Letter Sequence RAI |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: ML110620203, ML11140A163, ML11224A265, ML11230A003, ML11318A121, ML11318A122, ML11318A123, ML11318A124, ML11318A125, ML11318A126, ML11318A127, ML11318A128, ML11318A129, ML11318A130, ML11318A131, ML11318A132, ML11318A133, ML11318A135, ML11318A136, ML11318A138, ML11318A139, ML11318A140, ML11318A141, ML11318A142, ML11318A143, ML11318A144, ML11318A145, ML11318A146, ML11318A147, ML11318A148, ML11318A149, ML11318A150, ML11318A151, ML11318A152, ML11318A153, ML11318A154, ML11318A155, ML11318A156, ML11318A157, ML11318A158, ML11318A159, ML11318A160, ML11318A161, ML11318A162, ML11318A163, ML11318A164, ML11318A165, ML11318A166, ML11318A167, ML11318A168... further results
|
MONTHYEARML1106202032011-03-17017 March 2011 License Renewal Application Online Reference Portal Project stage: Other ML1108907642011-04-14014 April 2011 Request for Additional Information for the Review of the South Texas Project, License Renewal Application-Electrical Branch Scoping Project stage: RAI ML1108205792011-04-14014 April 2011 Request for Additional Information for the Review of the South Texas Project, License Renewal Application -Section 2.4 Structural (TAC Nos. ME4936, ME4937) Project stage: RAI ML1108309782011-04-14014 April 2011 Request for Additional Information for the Review of the South Texas Project, License Renewal Application, Fire Protection and Component Integrity (TAC Nos. ME4536 ME4637 Project stage: RAI NOC-AE-11002670, Response to Request for Additional Information for License Renewal Application2011-05-0505 May 2011 Response to Request for Additional Information for License Renewal Application Project stage: Response to RAI NOC-AE-11002672, Response to Request for Additional Information for Licence Renewal Application2011-05-12012 May 2011 Response to Request for Additional Information for Licence Renewal Application Project stage: Response to RAI ML11137A0922011-05-24024 May 2011 Request for Additional Information for the Review of the South Texas Project, Units 1 and 2, License Renewal Application Future Consideration of Operating Experience Project stage: RAI ML11140A1632011-06-0606 June 2011 Plan for the Aging Management Program Regulatory Audit Regarding the South Texas Project, Units 1 and 2 License Renewal Application Review (TAC Nos. ME4936 and ME4937) Project stage: Other NOC-AE-11002681, Amendment 2 to the License Renewal Application2011-06-16016 June 2011 Amendment 2 to the License Renewal Application Project stage: Other NOC-AE-11002683, Response to Request for Additional Information for License Renewal Application (TAC Nos. ME4936 and ME4937)2011-06-23023 June 2011 Response to Request for Additional Information for License Renewal Application (TAC Nos. ME4936 and ME4937) Project stage: Response to RAI ML11154A0132011-07-0606 July 2011 Summary of Telephone Conference Call Held on May 23, 2011, Between the NRC and STPNOC, Concerning Requests for Additional Information Pertaining to the South Texas Project, LRA-Future Consideration of Operating Experience Project stage: RAI ML11166A2392011-07-12012 July 2011 Letter Request for Additional Information for South Texas Project Electric Generating Station, Units 1 and 2 License Renewal Application - Scoping and Screening Balance of Plant (TAC Nos. ME4936 and ME4937) Project stage: RAI ML11201A0552011-07-28028 July 2011 Requests for Additional Information for the Review of the South Texas Project, License Renewal Application - Scoping and Screening Audit (TAC Nos. ME4936 and ME4937) Project stage: RAI NOC-AE-11002702, Response to Request for Additional Information for the Review of the South Texas Project License Renewal Application2011-08-0909 August 2011 Response to Request for Additional Information for the Review of the South Texas Project License Renewal Application Project stage: Response to RAI ML11214A0882011-08-15015 August 2011 Request for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application - Aging Management Programs Audit, Plant Systems (TAC ME4936 and ME4937) Project stage: RAI ML11214A0052011-08-15015 August 2011 Requests for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application - Aging Management Programs Audit, Structures/Electrical (TAC ME4936 and ME4937) Project stage: RAI ML11214A0272011-08-15015 August 2011 Requests for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application - Aging Management Programs Audit, Reactor Systems (TAC Nos. ME4936 and ME4937) Project stage: RAI NOC-AE-11002716, Response to Request for Additional Information for the South Texas Project License Renewal Application (TAC ME4936 and ME4937)2011-08-18018 August 2011 Response to Request for Additional Information for the South Texas Project License Renewal Application (TAC ME4936 and ME4937) Project stage: Response to RAI ML1123000162011-08-18018 August 2011 License Renewal - Errata in AMP RAI Package Project stage: RAI NOC-AE-11002714, Response to Request for Additional Information for the South Texas Project License Renewal Application (TAC ME4936 and ME4937)2011-08-23023 August 2011 Response to Request for Additional Information for the South Texas Project License Renewal Application (TAC ME4936 and ME4937) Project stage: Response to RAI ML11230A0032011-09-0606 September 2011 Scoping and Screening Audit Report Regarding the South Texas Project, Units 1 and 2 (TAC Nos. ME4936 and ME4937) Project stage: Other NOC-AE-11002730, Response to Request for Additional Information for License Renewal Application (TAC Nos. ME4936 and ME4937)2011-09-15015 September 2011 Response to Request for Additional Information for License Renewal Application (TAC Nos. ME4936 and ME4937) Project stage: Response to RAI NOC-AE-11002731, Response to Requests for Additional Information for License Renewal Application (TAC Nos. ME4936 and ME4937)2011-09-15015 September 2011 Response to Requests for Additional Information for License Renewal Application (TAC Nos. ME4936 and ME4937) Project stage: Response to RAI ML1124402012011-09-21021 September 2011 Request for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application - Aging Management Review, Set 2 (TAC Nos. ME4936, ME4937) Project stage: RAI ML11250A0432011-09-22022 September 2011 Requests for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application - Aging Management Review, Set 1 (TAC Nos. ME4936 and ME4937) Project stage: RAI ML11224A2652011-09-22022 September 2011 Aging Management Programs Audit Report Regarding the South Texas Project, Units 1 and 2, Station License Renewal Application (TAC Nos. ME4936 and ME4937) Project stage: Other ML11258A1612011-09-22022 September 2011 Request for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application - Aging Management Review, Set 3 (TAC Nos. ME4936 and ME4937) Project stage: RAI ML11272A1652011-10-0404 October 2011 Summary of Telephone Conference Call Held on September 28, 2011, Between the NRC and STP Nuclear Operating Company, Concerning Request for Additional Information Pertaining to the South Texas Project, LRA (TAC Nos. ME4936 and ME4937) Project stage: RAI NOC-AE-11002732, Response to Requests for Additional Information for the License Renewal Application2011-10-10010 October 2011 Response to Requests for Additional Information for the License Renewal Application Project stage: Response to RAI ML11273A0172011-10-11011 October 2011 Requests for Additional Information for the Review of the South Texas Project, Units 1 and 2, License Renewal Application - Aging Management Review, Set 5 (TAC Nos. ME4936 and ME4937) Project stage: RAI ML11273A0082011-10-11011 October 2011 Requests for Additional Information for the Review of the South Texas Project, Units 1 and 2, License Renewal Application - Aging Management Review, Set 4 (TAC Nos. ME4936 and ME4937) Project stage: RAI NOC-AE-11002737, Supplement to License Renewal Application (TAC Nos. ME4936 and ME4937)2011-10-18018 October 2011 Supplement to License Renewal Application (TAC Nos. ME4936 and ME4937) Project stage: Supplement ML11277A0472011-10-18018 October 2011 Requests for Additional Information for the Review of the South Texas Project, Units 1 and 2, License Renewal Application - Aging Management Program, Set 6 Project stage: RAI ML11305A0762011-10-25025 October 2011 Response to Requests for Additional Information for License Renewal Application (TAC ME4936 and ME4937) Project stage: Response to RAI NOC-AE-11002756, Contact Information Change, License Renewal Application (TAC ME4936 and ME4937)2011-10-26026 October 2011 Contact Information Change, License Renewal Application (TAC ME4936 and ME4937) Project stage: Other ML11318A1792011-11-0303 November 2011 Drawing No. LR-STP-WL-7R309F90021#2, Rev. 1, Piping and Instrumentation Diagram Liquid Waste Processing System Project stage: Other ML11318A1802011-11-0303 November 2011 Drawing No. LR-STP-WS-6R329F05048#1, Rev. 1, Piping and Instrumentation Diagram Solid Waste Processing System Project stage: Other ML11318A1762011-11-0303 November 2011 Drawing No. LR-STP-WL-7R309F05024#2, Rev. 1, Piping and Instrumentation Diagram Liquid Waste Processing System Project stage: Other ML11318A1652011-11-0303 November 2011 Drawing No. LR-STP-PS9Z329Z00047#1, Rev. 1, Piping and