Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211Q4981999-09-10010 September 1999 Proposed Tech Specs Clarifying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits & Adding Ref to Caldon TR for LEFM ML20211G3221999-08-26026 August 1999 Proposed Tech Specs 4.0.6 Re SG Surveillance Requirements ML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20210R7091999-08-13013 August 1999 Revised Proposed Tech Specs for LAR 98-010,proposing Rev to TS Table 3.3.1-1, Rt Sys Instrumentation & TS Table B 3.3.1-1, Rt Sys Setpoints ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20209E1861999-07-0909 July 1999 Proposed Tech Specs,Adding Reactor Core Safety Limit Figures to Section 5.6.5 of Ts,Clarifying That Overpower N-16 Setpoint Remains in TS & Reflecting NRC Approval of TRs Used to Determine Core Operating Limits Presented in COLR ML20212J4251999-06-23023 June 1999 Proposed Tech Specs,Revising EDG Start Be Emergency Start Instead of Normal Start Following Loss of Offsite Power ML20195E5401999-06-0404 June 1999 Proposed Tech Specs Pages 3.2-6,3.4-24,3.4-25,3.7-23,3.7-30, 3.8-25,3.9-9,3.9-10 & 4.0-2,provided as Addl Aditorial Changes Supplementing LAR 99-001 ML20195B6461999-05-27027 May 1999 Marked-up TS Pages Re LAR 99-004,changing Plant Battery Surveillance ML20195B6771999-05-24024 May 1999 Proposed Tech Specs Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206G7111999-05-0404 May 1999 Proposed Tech Specs Revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20207F3511999-02-25025 February 1999 Fire Endurance Test to Qualify Protective Envelope for Class IE Electrical Circuits ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20198J3171998-12-21021 December 1998 Proposed Tech Specs,Proposing Changes Administratively for Unit 1 & Increasing Licensed Power for Operation of Unit 2 to 3445 Mwt ML20198J2541998-12-18018 December 1998 Proposed Tech Specs Sections 1.0,3.1,3.3,3.4,3.6,3.7,3.9 & 5.0,converting to ITS ML20198J5211998-12-17017 December 1998 Corrected Tech Specs Pages for Section 3.8 to 971211 Submittal Re TS Conversion Application ML20197K0491998-12-11011 December 1998 Proposed Tech Specs Section 3.8, Electrical Power Systems, Converting to ITS ML20196C5361998-11-20020 November 1998 Proposed TS Converting to ITS Sections 4.0,3.4 & 3.6 ML20195F1751998-11-13013 November 1998 Proposed Tech Specs,Revising Administrative Controls Section to Include Configuration Risk Mgt Program Into CPSES TS ML20195F5291998-11-11011 November 1998 Proposed Tech Specs Revising Core Safety Limit Curves & Overtemperature N-16 Reactor Trip Setpoints for Unit 2 Cycle 5 ML20196B8811998-10-30030 October 1998 Proposed Tech Specs Section 3.3 Re Instrumentation ML20154R7861998-10-21021 October 1998 Proposed Tech Specs Section 3.7, Plant Systems ML20154S2901998-10-14014 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Control,Respectively ML20154C9101998-10-0202 October 1998 Proposed Tech Specs 4.0.6, SG SR, Adding Definitions Required for F* Alternate Plugging Criterion & Identifies Portion of Tube Subject to Criteria ML20153E2661998-09-24024 September 1998 Proposed Improved Tech Specs Sections 3.4, RCS & 5.0, Administrative Controls ML20237E8461998-08-28028 August 1998 Proposed Tech Specs Pages Re Sections 1.0,2.0 & 3.0 of Proposed TS Changes in 980707 & s,In Response to NRC RAI ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20236J3131998-07-0101 July 1998 Revised Proposed Tech Specs Pages Re Safety Injection Signal & Blackout Signal ML20249C6101998-06-22022 June 1998 Proposed Tech Specs Section 3.6 Re Conversion Application ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20216E6291998-04-0909 April 1998 Marked-up TS Pages,Reflecting Proposed Changes in Amends to Licenses NPF-87 & NPF-89 ML20216B1471998-04-0606 April 1998 Proposed Tech Specs,Allowing Plant to Continue to Operate W/O Having to Perform Portions of SRs ML20217A3901998-03-18018 March 1998 Proposed Tech Specs Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power Re Enforcement Discretion ML20216H1361998-03-13013 March 1998 Proposed Tech Specs Re Electrical Systems Surveillance Requirements ML20248L3191998-03-12012 March 1998 Proposed Tech Specs TS 4.8.1.1.2f.4)b) & TS 4.8.1.1.2f.6)b) Re Request for Enforcement Discretion ML20216D6021998-03-0909 