture - South Texas Units 1 and 2 - License Amendment Request to Revise Moderator Temperature Coefficient SRs - Audit Plan and Setup of Online Document Access (L-2021-LLA-0004) ML21049A2652021-02-16016 February 2021 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Revise the Moderator Temperature Coefficient Surveillance Requirements (L-2021-LLA-0004) ML21039A8902021-02-0808 February 2021 NRR E-mail Capture - South Texas Project - Request for Additional Information - 1RE22 Inspection Summary Report for Steam Generator Tubing ML21029A3312021-01-29029 January 2021 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - 1RE22 Inspection Summary Report for Steam Generator Tubing ML20244A0222020-08-28028 August 2020 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil. (L-2020-LLA-0172) ML20135H1982020-05-14014 May 2020 NRR E-mail Capture - South Texas Unit 1 - License Amendment Request to Revise Safety Injection System Accumulator Pressure - Audit Plan and Setup of Online Reference Portal ML20125A3312020-05-0404 May 2020 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Revise the Emergency Plan (L-2020-LLA-0057) ML20111A0052020-04-17017 April 2020 NRR E-mail Capture - South Texas Project - Request for Additional Information - Proposed Alternative to ASME OM Code 2012 Edition - Relief Request PRR-01 ML20050E1192020-02-19019 February 2020 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Actions - Proposed Alternatives to ASME OM Code Requirements (EPID: L 2020-LLR-0007 to L-2020-LLR-0010) ML19344A0092019-12-0909 December 2019 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping ML19309F1412019-11-0404 November 2019 Supplemental Information Request - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping (EPID L 2019-LLR-0096) (Draft) ML19291A0332019-10-17017 October 2019 NRR E-mail Capture - Acceptance Review Results: STP License Amendment Request Regarding Request to Delete E Bar Definition ML19165A1032019-06-14014 June 2019 NRR E-mail Capture - Draft RAI for STP TS 3.8.1.1 Sbdg SR Change ML19162A1162019-05-22022 May 2019 NRR E-mail Capture - Acceptance Review Results: STP License Amendment Request Regarding TSTF-529 ML19095A6562019-04-0404 April 2019 NRR E-mail Capture - (External_Sender) Handout for 4/10/19 Meeting to Discuss a Proposed Request for South Texas Project, Units 1 and 2, Regarding Repair of Piping Using Carbon Fiber Repair Methods ML19081A1512019-03-21021 March 2019 NRR E-mail Capture - Draft Round 2 RAI - Sbdg Voltage and Frequency LAR (L-2018-LLA-0078) ML19078A3792019-03-19019 March 2019 NRR E-mail Capture - Acceptance Review Results: STP RR-ENG-3-23 (L-2018-LLR-0021) ML18292A7272018-10-19019 October 2018 NRR E-mail Capture - Acceptance Review Results: TSTF-522 (L-2018-LLA-0271) ML18283B9522018-10-10010 October 2018 NRR E-mail Capture - Final RAI - South Texas Standby DG TS Change (L-2018-LLA-0078) 2024-06-26
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24207A1782024-07-25025 July 2024 Licensed Operator Positive Fitness-For-Duty Test ML24052A0112024-02-16016 February 2024 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications (L-2023-LLE-0046) ML24024A1162024-01-24024 January 2024 STP Unit 2 Request for Information ML23334A0062023-11-29029 November 2023 NRR E-mail Capture - South Texas Project - Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements ML23319A4442023-11-15015 November 2023 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements ML23278A1532023-10-0505 October 2023 NRR E-mail Capture - South Texas Project Request for Additional Information - Request for Indirect Transfer of Licenses and Conforming Amendments (L-2023-LLM-0004) ML23264A0972023-09-21021 September 2023 NRR E-mail Capture - South Texas Project - Request for Additional Information - License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23255A2862023-09-12012 September 2023 NRR E-mail Capture - South Texas Project Draft Request for Additional Information License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23145A1872023-05-24024 May 2023 July 2023 Emergency Preparedness Program Inspection - Request for Information ML22255A1542022-09-13013 September 2022 Operating Company Information Request for the Cyber Security Baseline Inspection 05000498/2022401 and 05000499/2022401 ML22206A0142022-07-20020 July 2022 NRR E-mail Capture - South Texas Project - Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22194A0502022-07-0707 July 2022 NRR E-mail Capture - South Texas Project - Updated Draft Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22194A0492022-06-0808 June 