Instrumentation Diagram Primary Sampling System. Project stage: Other ML11318A1642011-11-0303 November 2011 Drawing No. LR-STP-PS-5Z329Z00045#2, Rev. 1, Piping & Instrumentation Diagram Primary Sampling System. Project stage: Other ML11318A1782011-11-0303 November 2011 Drawing No. LR-STP-WL-7R309F90021#1, Rev. 1, Piping and Instrumentation Diagram Liquid Waste Processing System Project stage: Other ML11318A1682011-11-0303 November 2011 Drawing No. LR-STP-RC-5R149F05004#2, Rev. 1, Piping and Instrumentation Diagram Acs Pressurizer Relief Tank. Project stage: Other ML11318A1722011-11-0303 November 2011 Drawing No. LR-STP-WL-5R309F05022#2, Rev. 1, Piping and Instrumentation Diagram Liquid Waste Processing System. Project stage: Other ML11318A1702011-11-0303 November 2011 Drawing No. LR-STP-RM-5R279F05033#2, Rev. 1, Piping & Instrumentation Reactor Makeup Water System. Project stage: Other ML11318A1602011-11-0303 November 2011 Drawing No. LR-STP-IA-8Q119F05050#2, Rev. 1, Piping & Instrumentation Diagram Mechanical Aux. Building Instrument Air. Project stage: Other NOC-AE-11002749, Drawing No. LR-STP-SB-7S209F200032, Rev. 0, Piping and Instrumentation Diagram Steam Generator Blowdown System2011-11-0303 November 2011 Drawing No. LR-STP-SB-7S209F20003#2, Rev. 0, Piping and Instrumentation Diagram Steam Generator Blowdown System Project stage: Other ML11318A1742011-11-0303 November 2011 Drawing No. LR-STP-WL-5R309F05027#2, Rev. 1, Piping & Instrumentation Diagram Auxiliary Steam and Condensate Return System (Lwps) Project stage: Other ML11318A1462011-11-0303 November 2011 Drawing LR-STP-ED-5Q069F05030 #2, Rev. 17, Piping & Instrumentation Diagram Radioactive Vent & Drain System Sump Pumps. Project stage: Other ML11318A1552011-11-0303 November 2011 Drawing No. LR-STP-FP-7Q272F00046, Rev. 1, Piping and Instrumentation Diagram Fire Protection Loop. Project stage: Other ML11318A1482011-11-0303 November 2011 Drawing No. LR-STP-ED-5Q069F90011#2, Revision 1, Piping & Instrumentation Diagram Radioactive Vent and Drain System Fuel Handling Building Gravity Drains. Project stage: Other 2011-06-16
[Table View] |
Summary of Telephone Conference Call Held on August 6, 2015, Between the U.S. Nuclear Regulatory Commission and STP Nuclear Operating Company, Concerning Request for Additional Information, Set 32, Pertaining to the South Texas Project, LicML15251A249 |
Person / Time |
---|
Site: |
South Texas |
---|
Issue date: |
10/05/2015 |
---|
From: |
Daily J License Renewal Projects Branch 1 |
---|
To: |
South Texas |
---|
Daily J, NRR/DLR,415-3873 |
References |
---|
DLR-15-0430, TAC ME4936, TAC ME4937 |
Download: ML15251A249 (22) |
|
|
---|
Category:Note to File incl Telcon Record
MONTHYEARML24135A0282024-05-0909 May 2024 Conversation Record: Clarification Call with South Texas Project Nuclear Operating Company on CBS Exemption Request ML15251A2492015-10-0505 October 2015 Summary of Telephone Conference Call Held on August 6, 2015, Between the U.S. Nuclear Regulatory Commission and STP Nuclear Operating Company, Concerning Request for Additional Information, Set 32, Pertaining to the South Texas Project, Lic ML12340A1352012-11-27027 November 2012 Meeting Notice by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution South Texas Project, Units 1 and 2 ML1129701092011-11-0101 November 2011 Notice of Meeting Via Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance, Resolution Approach for South Texas, Units 1 & 2 ML11222A0022011-08-16016 August 2011 Summary of Telephone Conference Call Held on August 9, 2011 Between the U.S. NRC and STP Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the South Texas Project, License Renewal Application ML0318204582003-06-23023 June 2003 Draft Information Input Faxed on June 23, 2003, (50-498 and 50-499) STP Units 1 and 2 - MB9098 and MB0999 2024-05-09
[Table view] Category:Verbal Comm
MONTHYEARML24135A0282024-05-0909 May 2024 Conversation Record: Clarification Call with South Texas Project Nuclear Operating Company on CBS Exemption Request ML15251A2492015-10-0505 October 2015 Summary of Telephone Conference Call Held on August 6, 2015, Between the U.S. Nuclear Regulatory Commission and STP Nuclear Operating Company, Concerning Request for Additional Information, Set 32, Pertaining to the South Texas Project, Lic ML12340A1352012-11-27027 November 2012 Meeting Notice by Conference Call with STP Nuclear Operating Company; Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance, Resolution South Texas Project, Units 1 and 2 ML1129701092011-11-0101 November 2011 Notice of Meeting Via Conference Call with STP Nuclear Operating Company to Discuss Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance, Resolution Approach for South Texas, Units 1 & 2 ML11222A0022011-08-16016 August 2011 Summary of Telephone Conference Call Held on August 9, 2011 Between the U.S. NRC and STP Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the South Texas Project, License Renewal Application ML0318204582003-06-23023 June 2003 Draft Information Input Faxed on June 23, 2003, (50-498 and 50-499) STP Units 1 and 2 - MB9098 and MB0999 2024-05-09
