MONTHYEARNOC-AE-19003684, Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Essential Cooling Water (Ecw) System Class 3 Buried Piping in Accordance with 10 CFR 50.55a(z)(1)2019-09-26026 September 2019 Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Essential Cooling Water (Ecw) System Class 3 Buried Piping in Accordance with 10 CFR 50.55a(z)(1) Project stage: Request NOC-AE-19003677, License Amendment Request to Revise Technical Specifications to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec.2019-09-26026 September 2019 License Amendment Request to Revise Technical Specifications to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec. Project stage: Request ML19309F1412019-11-0404 November 2019 Supplemental Information Request - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping (EPID L 2019-LLR-0096) (Draft) Project stage: Draft Other ML19312A0962019-11-13013 November 2019 Supplemental Information Needed for Acceptance of Requested Licensing Action Proposed Alternative to ASME Requirements for Repair of Essential Cooling Water Class 3 Buried Piping Project stage: Acceptance Review NOC-AE-19003696, Supplemental Information for Proposed Alternative to ASME Code Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) EPID: L 2019-LLR-0096)2019-11-26026 November 2019 Supplemental Information for Proposed Alternative to ASME Code Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) EPID: L 2019-LLR-0096) Project stage: Supplement ML19344A0092019-12-0909 December 2019 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping Project stage: Acceptance Review ML20036F5862020-02-0404 February 2020 Request for Additional Information - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping (EPID L-2019-LLR-0096)Redacted Project stage: RAI NOC-AE-20003716, Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping2020-03-0909 March 2020 Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping Project stage: Request ML20069L4992020-03-0909 March 2020 Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping Project stage: Request NL-20-039, (04/29/2020) E-mail from R. Gaston to R. Guzman, Exemption Request from Requirements of 10 CFR Part 73, Appendix B, Section VI, Subsection C.3.(l)(1)2020-04-29029 April 2020 (04/29/2020) E-mail from R. Gaston to R. Guzman, Exemption Request from Requirements of 10 CFR Part 73, Appendix B, Section VI, Subsection C.3.(l)(1) Project stage: Other ML20128J8432020-05-15015 May 2020 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML20142A5202020-05-21021 May 2020 Exemption Request Due to COVID-19 Pandemic Project stage: Other NL-20-0620, SNC Requests a Temporary Exemption from the Quarterly Fire Brigade Drills and Annual Live Fire Fighting Training Requirements of the Regulation2020-05-22022 May 2020 SNC Requests a Temporary Exemption from the Quarterly Fire Brigade Drills and Annual Live Fire Fighting Training Requirements of the Regulation Project stage: Other NL-20-0640, Response to Request for Additional Information for Exemption Request2020-05-27027 May 2020 Response to Request for Additional Information for Exemption Request Project stage: Response to RAI ULNRC-06587, Supplement to Security Training Exemption Request Due to COVID-192020-06-17017 June 2020 Supplement to Security Training Exemption Request Due to COVID-19 Project stage: Supplement NOC-AE-20003749, Response to Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24)2020-07-15015 July 2020 Response to Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) Project stage: Response to RAI ML20197A2612020-07-15015 July 2020 Response to Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) Project stage: Response to RAI ML20177A6452020-07-15015 July 2020 FRN - Notice of Issuance of Multiple Exemptions Regarding Various Parts of 10 CFR Due to COVID-19 Impacts for June 2020 Project stage: Approval ML20212L5682020-07-30030 July 2020 Supplement to Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) Project stage: Supplement NOC-AE-20003755, Supplement to Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24)2020-07-30030 July 2020 Supplement to Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) Project stage: Supplement ML20232D1442020-08-26026 August 2020 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML20227A3852020-09-0303 September 2020 Nonproprietary - Proposed Alternative RR-ENG-3-24 to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping Project stage: Other 2020-05-15
[Table View] |
|
---|
Category:Request for Additional Information (RAI)
