ML22255A154

From kanterella
Jump to navigation Jump to search
Operating Company Information Request for the Cyber Security Baseline Inspection 05000498/2022401 and 05000499/2022401
ML22255A154
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 09/13/2022
From: Nnaerika Okonkwo
NRC/RGN-IV/DORS/EB2
To: Gerry Powell
South Texas
Okonkwo N
References
IR 2022401
Download: ML22255A154 (11)


See also: IR 05000498/2022401

Text

September 13, 2022

Mr. G. T. Powell, President

and CEO

STP Nuclear Operating Company

P.O. Box 289,

Wadsworth, TX 77483

SUBJECT:

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1, AND

2 - INFORMATION REQUEST FOR THE CYBERSECURITY BASELINE

INSPECTION, NOTIFICATION TO PERFORM INSPECTION 05000498/2022401

AND 05000499/2022401

Dear Mr. Powell:

On November 28, 2022, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline

inspection in accordance with Inspection Procedure (IP) 71130.10 Cybersecurity, at your

South Texas Project Electric Generating Station, Units 1, and 2. The inspection objectives are to

provide assurance that the digital computer and communication systems and networks

associated with safety, security, or emergency preparedness (SSEP) functions are adequately

protected against cyberattacks in accordance with Title 10 of the Code of Federal Regulations

(10 CFR) 73.54 and your approved cybersecurity plan (CSP), and to verify that any CSP

changes and reports have been made in accordance with 10 CFR 50.54(p).

Experience has shown that baseline inspections are extremely resource intensive, both for the

NRC inspectors and licensee staff. To minimize the inspection impact on the site and to ensure

a productive inspection for both parties, we have enclosed a request for documents needed for

the inspection. These documents have been divided into four groups.

The first group specifies information necessary to assist the inspection team in choosing the

focus areas (i.e., sample set) to be inspected by the cyber security IP. This information should

be made available via digital media (CD/DVD) or an online document repository and

delivered/available to the regional office no later than October 7, 2022. The inspection team will

review this information and, by October 17, 2022, will request the specific items that should be

provided for review.

The second group of requested documents will assist the inspection team in the evaluation of

the critical systems and critical digital assets (CSs/CDAs), defensive architecture, and the areas

of your cyber security program selected for review. This information will be requested for review

in the regional office prior to the inspection by November 7, 2022, as identified above.

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

The third group of requested documents consists of additional items that the inspection team

will review, or need access to, during the inspection. Please have this information available by

the first day of the onsite inspection, November 28, 2022.

The fourth group of information aids the inspection team in tracking issues identified during the

inspection. It is requested that this information be provided to the lead inspector as the

information is generated during the inspection. It is important that all requested documents are

up-to-date and complete to minimize the number of additional documents requested during the

preparation and/or the onsite portions of the inspection.

The lead inspector for this inspection is Nnaerika Okonkwo. We understand that our regulatory

contact for this inspection is Stephanie Rodgers of your organization. If there are any questions

about the inspection or the material requested, please contact the lead inspector at 817-200-

1114 or via e-mail at nnaerika.okonkwo@nrc.gov

Paperwork Reduction Act Statement

This letter contains mandatory information collections that are subject to the Paperwork

Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)

approved these information collections under approval number 3150-0011. The burden to the

public for these information collections is estimated to average 40 hour4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />(s) per response. Send

comments regarding this information collection to the FOIA, Library and Information Collection

Branch, Office of the Chief Information Officer, Mail Stop: T6-A10M, U.S. Nuclear Regulatory

Commission, Washington, DC 20555-0001, or by email to Infocollects.Resource@nrc.gov, and

to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0011)

OMB, Washington, DC 20503.