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARML24081A3972024-03-21021 March 2024 Response to Request for Additional Information for Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML22326A2962022-11-22022 November 2022 Clarification on STPNOC Response to Request for Additional Information Regarding Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material ML22244A1152022-09-0101 September 2022 Response to NRC Comments on Relief Request RR-ENG-3-25 ML22231A4692022-08-19019 August 2022 STPNOC Response to Request for Additional Information Regarding Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-220038, Supplement to Request for Exemption from Certificate of Compliance (CoC) Inspection Requirement for One Multipurpose Canister2022-04-0101 April 2022 Supplement to Request for Exemption from Certificate of Compliance (CoC) Inspection Requirement for One Multipurpose Canister ML21308A6032021-11-0404 November 2021 Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003846, Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-11-0404 November 2021 Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material ML21067A7722021-03-0808 March 2021 Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-21003784, Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing2021-03-0808 March 2021 Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing ML20154K7652020-06-0202 June 2020 Supplemental Response Regarding Bulletin 2012-01 NOC-AE-20003735, Supplemental Response Regarding Bulletin 2012-012020-06-0202 June 2020 Supplemental Response Regarding Bulletin 2012-01 NOC-AE-20003733, Response to Request for Additional Information for Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-01)2020-05-18018 May 2020 Response to Request for Additional Information for Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-01) ML20139A2162020-05-18018 May 2020 Response to Request for Additional Information for Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-01) NOC-AE-20003716, Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping2020-03-0909 March 2020 Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping ML20069L4992020-03-0909 March 2020 Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping NOC-AE-19003673, Response to Request for Additional Information for South Texas Project (STP) Units 1 & 2 License Amendment Request to Revise Technical Specification 3.8.1.1 (A.C. Sources, Operating) (L-2018-LLA-00782019-06-25025 June 2019 Response to Request for Additional Information for South Texas Project (STP) Units 1 & 2 License Amendment Request to Revise Technical Specification 3.8.1.1 (A.C. Sources, Operating) (L-2018-LLA-0078 NOC-AE-19003637, Supplement to South Texas Project (STP) Units 1 & 2 License Amendment Request to Revise Technical Specification 3.8.1.1 (A.C. Sources, Operating) (L-2018-LLA-0078)2019-05-16016 May 2019 Supplement to South Texas Project (STP) Units 1 & 2 License Amendment Request to Revise Technical Specification 3.8.1.1 (A.C. Sources, Operating) (L-2018-LLA-0078) NOC-AE-18003602, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1.1 (A.C. Sources, Operating)2018-12-0606 December 2018 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1.1 (A.C. Sources, Operating) NOC-AE-18003598, Response to Request for Additional Information Request for Relief from the Third 10-Year Interval ISI Program ASME Section Xl Code Requirements for Category B-N-2 and B-N-3 Welds (Relief Request RR-ENG-3-16)2018-09-26026 September 2018 Response to Request for Additional Information Request for Relief from the Third 10-Year Interval ISI Program ASME Section Xl Code Requirements for Category B-N-2 and B-N-3 Welds (Relief Request RR-ENG-3-16) NOC-AE-18003574, Response to Request for Additional Information Regarding Request for Exemption from 10 CFR 55.472018-05-21021 May 2018 Response to Request for Additional Information Regarding Request for Exemption from 10 CFR 55.47 NOC-AE-17003441, Revised Response Request for Additional Information for the Review of the South Texas Project License Renewal Application2017-02-0909 February 2017 Revised Response Request for