MONTHYEARML24207A1782024-07-25025 July 2024 Licensed Operator Positive Fitness-For-Duty Test ML24052A0112024-02-16016 February 2024 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications (L-2023-LLE-0046) ML24024A1162024-01-24024 January 2024 STP Unit 2 Request for Information ML23334A0062023-11-29029 November 2023 NRR E-mail Capture - South Texas Project - Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements ML23319A4442023-11-15015 November 2023 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements ML23278A1532023-10-0505 October 2023 NRR E-mail Capture - South Texas Project Request for Additional Information - Request for Indirect Transfer of Licenses and Conforming Amendments (L-2023-LLM-0004) ML23264A0972023-09-21021 September 2023 NRR E-mail Capture - South Texas Project - Request for Additional Information - License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23255A2862023-09-12012 September 2023 NRR E-mail Capture - South Texas Project Draft Request for Additional Information License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23145A1872023-05-24024 May 2023 July 2023 Emergency Preparedness Program Inspection - Request for Information ML22255A1542022-09-13013 September 2022 Operating Company Information Request for the Cyber Security Baseline Inspection 05000498/2022401 and 05000499/2022401 ML22206A0142022-07-20020 July 2022 NRR E-mail Capture - South Texas Project - Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22194A0502022-07-0707 July 2022 NRR E-mail Capture - South Texas Project - Updated Draft Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22194A0492022-06-0808 June 2022 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22123A3272022-05-0303 May 2022 STP EP Exercise Inspection July 2022 RFI ML22084A0762022-04-0404 April 2022 Notification of NRC Design Bases Assurance Inspection (Team) (05000498/2022012 and 05000499/2022012) and Request for Information ML21286A5732021-10-18018 October 2021 Notification of NRC Design Bases Assurance Inspection (Programs) (05000498/2022011 and 05000499/2022011) and Request for Information ML21166A2392021-06-16016 June 2021 Notification of Inspection (NRC Inspection Report 05000498/2021003 and 05000499/2021003) and Request for Information ML21160A1522021-06-0909 June 2021 Request for Information NRC Inspection 2021-003 Public Radiation Safety ML21133A2372021-05-0505 May 2021 Request for Additional Information: STP EP Exercise Inspection - July 2021 ML21039A8902021-02-0808 February 2021 NRR E-mail Capture - South Texas Project - Request for Additional Information - 1RE22 Inspection Summary Report for Steam Generator Tubing ML21029A3312021-01-29029 January 2021 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - 1RE22 Inspection Summary Report for Steam Generator Tubing ML20280A5452020-08-17017 August 2020 STP 2020 PIR Request for Information ML20111A0052020-04-17017 April 2020 NRR E-mail Capture - South Texas Project - Request for Additional Information - Proposed Alternative to ASME OM Code 2012 Edition - Relief Request PRR-01 ML20070N0222020-03-10010 March 2020 NRC Selection for Onsite Review ML20057G4612020-02-26026 February 2020 05000498/499 Request for Information - Occupational Radiation Safety Inspection ML20045E2172020-02-13013 February 2020 Licensed Operator Positive Fitness-For-Duty Test ML20036F5862020-02-0404 February 2020 Request for Additional Information - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping (EPID L-2019-LLR-0096)Redacted ML19165A1032019-06-14014 June 2019 NRR E-mail Capture - Draft RAI for STP TS 3.8.1.1 Sbdg SR Change ML19081A1512019-03-21021 March 2019 NRR E-mail Capture - Draft Round 2 RAI - Sbdg Voltage and Frequency LAR (L-2018-LLA-0078) ML18283B9522018-10-10010 October 2018 NRR E-mail Capture - Final RAI - South Texas Standby DG TS Change (L-2018-LLA-0078) ML18263A1432018-09-12012 September 2018 NRR E-mail Capture - Final RAI for South Texas Project RR-ENG-E-16 (L-2018-LLR-0097) ML18197A4172018-07-17017 July 2018 Notification of NRC Triennial Heat Sink Performance Inspection (05000498/2018003 and 05000499/2018003) and Request for Information ML18003B4222018-01-0303 January 2018 NRR E-mail Capture - Final Request for Additional Information Amendment Request to Modify the Emergency Response Organization for South Texas Project ML17229B4672017-08-16016 August 2017 Notification of NRC Inspection 05000499/2017008 and Request for Information ML17132A0712017-05-15015 May 2017 Information Request the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000498/2017407; 05000499/2017407 ML17103A6272017-04-13013 April 2017 Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000498/2017007 and 05000499/2017007) and Request for Information ML16351A1502016-12-16016 December 2016 Correction Letter Closeout of Request for Information Questions That Are No Longer Applicable Associated with the Resolution of Generic Safety Issue 191 (CAC Nos. MF2400 - MF2409) ML16302A4532016-12-12012 