Public Protection Notification

The NRC may not conduct or sponsor, and a person is not required to respond to, a request for

information or an information collection requirement unless the requesting document displays a

currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,

of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available

electronically for public inspection in the NRCs Public Document Room or from the Publicly

Available Records (PARS) component of the NRC's Agencywide Documents Access and

Management System (ADAMS). ADAMS is accessible from the NRC Website at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

Nnaerika Okonkwo, Reactor Inspector

Engineering Branch 2

Division of Operating Reactor Safety

Signed by Okonkwo, Nnaerika

on 09/15/22

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

Docket Nos. 05000498, 05000499,

License Nos. NPF-76; NPF-80

Enclosure:

South Texas Project Electric Generating Station, Units 1 And 2.

Cyber Security Inspection Document Request

cc w/encl: Distribution via LISTSERV

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1, AND 2 -

INFORMATION REQUEST FOR THE CYBERSECURITY BASELINE INSPECTION,

NOTIFICATION TO PERFORM INSPECTION 05000498/2022401 AND 05000499/2022401

DATED SEPTEMBER 13, 2022

DISTRIBUTION:

SMorris, ORA

JMonninger, ORA

RLantz, DORS

MHay, DORS

DCylkowski, RC

LMcKown, RIV/OEDO

VDricks, ORA

LWilkins, OCA

DGalvin, NRR

AMoreno, RIV/OCA

RAlexander, RSLO

PVossmar, DORS

RDeese, DORS

SLichvar, DORS

GKolcum, DORS

CStott, DORS

LReyna, DORS

R4-DORS-IPAT

R4Enforcement

ADAMS ACCESSION NUMBER: ML22255A154

SUNSI Review:

ADAMS:

Non-Publicly Available and Sensitive

By: NPO

Yes No

Publicly Available and non-sensitive

OFFICE

DORS/EB2

NAME

N.Okonkwo

SIGNATURE

NPO1

DATE

09/13/22

OFFICAL RECORD COPY

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

Inspection Report: 05000498/2022401; 05000499/2022401

Inspection Date(s):

Week of November 28

Inspection Procedure:

IP 71130.10, CYBERSECURITY

Reference:

ML21330A088, Guidance Document for Development of the

Request for Information (RFI) and Notification Letter for IP

71130.10 Cyber Security Inspection, Revision 2

NRC Inspectors:

Nnaerika Okonkwo, Lead

Larry Jones

817-200-1114

404-997-4837

Nnaerika.okonkwo@nrc.gov

larry.jones@nrc.gov

NRC Contractors:

Steven Leigh

Tim Marshall

301-332-8281

703-964-6891

Steven.leigh@nrc.gov

timothy.marshall@nrc.gov

I.

Information Requested for In-Office Preparation

This initial request for information (i.e., Table RFI #1) concentrates on providing the inspection

team with information necessary to select appropriate components and cyber security program

elements to develop a site-specific inspection plan. The first RFI is used to identify the critical

digital assets or systems to be chosen as the sample set required to be inspected by the cyber

security IP. The first RFIs requested information is specified below in Table RFI #1. Please

provide the information requested in Table RFI #1 to the regional office by October 7, 2022, or

sooner, to facilitate the selection of the specific items for review.

The inspection team will examine the documentation from the first RFI and select specific

systems and equipment to provide a more focused follow-up request to develop the second RFI.

The inspection team will submit the specific systems and equipment list to your staff by October

17, 2022, which will be utilized to evaluate the equipment, defensive architecture, and the areas

of the licensees cyber security program for review.

Please provide the information requested by the second RFI to the regional office by November

7, 2022. All requests for information shall follow the guidance document referenced above. For

information requests that have more than ten (10) documents, please provide a compressed

(i.e., Zip) file of the documents.

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

Enclosure

2

The required Table RFI #1 information shall be provided on digital media (CD/DVD)) or an online

document repository to the lead inspector by October 7, 2022. Please provide four copies of each

media submitted (i.e., one for each inspector/contactor). The preferred file format for all lists is a

searchable Excel spreadsheet file. The media (CDs/DVDs) should be indexed and hyperlinked to

facilitate ease of use. If you have any questions regarding this information, please call the

inspection team leader as soon as possible.