Additional Information for the Review of the South Texas Project License Renewal Application NOC-AE-17003434, Response to Request for Additional Information on Revised Applicability Matrix for Questions Regarding Risk-Informed GSI-191 Licensing Application2017-01-19019 January 2017 Response to Request for Additional Information on Revised Applicability Matrix for Questions Regarding Risk-Informed GSI-191 Licensing Application NOC-AE-17003435, Response to NRC Security Reactive Inspection Report 05000498/2016407, 05000499/2016407, EA-16-2502017-01-19019 January 2017 Response to NRC Security Reactive Inspection Report 05000498/2016407, 05000499/2016407, EA-16-250 IR 05000498/20164072017-01-19019 January 2017 South Texas Project, Units 1 and 2 - Response to NRC Security Reactive Inspection Report 05000498/2016407, 05000499/2016407, EA-16-250 NOC-AE-16003428, Response to Request for Additional Information for the Review of License Renewal Application2017-01-12012 January 2017 Response to Request for Additional Information for the Review of License Renewal Application NOC-AE-16003429, Response to Requests for Additional Information for Review License Renewal Application - RAI 82.1.8-32017-01-0505 January 2017 Response to Requests for Additional Information for Review License Renewal Application - RAI 82.1.8-3 NOC-AE-16003427, Revised Applicability Matrix for Response to Request for Additional Information Questions APLA-1a and APLA-1b Regarding STP Risk-Informed GSl-191 Licensing Application2016-12-0707 December 2016 Revised Applicability Matrix for Response to Request for Additional Information Questions APLA-1a and APLA-1b Regarding STP Risk-Informed GSl-191 Licensing Application ML16321A4072016-11-0909 November 2016 Response to Request for Additional Information Regarding Sensitivity Studies for STPNOC Risk-Informed Pilot GSl-191 Application NOC-AE-16003356, Flooding Mitigating Strategies Assessment (MSA) Report Submittal2016-09-29029 September 2016 Flooding Mitigating Strategies Assessment (MSA) Report Submittal NOC-AE-16003404, Response to Request for Additional Information for the Review of License Renewal Severe Accident Mitigation Alternatives2016-09-27027 September 2016 Response to Request for Additional Information for the Review of License Renewal Severe Accident Mitigation Alternatives NOC-AE-16003412, Revised Response to Request for Additional Information APLA-4-4 STP Risk-Informed GSI-191 Licensing Application2016-09-12012 September 2016 Revised Response to Request for Additional Information APLA-4-4 STP Risk-Informed GSI-191 Licensing Application NOC-AE-16003394, Additional Information for the Review of the South Texas Project, Units 1 and 2, License Renewal Application - Aluminum Bronze AMP (TAC Nos. ME4936 and ME4937)2016-07-28028 July 2016 Additional Information for the Review of the South Texas Project, Units 1 and 2, License Renewal Application - Aluminum Bronze AMP (TAC Nos. ME4936 and ME4937) ML16230A2322016-07-21021 July 2016 Responses to Apla Round 4 Requests for Additional Information Regarding STP Risk-Informed GSl-191 Licensing Application NOC-AE-16003395, Third Set of Responses to Requests for Additional Information STP Risk-Informed GSI-191 Licensing Application2016-07-21021 July 2016 Third Set of Responses to Requests for Additional Information STP Risk-Informed GSI-191 Licensing Application NOC-AE-16003368, Third Sets of Responses to April 11, 2016 Requests for Additional Information Regarding STP Risk-Informed GSI-191 Licensing Application2016-07-18018 July 2016 Third Sets of Responses to April 11, 2016 Requests for Additional Information Regarding STP Risk-Informed GSI-191 Licensing Application NOC-AE-16003328, Second Supplement to Response to RAI for Information Pursuant to 10 CFR 50.54(f) Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident: Phase 2 Staffing Assessment2016-06-30030 June 2016 Second Supplement to Response to RAI for Information Pursuant to 10 CFR 50.54(f) Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident: Phase 2 Staffing Assessment NOC-AE-16003367, Second Set of Responses to April 11, 2016 Requests for Additional Information Regarding Risk-Informed GSI-191 Licensing Application2016-06-16016 June 2016 Second Set of Responses to April 11, 2016 Requests for Additional Information Regarding Risk-Informed GSI-191 Licensing Application NOC-AE-16003380, Request for Additional Information Set 35 for the Review of the South Texas Project, Units 1 and 2, License Renewal Application (TAC Nos. ME4936 and ME4937)2016-05-19019 May 2016 Request for Additional Information Set 35 for the Review of the South Texas