December 2016 Closeout of Request for Additional Information Questions That Are No Longer Applicable, Resolution of Generic Safety Issue (GSI) 191 (CAC Nos. MF2400-MF2409) ML16343A0422016-12-0808 December 2016 Request for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application (CAC NOS. ME4936, ME4937) ML16340A1022016-12-0505 December 2016 Requests for Additional Information for the Review of the South Texas Project License Renewal Application (CAC Nos. ME4936 and ME4937) ML16246A0952016-09-15015 September 2016 Correction to 8/26/16 Request for Additional Information Enclosure, License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies ML16214A2912016-08-26026 August 2016 Summary of June 28-30, 2016, Regulatory Audit at Westinghouse in Rockville, MD, License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies ML16187A0522016-07-0707 July 2016 Request for Additional Information Regarding License Renewal Application ML16141B0812016-05-31031 May 2016 Audit Summary, Risk Audit on April 12-13, 2016, at Alumni Center at the University of Texas, Austin, Tx; Pilot Generic Safety Issue 191 Submittal and Exemption Request, and Draft Request for Additional Information ML16125A2902016-05-26026 May 2016 Request for Additional Information, Risk Review, Exemption and License Amendment Request for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 (CAC Nos. MF2400-MF2409) ML16127A4522016-05-12012 May 2016 Supplemental Information Needed for Acceptance of Requested Licensing Action, Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies ML16104A3522016-04-22022 April 2016 Requests for Additional Information Set 35 for the Review of the South Texas Project License Renewal Application (Tac Nos. ME4936, ME4937) ML16082A5072016-04-11011 April 2016 Request for Additional Information, Phased Response Requested, Exemption and License Amendment Request for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 (CAC Nos. MF2400-MF2409) ML16082A4842016-03-22022 March 2016 NRR E-mail Capture - South Texas Project Units 1 & 2, Draft Request for Additional Information for Risk Review for GSI-191 ML16081A0042016-03-18018 March 2016 NRR E-mail Capture - South Texas Project Units 1 & 2, Draft Request for Additional Information for Thermal-hydraulic Review for GSI-191 2024-07-25
[Table view] |
Text
From: Galvin, Dennis To: Drew Richards (amrichards@stpegs.com)
Subject:
RE: South Texas Project - Request for Additional Information - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping (EPID: L 2019-LLR-0096)
Date: Tuesday, February 04, 2020 5:24:00 PM Attachments: STP RR CFRP Piping Repair Final RAI L-2019-LLR-0096 2020-02-04 Redacted.pdf Mr. Richards, By letter dated September 26, 2019 (Agencywide Documents and Access Management System (ADAMS) Accession No. ML19274C393), as supplemented by letter dated November 26, 2019 (ADAMS Accession No. ML19331A202), STP Nuclear Operating Company (the licensee) requested Nuclear Regulatory Commission (NRC) approval of a proposed alternative to Section Xl, IWA-4221(b) of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code), which requires repaired/replacement piping to meet the original Construction Code requirements. The proposed alternative is to allow the use of a carbon fiber reinforced polymer (CFRP) composite system for the internal repair of the buried Essential Cooling Water (ECW) piping during the third and fourth 10-year ISI intervals at South Texas Project Electric Generation Station (STP), Units 1 and 2.
The NRC staff has determined that additional information is needed to complete its review.
The requests for additional information (RAIs) were transmitted to the licensee in draft form on January 27, 2020. A RAI clarification call was held on February 4, 2020. During the call, the licensee agreed to provide responses to the RAls by March 5, 2020. The NRC staff agreed with this date.
The NRC staff has determined that its documented RAls contain proprietary information pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390, "Public inspections, exemptions, requests for withholding." Accordingly, the NRC staff has prepared a redacted, nonproprietary version. However, the NRC will delay placing the nonproprietary RAls in the public document room for a period of 10-working days from the date of this email to provide the licensee the opportunity to comment on any proprietary aspects. If you believe that any information in the redacted RAIs is proprietary, please identify such information line-by-line and define the basis pursuant to the criteria of 10 CFR 2.390. After 10-working days, the nonproprietary RAls will be made publicly available.
If you have any questions, please contact me at (301) 415-6256 or Dennis.Galvin@nrc.gov.