Table RFI #1

Section 3,

Paragraph Number/Title:

IP Ref. Items

1

A list of all Identified Critical Systems and Critical Digital Assets, -

highlight/note any additions, deletions, reclassifications due to new guidance

from white papers, changes to NEI 10-04, 13-10, etc. since the last cyber

security inspection.

Overall

2

A list of EP and Security onsite and offsite digital communication systems

Overall

3

Network Topology Diagrams to include information and data flow for critical

systems in levels 2, 3 and 4 (If available)

Overall

4

Ongoing Monitoring and Assessment program documentation

03.01(a)

5

The most recent Effectiveness Analysis of the Cyber Security Program

03.01(b)

6

Vulnerability screening/assessment and scan program documentation

03.01(c)

7

Cyber Security Incident response documentation, including incident

detection, response, and recovery documentation as well as contingency

plan development, implementation and including any program documentation

that requires testing of security boundary device functionality

03.02(a) and

03.04(b)

8

Device Access and Key Control documentation

03.02(d)

9

Password/Authenticator documentation

03.02(d)

10

User Account/Credential documentation

03.02(d)

11

Portable Media and Mobile Device control documentation, including kiosk

security control assessment/documentation

03.02(e)

12

Design change/modification program documentation and a list of all cyber-

related design changes completed since the last cyber security inspection,

including either a summary describing the design change or the 50.59

documentation for the change.

03.03(a)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

Enclosure

3

13

Supply Chain Management documentation including any security impact

analysis for new acquisitions

03.03(a), (b)

and (c)

14

Configuration Management documentation including any security impact

analysis performed due to configuration changes since the last inspection

03.03(a) and

(b)

15

Cyber Security Plan and any 50.54(p) analysis to support changes to the

plan since the last inspection

03.04(a)

16

Cyber Security Metrics tracked (if applicable)

03.06 (b)

17

Provide documentation describing any cyber security changes to the access

authorization program since the last cyber security inspection.

Overall

18

Provide a list of all procedures and policies provided to the NRC with their

descriptive name and associated number (if available)

Overall

19

Performance testing report (if applicable)

03.06 (a)

Enclosure

4

In addition to the above information please provide the following:

(1)

Electronic copy of the UFSAR and technical specifications.

(2)

Name(s) and phone numbers for the regulatory and technical contacts.

(3)

Current management and engineering organizational charts.

(4)

Implementing and program procedures in a single folder.

Based on this information, the inspection team will identify and select specific systems and

equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and submit a list of

specific systems and equipment to your staff by October 17, 2022, for the second RFI (i.e., RFI

  1. 2).

II.

Additional Information Requested to be Available Prior to Inspection.

As stated in Section I above, the inspection team will examine the returned documentation

requested from Table RFI #1 and submit the list of specific systems and equipment to your staff

by October 17, 2022, for the second RFI (i.e., RFI #2). The second RFI will request additional

information required to evaluate the CSs/CDAs, defensive architecture, and the areas of the

licensees CSP selected for the cybersecurity inspection. The additional information requested

for the specific systems and equipment is identified in Table RFI #2. All requested information

shall follow the guidance document referenced above.

The Table RFI #2 information shall be provided on digital media (CD/DVD) or an online

document repository to the lead inspector by November 7, 2022. Please provide four copies of

each media (CD/DVD) submitted (i.e., one for each inspector/contactor). The preferred file

format for all lists is a searchable Excel spreadsheet file. The digital media (CDs/DVDs) should

be indexed and hyperlinked to facilitate ease of use. If you have any questions regarding this

information, please call the inspection team leader as soon as possible.

Table RFI #2

Section 3,

Paragraph Number/Title:

IP Ref.