March 1998 Proposed Tech Specs Temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a),for Unit 2 Only ML20203K8621998-02-27027 February 1998 Proposed Tech Specs,Increasing RWST low-low Level Setpoint ML20203J5211998-02-25025 February 1998 Proposed Tech Specs Page to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements 4.8.1.1.2f.4(a) & 4.8.1.1.2f.7(a) Until Plant Startup Subsequent to Next Refueling Outage ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20202B1641998-02-0505 February 1998 Proposed Tech Specs Bases 3/4.7.1.5 Re Main Steam Line Isolation Valves ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212C3881997-10-24024 October 1997 Proposed Tech Specs Re Revised Core Safety Limit Curves & Revised Overtemperature N-16 Reactor Trip Setpoints 1999-09-10
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212E9811997-10-0606 October 1997 Rev 11 to CPSES Units 1 & 2 IST Plan for Pumps & Valves First Interval ML20210S3911997-09-0303 September 1997 Rev 10 to CPSES Units 1 & 2 Inservice Testing Plan for Pumps & Valves in First Interval ML20151L1391997-07-31031 July 1997 5 to Technical Requirements Manual, for Plant ML20141E6201997-06-26026 June 1997 Rev 24 of CPSES Units 1 & 2 Technical Requirements Manual ML20141F8471997-06-26026 June 1997 Rev 9 to IST Plan for Pumps & Valves First Interval ML20136G4361997-03-13013 March 1997 Rev 23 to CPSES Units 1 & 2 Technical Requirements Manual ML20135A8241997-02-24024 February 1997 Rev 22 to CPSES Units 1 & 2 Technical Requirements Manual ML20134C6831997-01-31031 January 1997 Rev 8 to Comanche Peak Steam Electric Station Units 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20134M4371996-11-13013 November 1996 Self Assessment Guide Program Guidelines ML20129A5991996-10-16016 October 1996 Rev 7 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20128G7661996-10-0202 October 1996 CPSES Unit 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20138B5181996-10-0101 October 1996 Rev 14 to ODCM for TU Electric CPSES Units 1 & 2 ML20117C8461996-07-19019 July 1996 Glen Rose,Tx ASME Section XI ISI Program Plan,Unit 1 - 1st Interval Rev 4 ML20217M1691996-05-24024 May 1996 Rev 3 to STA-750, Check Valve Reliability Program ML20117C6181996-05-0303 May 1996 Rev 1 to Unit 2 ISI Plan ML20117C6141996-04-14014 April 1996 Rev 1 to Unit 2 ISI Plan ML20107J0941996-04-0202 April 1996 Rev 1 to Interim Change Request ISI-2, CPSES Unit 2 ASME Section XI ISI Program Plan ML20107E4471996-02-0909 February 1996 Rev 1 of CPSES ASME XI ISI Program Plan Unit 2 ML20100B9471996-01-24024 January 1996 Rev 21 of CPSES Units 1 & 2 Technical Requirements Manual ML20086C5491995-06-30030 June 1995 Rev 20 to Technical Requirements Manual ML20091L1941995-03-29029 March 1995 Interim Change Request ISI-IR3-003, Unit 1 ISI Plan ML20081F1131995-03-12012 March 1995 Interim Change Request ISI-1R3-02 to Rev 3 to Unit 1 ISI Plan ML20080Q3351995-02-24024 February 1995 Rev 17 to CPSES Technical Requirements Manual ML20078R6371995-02-15015 February 1995 Rev 5 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20078H8501994-11-30030 November 1994 CPSES Odmc Rev Change Sheet ML20073L6591994-10-0606 October 1994 Rev 4 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20072C7081994-07-24024 July 1994 Rev 16 to Simulator Operations/Maint Instruction - 010, Simulator Certification Testing ML20069E5171994-05-17017 May 1994 Interim Change Request ISI-2RO-001, Comanche Peak Ses Unit 2 ISI Program Plan ML20029D0711994-05-11011 May 1994 Rev 16 to Technical Requirements Manual. ML20065K1721994-04-15015 April 1994 Rev 15 to CPSES Units 1 & 2 Technical Requirements Manual ML20058E3841993-11-30030 November 1993 Rev 14 to Technical Requirements Manual, Page 2-27, Clarifying Discussion in Table 2.1.1 Notations for Local Test Connections,Vent & Drain Valves & Revising List of Effective Pages EPL-1 Through EPL-4 ML20058C4441993-11-23023 November 1993 IST Plan for Pumps & Valves First Interval, Rev 3 ML20058B5791993-11-19019 November 1993 Rev 14 to Comanche Peak Steam Electric Station Technical Requirements Manual ML20058J9711993-11-19019 November 1993 Interim Change Request ISI-1R2-005 to Rev 2 to Unit 1 ISI Plan ML20056D8161993-08-11011 August 1993 Salp,Directive 8.6 1999-08-05
[Table view] |
Text
- --
I IU..s.