2022 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22123A3272022-05-0303 May 2022 STP EP Exercise Inspection July 2022 RFI ML22084A0762022-04-0404 April 2022 Notification of NRC Design Bases Assurance Inspection (Team) (05000498/2022012 and 05000499/2022012) and Request for Information ML21286A5732021-10-18018 October 2021 Notification of NRC Design Bases Assurance Inspection (Programs) (05000498/2022011 and 05000499/2022011) and Request for Information ML21166A2392021-06-16016 June 2021 Notification of Inspection (NRC Inspection Report 05000498/2021003 and 05000499/2021003) and Request for Information ML21160A1522021-06-0909 June 2021 Request for Information NRC Inspection 2021-003 Public Radiation Safety ML21133A2372021-05-0505 May 2021 Request for Additional Information: STP EP Exercise Inspection - July 2021 ML21039A8902021-02-0808 February 2021 NRR E-mail Capture - South Texas Project - Request for Additional Information - 1RE22 Inspection Summary Report for Steam Generator Tubing ML21029A3312021-01-29029 January 2021 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - 1RE22 Inspection Summary Report for Steam Generator Tubing ML20280A5452020-08-17017 August 2020 STP 2020 PIR Request for Information ML20111A0052020-04-17017 April 2020 NRR E-mail Capture - South Texas Project - Request for Additional Information - Proposed Alternative to ASME OM Code 2012 Edition - Relief Request PRR-01 ML20070N0222020-03-10010 March 2020 NRC Selection for Onsite Review ML20057G4612020-02-26026 February 2020 05000498/499 Request for Information - Occupational Radiation Safety Inspection ML20045E2172020-02-13013 February 2020 Licensed Operator Positive Fitness-For-Duty Test ML20036F5862020-02-0404 February 2020 Request for Additional Information - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping (EPID L-2019-LLR-0096)Redacted ML19165A1032019-06-14014 June 2019 NRR E-mail Capture - Draft RAI for STP TS 3.8.1.1 Sbdg SR Change ML19081A1512019-03-21021 March 2019 NRR E-mail Capture - Draft Round 2 RAI - Sbdg Voltage and Frequency LAR (L-2018-LLA-0078) ML18283B9522018-10-10010 October 2018 NRR E-mail Capture - Final RAI - South Texas Standby DG TS Change (L-2018-LLA-0078) ML18263A1432018-09-12012 September 2018 NRR E-mail Capture - Final RAI for South Texas Project RR-ENG-E-16 (L-2018-LLR-0097) ML18197A4172018-07-17017 July 2018 Notification of NRC Triennial Heat Sink Performance Inspection (05000498/2018003 and 05000499/2018003) and Request for Information ML18003B4222018-01-0303 January 2018 NRR E-mail Capture - Final Request for Additional Information Amendment Request to Modify the Emergency Response Organization for South Texas Project ML17229B4672017-08-16016 August 2017 Notification of NRC Inspection 05000499/2017008 and Request for Information ML17132A0712017-05-15015 May 2017 Information Request the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000498/2017407; 05000499/2017407 ML17103A6272017-04-13013 April 2017 Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000498/2017007 and 05000499/2017007) and Request for Information ML16351A1502016-12-16016 December 2016 Correction Letter Closeout of Request for Information Questions That Are No Longer Applicable Associated with the Resolution of Generic Safety Issue 191 (CAC Nos. MF2400 - MF2409) ML16302A4532016-12-12012 December 2016 Closeout of Request for Additional Information Questions That Are No Longer Applicable, Resolution of Generic Safety Issue (GSI) 191 (CAC Nos. MF2400-MF2409) ML16343A0422016-12-0808 December 2016 Request for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application (CAC NOS. ME4936, ME4937) ML16340A1022016-12-0505 December 2016 Requests for Additional Information for the Review of the South Texas Project License Renewal Application (CAC Nos. ME4936 and ME4937) ML16246A0952016-09-15015 September 2016 Correction to 8/26/16 Request for Additional Information Enclosure, License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies ML16214A2912016-08-26026 August 2016 Summary of June 28-30, 2016, Regulatory Audit at Westinghouse in Rockville, MD, License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies ML16187A0522016-07-0707 July 2016 Request for Additional Information Regarding License Renewal Application ML16141B0812016-05-31031 May 2016 Audit Summary, Risk Audit on April 12-13, 2016, at Alumni Center at the University of Texas, Austin, Tx; Pilot Generic Safety Issue 191 Submittal and Exemption Request, and Draft Request for Additional Information ML16125A2902016-05-26026 May 2016 Request for Additional