ML20215J935: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:COMANCE PEAK RESPONSE TEAM fx t
{{#Wiki_filter:COMANCE PEAK RESPONSE TEAM
      ) DESIGN ADEQUACYPROCEDURE ADDEboUM Procedure:       DAP-9 Revision:         1 Addendum:         1
^
fx t
)
DESIGN ADEQUACYPROCEDURE ADDEboUM Procedure:
DAP-9 Revision:
1 Addendum:
1


==Title:==
==Title:==
PREPARATION AND APPROVAL OF DISCIPLINE SPECIFIC RESULTS REPORTS AND DAP COLLECTIVE EVALUATION REPORT PURPOSE This addendum changes the definition of the section's scope.
PREPARATION AND APPROVAL OF DISCIPLINE SPECIFIC RESULTS REPORTS AND DAP COLLECTIVE EVALUATION REPORT PURPOSE This addendum changes the definition of the section's scope.
SCOPE Revise Section 6.0 of Attachment C of DAP-9, Rev.1 (pC-2) to read:
SCOPE Revise Section 6.0 of Attachment C of DAP-9, Rev.1 (pC-2) to read:
6.0   ROOT CAUSES AND GENERIC IMPLICATIONS "This section describes the root cause and generic implicottons methodology used by the Design Adequacy Program and discusses the conclusions reached by its application. This h)
6.0 ROOT CAUSES AND GENERIC IMPLICATIONS "This section describes the root cause and generic implicottons methodology used by the Design Adequacy Program and h) discusses the conclusions reached by its application.
V          section also discusses root causes potentially attributable to programmatic elements of the design process that have been referred to the OA/OC TRL. Information received from the OA/QC RTL regarding quality program weaknesses offecting design and his recommendations for improvement for both ongoing and future programs shall be discussed. This section will supplement these recommendations with appropriate discussions of engineering work processes, management of these processes, and the effectiveness of implementation of the design OA program."
This V
INSTRUCTION This addendum is ef fective upon approval and shall remain in effect until opproval of the next revision of DAP-9. This addendum shall be securely attached to each controlled copy of DAP-9.
section also discusses root causes potentially attributable to programmatic elements of the design process that have been referred to the OA/OC TRL. Information received from the OA/QC RTL regarding quality program weaknesses offecting design and his recommendations for improvement for both ongoing and future programs shall be discussed. This section will supplement these recommendations with appropriate discussions of engineering work processes, management of these processes, and the effectiveness of implementation of the design OA program."
Prepared By:             c                 Date:    T Reviewed By:         I                     Date:   Th d           Approved By:   ~                          Date:     9!I[flb
INSTRUCTION This addendum is ef fective upon approval and shall remain in effect until opproval of the next revision of DAP-9.
                                  .~                                    ,
This addendum shall be securely attached to each controlled copy of DAP-9.
                                                                              ~
Date:
L L ' ~ A .I. . . ' ' i TN-85-6262/9                                                   ju)     9I             ' ~
T Prepared By:
e610270254 e61010 PDH   ADOCK 00000445 A                   PDR i}}
c Th Reviewed By:
I Date:
9!I[flb d
Approved By:
Date:
~.~
L L ' ~ A.I... ' ' i
~
TN-85-6262/9 ju) 9I
~
e610270254 e61010 PDH ADOCK 00000445 i
A PDR}}

Latest revision as of 21:57, 3 December 2024

Addendum 1 to Rev 1 to Design Adequacy Procedure DAP-9, Preparation & Approval of Discipline Specific Results Repts & DAP Collective Evaluation Rept
ML20215J935
Person / Time
Site: Comanche Peak  
Issue date: 09/15/1986
From: Dougherty F
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20215J430 List: ... further results
References
DAP-9-ADD, NUDOCS 8610270254
Download: ML20215J935 (1)


Text

COMANCE PEAK RESPONSE TEAM

^

fx t

)

DESIGN ADEQUACYPROCEDURE ADDEboUM Procedure:

DAP-9 Revision:

1 Addendum:

1

Title:

PREPARATION AND APPROVAL OF DISCIPLINE SPECIFIC RESULTS REPORTS AND DAP COLLECTIVE EVALUATION REPORT PURPOSE This addendum changes the definition of the section's scope.

SCOPE Revise Section 6.0 of Attachment C of DAP-9, Rev.1 (pC-2) to read:

6.0 ROOT CAUSES AND GENERIC IMPLICATIONS "This section describes the root cause and generic implicottons methodology used by the Design Adequacy Program and h) discusses the conclusions reached by its application.

This V

section also discusses root causes potentially attributable to programmatic elements of the design process that have been referred to the OA/OC TRL. Information received from the OA/QC RTL regarding quality program weaknesses offecting design and his recommendations for improvement for both ongoing and future programs shall be discussed. This section will supplement these recommendations with appropriate discussions of engineering work processes, management of these processes, and the effectiveness of implementation of the design OA program."

INSTRUCTION This addendum is ef fective upon approval and shall remain in effect until opproval of the next revision of DAP-9.

This addendum shall be securely attached to each controlled copy of DAP-9.

Date:

T Prepared By:

c Th Reviewed By:

I Date:

9!I[flb d

Approved By:

Date:

~.~

L L ' ~ A.I... ' ' i

~

TN-85-6262/9 ju) 9I

~

e610270254 e61010 PDH ADOCK 00000445 i

A PDR