Project, Units 1 and 2, License Renewal Application (TAC Nos. ME4936 and ME4937) NOC-AE-16003366, First Set of Responses to April 11, 2016 Requests for Additional Information Regarding STP Risk-Informed GSl-191 Licensing Application2016-05-11011 May 2016 First Set of Responses to April 11, 2016 Requests for Additional Information Regarding STP Risk-Informed GSl-191 Licensing Application NOC-AE-16003357, Revision to Proposed Exemption to 10CFR50.46 Described in Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Address Generic Safety Issue (GSl)-191 and Respond To..2016-04-13013 April 2016 Revision to Proposed Exemption to 10CFR50.46 Described in Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Address Generic Safety Issue (GSl)-191 and Respond To.. NOC-AE-16003347, Response to Request for Additional Information Regarding the License Amendment Request for Extension of Containment Leakage Rate Testing Program2016-03-17017 March 2016 Response to Request for Additional Information Regarding the License Amendment Request for Extension of Containment Leakage Rate Testing Program NOC-AE-16003348, Response to Request for Additional Information for License Renewal Application 2014 Annual Update (Tac. Nos. ME4936 and ME4937)2016-03-10010 March 2016 Response to Request for Additional Information for License Renewal Application 2014 Annual Update (Tac. Nos. ME4936 and ME4937) NOC-AE-15003320, Response to Request for Additional Information Set 34 for the Review of the License Renewal Application2015-12-17017 December 2015 Response to Request for Additional Information Set 34 for the Review of the License Renewal Application NOC-AE-15003318, Response to Request for Additional Information and Supplement to Emergency License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Cycle 202015-12-0909 December 2015 Response to Request for Additional Information and Supplement to Emergency License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Cycle 20 NOC-AE-15003303, Response to Request for Additional Information for the Review of the License Renewal Application - Set 322015-11-12012 November 2015 Response to Request for Additional Information for the Review of the License Renewal Application - Set 32 NOC-AE-15003296, Request for Additional Information Regarding the License Amendment Request for Extension of Containment Leakage Rate Testing Program2015-10-0808 October 2015 Request for Additional Information Regarding the License Amendment Request for Extension of Containment Leakage Rate Testing Program ML15251A2492015-10-0505 October 2015 Summary of Telephone Conference Call Held on August 6, 2015, Between the U.S. Nuclear Regulatory Commission and STP Nuclear Operating Company, Concerning Request for Additional Information, Set 32, Pertaining to the South Texas Project, Lic ML15246A1282015-08-20020 August 2015 Attachment 1-5 Response to 2009 RAIs Through 1-6 Responses to Round 2 RAIs NOC-AE-15003278, Response to Request for Additional Information for the Review of License Renewal Application - Set 312015-07-29029 July 2015 Response to Request for Additional Information for the Review of License Renewal Application - Set 31 NOC-AE-15003276, Response to Request for Additional Information Regarding Relief Request RR-ENG-3-17 Regarding Deferral of Inservice Inspection of Reactor Pressure Vessel Cold Leg Nozzle Dissimilar Metal Butt Welds2015-07-22022 July 2015 Response to Request for Additional Information Regarding Relief Request RR-ENG-3-17 Regarding Deferral of Inservice Inspection of Reactor Pressure Vessel Cold Leg Nozzle Dissimilar Metal Butt Welds 2024-03-21
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 5, 2015 LICENSEE: STP Nuclear Operating Company FACILITY: South Texas Project
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 6, 2015 BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND STP NUCLEAR OPERATING COMPANY, CONCERNING REQUEST FOR ADDITIONAL INFORMATION, SET 32, PERTAINING TO THE SOUTH TEXAS PROJECT, LICENSE RENEWAL APPLICATION (TAC. NOS. ME4936 AND ME4937)
The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of STP Nuclear Operating Company held a telephone conference call on August 6, 2015, to discuss and clarify the staffs requests for additional information (RAIs) concerning the South Texas Project, license renewal application. The telephone conference call was useful in clarifying the intent of the staffs RAIs. provides a listing of the participants and Enclosure 2 contains a summary of the RAI discussions, including a brief description on the status of the items.
The applicant had an opportunity to comment on this summary.