Information, Risk Review, Exemption and License Amendment Request for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 (CAC Nos. MF2400-MF2409) ML16127A4522016-05-12012 May 2016 Supplemental Information Needed for Acceptance of Requested Licensing Action, Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies ML16104A3522016-04-22022 April 2016 Requests for Additional Information Set 35 for the Review of the South Texas Project License Renewal Application (Tac Nos. ME4936, ME4937) ML16082A5072016-04-11011 April 2016 Request for Additional Information, Phased Response Requested, Exemption and License Amendment Request for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 (CAC Nos. MF2400-MF2409) ML16082A4842016-03-22022 March 2016 NRR E-mail Capture - South Texas Project Units 1 & 2, Draft Request for Additional Information for Risk Review for GSI-191 ML16081A0042016-03-18018 March 2016 NRR E-mail Capture - South Texas Project Units 1 & 2, Draft Request for Additional Information for Thermal-hydraulic Review for GSI-191 2024-07-25
[Table view] |
Text
From: Dennis Galvin Sent: Wednesday, November 29, 2023 7:02 PM To: Wendy Brost (webrost@stpegs.com)
Cc: Dibbern, Zachary
Subject:
South Texas Project - Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements (EPID: L 2023-LLR-0004)
Attachments: STP RR-ENG-4-06 Tendon Inspection RAI Issued 2023-11-29.pdf
Dear Ms. Brost,
By letter dated February 1, 2023 (ADAMS Accession No. ML23032A484), as supplemented by letters dated March 9, 2023 and August 17, 2023 (ML23068A364 and ML23229A499, respectively), STP Nuclear Operating Company (STPNOC, the licensee) submitted a proposed alternative to the Subsection IWL of the American Society of Mechanical Engineers (ASME)
Boiler and Pressure Vessel (BPV) Code,Section XI, Rules for In-Service Inspection of Nuclear Power Plant Components, regarding the frequency of certain Containment Unbonded Post-Tensioning System Inservice Inspection at South Texas Project (STP) Units 1 and 2.
The NRC staff has determined that additional information is needed to complete its review. The requests for additional information (RAIs) were transmitted to the licensee in draft form on November 15, 2023. On November 27, 2023, the licensee indicated that a clarification call was not necessary, and subsequently the licensee agreed to provide responses to the RAls by December 27, 2023. The NRC staff agrees with this date.
Respectfully,
Dennis Galvin Project Manager U.S Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Operating Reactor Licensing Licensing Project Branch 4 301-415-6256
Docket No. 50-498 and 50-499
Hearing Identifier: NRR_DRMA Email Number: 2318
Mail Envelope Properties (SA1PR09MB8111E9A5F2CE28A9B7691861FB82A)
Subject:
South Texas Project - Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements (EPID L 2023-LLR-0004)
Sent Date: 11/29/2023 7:01:47 PM Received Date: 11/29/2023 7:01:00 PM From: Dennis Galvin
Created By: Dennis.Galvin@nrc.gov
Recipients:
"Dibbern, Zachary" <zedibbern@STPEGS.COM>
Tracking Status: None "Wendy Brost (webrost@stpegs.com)" <webrost@stpegs.com>
Tracking Status: None
Post Office: SA1PR09MB8111.namprd09.prod.outlook.com
Files Size Date & Time MESSAGE 1307 11/29/2023 7:01:00 PM STP RR-ENG-4-06 Tendon Inspection RAI Issued 2023-11-29.pdf 260775
Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
REQUEST FOR ADDITIONAL INFORMATION
PROPOSED ALTERNATIVE TO ASME CODE, SECTION XI REQUIREMENTS FOR
CONTAINMENT BUILDING INSPECTIONS
STP NUCLEAR OPERATING COMPANY
SOUTH TEXAS PROJECT, UNITS 1 AND 2
DOCKET NOS. 50-498 AND 50-499
By letter dated February 1, 2023 (ADAMS Accession No. ML23032A484), as supplemented by letters dated March 9, 2023 and August 17, 2023 (ML23068A364 and ML23229A499, respectively), STP Nuclear Operating Company (STPNOC, the licensee) submitted a proposed alternative to the Subsection IWL of the American Society of Mechanical Engineers (ASME)
Boiler and Pressure Vessel (BPV) Code,Section XI, Rules for In-Service Inspection of Nuclear Power Plant Components, regarding the frequency of certain Containment Unbonded Post-Tensioning System Inservice Inspection at South Texas Project (STP) Units 1 and 2. The proposed alternative designated as revised Relief Request RR-ENG-4-06, refers to the version enclosed in the supplemental letter dated August 17, 2023.
RAI 1
Regulatory Basis:
ASME Section XI, IWL-2421 states, for sites with multiple plants utilizing the same prestressing system and are essentially identical in design, the inspection dates and examination requirements may be as follows.
