ML20215K090
| ML20215K090 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 07/30/1986 |
| From: | Hansel J, Zill R EVALUATION RESEARCH CORP., TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | |
| Shared Package | |
| ML20215J430 | List:
|
| References | |
| CPP-026, CPP-26, NUDOCS 8610270352 | |
| Download: ML20215K090 (2) | |
Text
,
g k
.. h ;
't j
Pags 1 of 2 g{};55_i10M 0{_j l
n EVALUATION RESEARCH CORPORATION CONTRO_ED CO?Y./4 CONTROL NO 4(2C@
l COMANCHE PEAK RESPONSE TEAM PROJECT PROCEDURE FOR QA/QC ISSUE-SPECIFIC ACTION PLAN VII C CHANGE NOTICE NO: 001 PROCEDURE NO: CPP-026 REVISION: 0 ISSUE DATE:
07/30/86
_ FINAL REVIEW OF ISAP VII C WORKING FILES The CPP identified above is hereby changed as shown on the attached page of this notice.
/Q
/
I
[d
- [
Prepared by:
/
i Date:
b N Ed Approved by:
Date:
On-SiteQARgesentative Approved by:
I,,eeft' Date:
7 Id T[
Q C Review Teau$ Leader
- I
(
B610270352 861010 DR ADOCK 05000445 PDR l
8 l
.qq CHANGE NOTICE: 001 f
CPP-026
,~
Revision: 0 1.
5.0 FRASE 1: Identified documents lists, O-
- " Work Process Memoranda"
- " Accessibility Memoranda"
- To be reviewed in Phase 3.
2.
5.0 PHASE 2: Delete " Satisfactory" 3.
5.0 PHASE 3: Delete " Satisfactory" 4.
5.0 PHASE 4: Delete " Satisfactory" O
l
\\
l t
f O
2