/RA/
John W. Daily, Senior Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499
Enclosures:
- 1. List of Participants
- 2. List of Requests for Additional Information cc: Listserv
ML15251A249 *Concurred via e-mail OFFICE LA:DLR PM:RPB1:DLR BC:RPB1:DLR PM:RPB1:DLR NAME YEdmonds JDaily YDiaz-Sanabria JDaily DATE 9/ 28 /2015 9/ 30 /2015 10/ 2 /2015 10/ 5 /2015 TELEPHONE CONFERENCE CALL SOUTH TEXAS PROJECT LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS AUGUST 6, 2015 PARTICIPANT AFFILIATION John Daily Nuclear Regulatory Commission (NRC)
Bill Holston NRC Giovanni Facco NRC Arden Aldridge STP Nuclear Operating Company (STPNOC)
Rafael Gonzales STPNOC Gary Warner Worley Parsons ENCLOSURE 1
SUMMARY
OF CONFERENCE CALL STP LICENSE RENEWAL APPLICATION CONCERNING DRAFT RAI SET 32 AUGUST 6, 2015 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of STP Nuclear Operating Company (STPNOC or the applicant) held a telephone conference call on August 6, 2015, to discuss the staffs Request for Additional Information (RAI), RAI Set 32, for the South Texas Project, Units 1 and 2, license renewal application (LRA). The telephone conference call was useful in clarifying the staffs concerns in the RAI.
Discussion:
The staff and the applicant held a conference call on the draft RAIs contained in RAI Set 32 in order to clarify and ensure a common understanding of the information being requested.
Those issues and requests are presented below.
The staff agreed to look further into some of the points raised as presented below, prior to issuing the final version of the requests. Actions or changes agreed to in the call, or resolved shortly thereafter, are presented as part of the respective RAIs discussion.
The applicant agreed to take the staffs concerns into consideration as it prepares its responses.
Individual RAI drafts RAI B2.1.18-5a, Buried piping - soil sampling periodicity Issue:
Given that soil conditions can change over time, the staff lacks sufficient information to conclude that the licensing basis during the period of extended operation will be adequate. As amended by letter dated June 11, 2015, the licensing basis could result in only one set of soil samples being conducted.
Request:
State the basis for why the licensing basis during the period of extended operation will be adequate in regard to the periodicity of soil sampling.
Discussion:
No additional clarification was needed for this item.
ENCLOSURE 2
RAI B2.1.13-5a, LR-ISG-2013-01 inspection frequency follow-up Issue:
Two issues were presented:
- 1. Aging Management Program (AMP) XI.M42 Table 4a Footnote 3 states that a 6-year inspection interval may be extended to 12 years if: (a) the identical coating/lining material was installed with the same installation requirements in redundant trains with the same operating conditions and at least one of the trains is inspected every 6 years; and (b) the coating/lining is not in a location subject to erosion that could result in mechanical damage to the coating/lining. The staff lacks sufficient information to conclude that all internally-coated open-cycle cooling water system components are:
identical, installed with the same installation requirements, inspected such that at least one train is inspected every 6 years, located in areas with the same operating conditions; and not located in an area subject to erosion. The staff also noted that portions of the essential cooling water system are subject to erosion (e.g., downstream of control valves, pump discharge). LR-ISG-2013-01, Aging Management of Loss of Coating or Lining Integrity for Internal Coatings/Linings on In-Scope Piping, Piping Components, Heat Exchangers, and Tanks, AMP XI.M42, Internal Coatings/Linings for In-Scope Piping, Piping Components, Heat Exchangers, and Tanks, recommends that when peeling, delamination, blisters, or rusting are observed during inspections or when cracking and flaking that does not meet acceptance criteria is observed during inspections, the subsequent inspection interval is 4 years instead of 6 years. The responses to RAI 3.0.3-2a Part (d) and RAI B2.1.13-5a state that the specific degraded coatings will be replaced. However, with a known degradation mechanism potentially occurring in other locations with the same coating and environment, the staff concluded that inspections should be conducted more frequently than if no degradation was noted in prior inspections. The staff lacks sufficient information to conclude that a 6-year inspection interval is adequate when the extent of coating degradation, similar to the observed degradation that was repaired, is not known.
- 2. The extent of blistering, peeling, and delamination is not typically detectable by visual inspection alone. The corrective actions program element of LR-ISG-2013-01, Aging Management of Loss of Coating or Lining Integrity for Internal Coatings/Linings on In-Scope Piping, Piping Components, Heat Exchangers, and Tanks, AMP XI.M42, Internal Coatings/Linings for In-Scope Piping, Piping Components, Heat Exchangers, and Tanks, recommends that testing or examination be conducted to ensure that the extent of repaired coatings/linings encompasses sound material.
Request:
- 1. Four response items were identified:
- a. State whether the internally-coated open-cycle cooling water system components satisfy all of the provisions of Footnote 3 in AMP XI.M42, Table 4a.
- b. Justify why locations downstream of control valves and pump discharges are not subject to erosion.
