ML20215K017
| ML20215K017 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 07/25/1986 |
| From: | EVALUATION RESEARCH CORP. |
| To: | |
| Shared Package | |
| ML20215J430 | List:
|
| References | |
| QI-008-02, QI-8-2, NUDOCS 8610270312 | |
| Download: ML20215K017 (2) | |
Text
,
~ ~.
Paga 1 of 2 EVALUATION RESEARCH CORPORATION COMANCHE PEAK RESPONSE TEAM QUALITY INSTRUCTION FOR ISSUE-SPECIFIC ACTION PLAN VII.c 3 C0]
CHANGE NOTICE: 002 INSTRUCTION NO: QI-008 g{g REVISION: 4 EFFECTIVE DATE: 07/25/86 7
i.
t.
REINSPECTION OF CONDUIT /I-E-CDUT I
l hb Prep t
r2,.s,-
Date:
i C
T. - :. s
~
s-i.
/WM h.
Date: 7~NiI Q:,IssueCoordinator Approved by:
Date:
9'AY~ M On Sfte QA @ resentative 4!8[.
Approved by:
b Date:
3 Q4/QC Review Team yader
//
8610270312 861010 PDR ADOCK 05000445 A
..x., :;;
Chang 2 Notica 002 Q-QI-008 Rev. 4 s
1.-
For Attribute 4.a (Fittings), the following exception should be added:
Exception: Insulating bushings or sleeve inserts are not required for stainless steel flexible conduit.
v i,.
- t...
y..
/
f
- W"I
~
n s:
7
- l,
.; ~
j m
w8W-.-
l l
l l
l 2
-