Items

For the system(s) chosen for inspection provide:

1

Ongoing Monitoring and Assessment activity performed on the system(s)

03.01(a)

2

All Security Control Assessments for the selected system(s)

03.01(a)

3

All vulnerability screenings/assessments associated with, or scans

performed on the selected system(s) since the last cyber security inspection

03.01(c)

Enclosure

5

Table RFI #2

Section 3,

Paragraph Number/Title:

IP Ref.

Items

4

Documentation (including configuration files and rules sets) for Network-

based Intrusion Detection/Protection Systems (NIDS/NIPS), Host-based

Intrusion Detection Systems (HIDS), and Security Information and Event

Management (SIEM) systems for system(s) chosen for inspection

03.02(b)

5

Documentation (including configuration files and rule sets) for intra-security

level firewalls and boundary devices used to protect the selected system(s)

03.02(c)

6

Copies of all periodic reviews of the access authorization list for the selected

systems since the last inspection

03.02(d)

7

Baseline configuration data sheets for the selected CDAs

03.03(a)

8

Documentation on any changes, including Security Impact Analyses,

performed on the selected system(s) since the last inspection

03.03(b)

9

Copies of the purchase order documentation for any new equipment

purchased for the selected systems since the last inspection

03.03(c)

10

Copies of any reports/assessment for cyber security drills performed since

the last inspection.

03.02(a)

03.04(b)

11

Copy of the individual recovery plan(s) for the selected system(s) including

documentation of the results the last time the backups were executed.

03.02(a)

03.04(b)

12

Corrective actions taken as a result of cyber security incidents/issues to

include previous NRC violations and Licensee Identified Violations since the

last cyber security inspection

03.04(d)

III.

Information Requested to be Available on First Day of Inspection

For the specific systems and equipment identified in Section II above, provide the following RFI

(i.e., Table Onsite Week) on digital media (CD/DVD) or an online document repository by

November 28, 2022, the first day of the inspection. All requested information shall follow the

guidance document referenced above.

Please provide four copies of each passive digital media (CD/DVD) submitted (i.e., one for each

inspector/contactor). The preferred file format for all lists is a searchable Excel spreadsheet file.

The digital media (CDs/DVDs) should be indexed and hyperlinked to facilitate ease of use. If

you have any questions regarding this information, please call the inspection team leader as

soon as possible.

Table Onsite Week

Section 3,

Paragraph Number/Title:

Items

1

Any cyber security event reports submitted in accordance with

10 CFR 73.77 since the last cyber security inspection

03.04(a)

Enclosure

6

Table Onsite Week

Section 3,

Paragraph Number/Title:

Items

2

Updated Copies of corrective actions taken as a result of

cyber security incidents/issues, to include previous NRC

violations and Licensee Identified Violations since the last

cyber security inspection, as well as vulnerability-related

corrective actions

03.04(d)

In addition to the above information please provide the following:

(1) Copies of the following documents do not need to be solely available to the inspection

team as long as the inspectors have easy and unrestrained access to them:

a.

Updated Final Safety Analysis Report, if not previously provided.

b.

Original FSAR Volumes.

c.

Original SER and Supplements.

d.

FSAR Question and Answers.

e.

Quality Assurance Plan.

f.

Technical Specifications, if not previously provided.

g.

Latest IPE/PRA Report; and

(2) Vendor Manuals, Assessments and Corrective Actions:

a.

The most recent Cyber Security Quality Assurance (QA) audit and/or

self-assessment; and

b.

Corrective action documents (e.g., condition reports, including status of corrective

actions) generate as a result of the most recent Cyber Security Quality Assurance

(QA) audit and/or self-assessment.

IV.

Information Requested To Be Provided Throughout the Inspection

(1) Copies of any corrective action documents generated as a result of the inspection

teams questions or queries during the inspection.

(2) Copies of the list of questions submitted by the inspection team members and the

status/resolution of the information requested (provided daily during the inspection to

each inspection team member).

If you have any questions regarding the information requested, please contact the inspection

team leader.