- c. Justify the basis for the proposed inspection interval for the coatings being managed for loss of coating integrity in the Fire Water System Program and Internal Surfaces in Miscellaneous Piping and Ducting Components Program.
- d. State and justify the basis for how the extent of coatings that could be experiencing similar degradation to the coating areas that were repaired will be determined in a reasonable time frame.
- 2. The RAI also requests information on whether: (a) testing and examination will be conducted prior to and during the repair to ensure that replaced coatings encompasses sound coating material; and (b) the testing will include physical techniques in addition to visual examination.
Discussion:
Of the 2 issues in this RAI, Issue 2 and its requests did not require modifying as a result of the call. The discussion of Issue 1 initially resulted in reducing its scope so that it would focus on requests for details regarding LR-ISG-2013-01 subsequent inspection intervals. The staff also observed that an adequate basis for inspecting EW pump internal coatings did not seem to be provided. Ultimately it became clear during further consideration of Issue 1) that this RAI may need further clarification, therefore it will be deleted from Set 32 and will be placed into a future set instead.
RAI B2.1.13-6a, Follow-up testing on repaired components Issue:
LRA Sections A1.9, A1.13, and A1.22 were not revised to address performing physical testing where physically possible in conjunction with repair or replacement of coatings. Therefore, the licensing basis for the programs will not be consistent with SRP-LR Table 3.0-1, FSAR Supplement for Aging Management of Applicable Systems. The staff cannot conclude that the licensing basis during the period of extended operation will be adequate without addressing physical testing associated with coating repairs or replacement.
Request:
State the basis for why the licensing basis for the Open-Cycle Cooling Water System, Fire Water System, and Internal Surfaces in Miscellaneous Piping and Ducting Components Programs during the period of extended operation will not include a statement related to follow-up testing requirements of coatings that are repaired.
Discussion:
No additional clarification was needed for this item.
RAI 3.0.3-2b, Extent of internally-coated components inspection Issue:
LRA Sections B2.1.9, Open-Cycle Cooling Water System Program, B2.1.13, Fire Water System Program, and B2.1.22, Internal Surfaces in Miscellaneous Piping and Ducting Components Program, were not revised to state the extent of inspections for internally coated components.
Request:
State why the percent of total coating surface being inspected was not included in LRA Sections B2.1.9, B2.1.13, and B2.1.22.
Discussion:
As a result of discussion, the staff agreed that adequate details have been already provided for B2.1.13, Fire Water System Program, and B2.1.22, Internal Surfaces in Miscellaneous Piping and Ducting Components Program. Therefore, additional clarification was only needed for LRA Sections B2.1.9, Open-Cycle Cooling Water System Program, and associated internal coatings of the open-cycle cooling water system(s).
RAI 3.0.3-2c, Standard for holiday testing Issue:
The response did not state the specific edition of the standards that will be used. The staff cannot complete its evaluation of the RAI response without the program stating the specific year of the standard. For example, the staff has endorsed the 2009 edition when conducting adhesion testing in accordance with ASTM [ASTM International] D4541, Standard Test Method for Pull-Off Strength of Coatings Using Portable Adhesion Testers. During its review of the RAI response, the staff used the following editions:
- ASTM D5162-08, Standard Practice for Discontinuity (Holiday) Testing of Nonconductive Protective Coating on Metallic Substrates
- ASTM D7091-13, Standard Practice for Nondestructive Measurement of Dry Film Thickness of Nonmagnetic Coatings Applied to Ferrous Metals and Nonmagnetic, Nonconductive Coatings Applied to Non-Ferrous Metals
- Society For Protective Coatings (SSPC) standard SSPC PA January 2015, Procedure for Determining Conformance to Dry Coating Thickness Requirements Request:
State the specific edition that will be used for the cited ASTM and SSPC standards.
Discussion:
No additional clarification was needed for this item.
RAI B2.1.20-5, External surfaces - inspection of inaccessible components Issue:
It is not clear to the staff when inaccessible components will be inspected.
Request:
State the schedule for recurring inspections of inaccessible components to ensure the intended functions are maintained.
Discussion:
This RAI will be dropped since the staff verified that the issues were already addressed by the applicants response to RAI B2.1.20-4 by letter dated September 15, 2011, on the docket.
Letter to STP Nuclear Operating Company from J. Daily Dated October 5, 2015
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON AUGUST 6, 2015 BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND STP NUCLEAR OPERATING COMPANY, CONCERNING REQUEST FOR ADDITIONAL INFORMATION, SET 32, PERTAINING TO THE SOUTH TEXAS PROJECT, LICENSE RENEWAL APPLICATION (TAC. NOS. ME4936, ME4937)