- 1) For the containment with the first Structural Integrity Test, all examinations required by IWL-2520 shall be performed at 1, 3, and 10 years and every 10 years thereafter. In addition, the examinations required by IWL-2524 and IWL-2525 shall be performed at 5 and 15 years and every 10 years thereafter.
- 2) For each subsequent containment constructed at the site, all examinations required by IWL-2520 shall be performed at 1, 5, and 15 years and every 10 years thereafter. In addition, the examinations required by IWL-2524 and IWL-2525 shall be performed at 3 and 10 years and every 10 years thereafter.
Background:
Section 5.1 of the revised Relief Request RR-ENG-4-06 enclosure proposes the following alternative to IWL-2421(b) examination schedules:
- 1) For Unit 1, all examinations required by IWL-2520 shall be performed at 1, 3, and 10 years, and every 10 years thereafter. In addition, the examinations required by IWL-2524 and IWL-2525 shall be performed at 5, 15, 25, and 40 years and every 10 years thereafter.
- 2) For Unit 2, all examinations required by IWL-2520 shall be performed at 1, 5, 15, 25, and 40 years, and every 10 years thereafter. In addition, the examinations required by IWL-2524 and IWL-2525 shall be performed at 3 and 10 years and every 10 years thereafter.
The revised Section 5.1 also states, This relief request will only cover through year 40.
Implementation of this plan in years 45 and beyond will require additional relief requests after the 40th year.
The revised Section 6.8 of the RR-ENG-4-06 enclosure states in parts, The Proposed Alternative Surveillance, if approved, would skip the 35 th year surveillance elements associated with IWL-2520 and perform full surveillances in both units during the 40 th... Liftoff testing is scheduled to occur again in Unit 1 in year 40. Therefore, the proposed alternative would make no change to the Unit 1 surveillance schedule for liftoff testing. Liftoff testing is scheduled to occur in Unit 2 in years 35, 45 and 55. The proposed alternative would change that to years 40 and 50*, aligned with Unit 1 liftoff testing. That would introduce a one-time surveillance interval of 15 years between liftoff tests in Unit 2 (between years 25 and 40), with 10-year intervals thereafter*.
The revised Section 6.8 of the RR-ENG-4-06 enclosure also states that, The proposed alternative surveillance extends the interval for visual anchorage inspections from 5 years to 10 years*, with the asterisk stating,
- Assuming acceptance of future relief requests for each 10-year interval; otherwise, surveillances will be continued as required.
Issues:
The proposed alternative discusses future alternatives to IWL-2421(b) for the 40 th year and beyond in addition to the alternative at the 35 th year. The future alternatives are out of our review scope and make the proposed alternative unclear. The proposed alternative adds items L2.10 and L2.20 examinations at Unit 2 for the 40 th and 50th year, but eliminates all examinations at year 45 and 55, that results in performing L2.10 and L2.20 examinations at both units at 40 th year and every 10 years thereafter. The proposed alternative plans to perform items L2.30 to L2.50 examinations at 40 th year and every 10 years thereafter for both Units.
It is the NRC staffs understanding that this relief request only seeks NRCs approval through the 40th year. However, the NRC staff does not find the proposed alternative for the 40 th year and beyond reasonable, and thus does not provide an acceptable level of quality and safety, because: 1) the proposed alternative may allow undetected degradations every 5 years to advance for up to 10 years before taking the necessary corrective actions to preserve the intended function of the unbonded post-tensioning system; 2) the NRC staff only allows for one -
time interval extension if permitted, based on its review of the plant-specific testing results and operating experience provided in the relief request; 3) the NRC staff does not find it reasonable to extend the inspection intervals for the 40 th year and beyond, without reviewing the results of the fourth IWL containment inservice inspection interval inspections, conducted prior to the initiation of the fifth CISI interval; and 4) the NRC staff has not authorized such requests beyond one 10-year interval for any plant, even though requests for authorization through end of license were made for at least three recent similar proposed alternative requests for unbonded post-tensioning system inspection intervals (i.e., Palo Verde (ML22124A241), Calvert Cliffs (ML21190A004), Braidwood and Byron (ML21134A006) and NRC staff stated that its rationale in the SEs. Therefore, the Table IWL-2500-1-(L-B) examination schedules for items L2.10 through L2.50 for both Unit 1 and Unit 2 should remain unchanged for the 40 th year and beyond to provide an acceptable level of quality and safety.
Request:
Revise the proposed alternative to provide an acceptable level of quality and safety for the 40 th year and beyond. For example, keep the Table IWL-2500-1-(L-B) examination schedules unchanged for items L2.10 through L2.50 for both Unit 1 and Unit 2 for the 40 th year and beyond and update the relief request accordingly.