Respectfully, Dennis Galvin Project Manager U.S Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Operating Reactor Licensing Licensing Project Branch 4 301-415-6256 Docket No. 50-498, 50-499
OFFICIAL USE ONLY PROPRIETARY INFORMATION REQUEST FOR ADDITIONAL INFORMATION PROPOSED ALTERNATIVE TO ASME SECTION XI REQUIREMENTS FOR REPAIR/REPLACEMENT OF ESSENTIAL COOLING WATER CLASS 3 BURIED PIPING IN ACCORDANCE WITH 10 CFR 50.55a(z)(1)
STP NUCLEAR OPERATING COMPANY SOUTH TEXAS PROJECT UNITS 1 AND 2 DOCKET NOS. 50-498 AND 50-499 By letter dated September 26, 2019 (Agencywide Documents and Access Management System (ADAMS) Accession No. ML19274C393), as supplemented by letter dated November 26, 2019 (ADAMS Accession No. ML19331A202), STP Nuclear Operating Company (the licensee) requested Nuclear Regulatory Commission (NRC) approval of a proposed alternative to Section Xl, IWA-4221(b) of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code), which requires repaired/replacement piping to meet the original Construction Code requirements. The proposed alternative is to allow the use of a carbon fiber reinforced polymer (CFRP) composite system for the internal repair of the buried Essential Cooling Water (ECW) piping during the third and fourth 10-year ISI intervals at South Texas Project Electric Generation Station (STP), Units 1 and 2.
To complete its review, the NRC staff requests the following additional information. The proprietary information in this document is marked with double brackets and bold font such as
((Example)).
NPHP RAI 1 , Section 4, page 5 of 21 of the request states that the ECW piping is fabricated of aluminum-bronze material. Discuss what measures have been conducted to demonstrate that CFRP can be applied to the inside surface of aluminum-bronze pipes with adequate adhesion and strength for the intended application (e.g. mockup tests).
NPHP RAI 2
((
OFFICIAL USE ONLY PROPRIETARY INFORMATION
OFFICIAL USE ONLY PROPRIETARY INFORMATION
]
NPHP RAI 3 Discuss whether a pressure test will be performed in accordance with the ASME Code,Section XI, IWA-5000 and IWD-5000 after the CFRP repair is installed and prior to system startup.
NPHP RAI 4
((
))
NPHP RAI 5
((
))
NPHP RAI 6
[
))
OFFICIAL USE ONLY PROPRIETARY INFORMATION
OFFICIAL USE ONLY PROPRIETARY INFORMATION NPHP RAI 7
((
))
EMIB RAI 1
((
]
EMIB RAI 2
((
))
EMIB RAI 3
((
OFFICIAL USE ONLY PROPRIETARY INFORMATION
OFFICIAL USE ONLY PROPRIETARY INFORMATION
]
EMIB RAI 4 Section 5B.6 of Attachment 5B to Enclosure 5 of the request discusses CFRP composite system termination detail at straight ends. Repair terminations at host pipe substrate at the ends of repair with a good bond are critical to maintain structural integrity so that the CFRP composite system can transfer loads to the host pipe. Provide information or a sketch to address the following related to the intact or non-repaired side of terminations:
(a) Address whether the intact piping on the non-repaired side of terminations is buried, or whether all non-repaired side is exposed. If buried, discuss whether credit is taken for attenuation along the buried length.
(b) The distance from termination end to the end of buried portion of pipe or to the beginning of aboveground piping in the buildings.
(c) The distance from termination end to the piping supports or anchors in the vicinity for the aboveground piping.
(d) Repair terminations interface with the repaired and the non-repaired sides of the piping.
It appears that the loads from the repaired side are considered. Provide a discussion on structural integrity of the terminations from any dead weight, thermal, seismic, and any other applicable loadings from the non-repaired side.
EMIB RAI 5 Table 1 in Attachment B of Enclosure 4 on page 11 of 42 of the request lists Mechanical Property Tests Required for V-Wrap CFRP Composite System. The table lists ASTM Standard D3526, which does not address testing of Shear Bond Strength Between CFRP and aluminum-bronze. Please provide the applicable ASTM Standard for testing this property.
EMIB RAI 6
((
OFFICIAL USE ONLY PROPRIETARY INFORMATION
OFFICIAL USE ONLY PROPRIETARY INFORMATION
))
EMIB RAI 7
((
]
EMIB RAI 8
((
]
EMIB RAI 9
((
OFFICIAL USE ONLY PROPRIETARY INFORMATION
OFFICIAL USE ONLY PROPRIETARY INFORMATION
))
EMIB RAI 10
((
]
EMIB RAI 11
((
))
OFFICIAL USE ONLY PROPRIETARY INFORMATION