I[tjf:'e,N~D('ji
. i : . . u.
i p n, r~'[]p\/
. u .. :
1Da li;10!d,isi;0H CN!.'r' D
CONTRO -
N COMWOL EVALUATION RESEARCH CORPORATION i
COMANCHE PEAK RESPONSE TEAM l
PROJECT PROCEDURE FOR SPECIFIC ACTION PLAN VII.c CHANGE NOTICE: 001 PROCEDURE Noi QI.-006
, REVISION NO: 2 1 l l EFFECTIVE DATE: 08/06/86 l
l l
l REINSPECTION OF TYPE 2 SKEWED WELDS Prepared by: Date: 9 84
"%) '/
Approved by: M F k, "E" . /N ,
Issus Coordinator //
Approved by: Dat : f,! ,!Y 7d On-Site QA R jeesentative /'
Approved by: -() Date: O lo!#,
QA/p Review Team Leadeg //
8610270304 861010 l PDR ADOCK 05090445 ,
1 A PDR l
-:t Ch ngs Notico 001 )
\'01-006 !
Rev. 2 !
Page 1 of 1 )
I i
i l
1
- 1. Change Attachment 6.5, #2 and #53 to read:
- 2. CC-1-202-001-S53A 1
t 53. CT-1-033-414-C92A 9
e a
A
% e v
~-
l l
1 l
Instruction Sheet (QI's) l .- Remove Insert Notes Table of Contents Table of Contents 06/27/86 08/06/86 QI-006, Rev. 2 .
In front of Change Notice 001 QI-006, Rev. 2 QI-008, Rev. 4 In front of Change Notice 002 QI-008, Rev. 4 Change Notice 001 QI-021, Rev. 2 In front of Change Notice 003 01-021, Rev. 2 Change Notice 002 QI-022, Rev. 1 In front of I Change Notice 001 QI-022, Rev. 1 QI-040, Rev. 1 In front of Change Notice 001 QI-040, Rev. 1 QI-044, Rev. 2 Change Notice 002 i QI-044, Rev. 2 Change Notice 001 QI-044, Rev. 2 QI-044, Rev. 3 QI-051, Rev. 2 In front of Change Notice 001 QI-051, Rev. 2
, QI-068, Rev. 2 QI-068, Rev. 3 QI-71, Rev. 2 In front of i Change Notice 001 QI-071, Rev. 2 QI-075, Rev. O In front of
! Change Notice 001 QI-075, Rev. 0 I
~
___a
r
- [ U5UUSTROE'ED Udis/~'!
F0il liiF0i? Mail 0N CNLY l O EVALUATION RESEARCH CORPORATION
=
QUALT.TY INSTRUCTIONS '
FOR COMANCHE PEAK QUALITY ASSESSMENT PROG A TABLE OF CONTENTS I g\h
~ '
08/06/86 CHANGE QI DATE NOTICE DATE TITLE REV NUMBER Table of Contents 08/06/86 001 Procedure for Class IE Cable 3 12/28/84 Terminations Inspection-CPRT Action Item I.a.4 002 CPRT Action Item I.a.2. Inspection 4 02/05/85 Report on Butt Splices and CPRT Action Item I.a.3, Butt Splice O Qualifications 0 01/15/85 003 Procedure for Class 1E Esat Shrinkable Cable Insulation Sleeves - CPRT Action Item I.a.1 004 CPRT Action Item I.b.1- 4 03/12/85 Flexible Conduit to Flexible Conduit Separation CPRT Action Item I.b.2 Flexible Conduit to Cable Separation 005 Evaluation of Inspector Performance 3 04/23/86 2 09/28/85 1 08/06/86 006 Rainspection of Type 2 Skewed Welds 007 Reinspection of Plus Welds 4 04/24/86 Reinspection of Conduit /I-E-CDUT 4 6 1 03 27 86 008 2 02/24/86 2 07/25/86 009 Document Review of Conduit /R-E-CDUT 010 Rainspection of Electrical Equipment / 3 02/21/86 I-E-EEIN 011 Documentation Review of Electrical 1 03/07/86 Equipment /R-E-EEIN
O QI CHANGE NUMBER TITLE REV DATE NOTICE DATE 012 Reinspection of Instrumentation 1 01/30/86 1 02/25/86 Equipment /I-E-ININ 013 Documentation Review for 5 02/04/86 1 06/04/86 Instrumentation Equipment /R-E-ININ 2 06/26/86 014 Reinspection of Cables /I-E-CABL 'l 02/19/86 1 03/12/86 2 04/09/86 3 04/18/R6 015 Documentation Review of Cables / 4 02/12/86 1 04/09/86 4-6/30/1 bb 016 Reinspection of Cable Trays /I-E-CATY 3 04/03/86 1 04/07/86 017 Documentation Review of Cable Tray / 1 02/12/86 1 02/19/86 R-E-CATY 2 06/23/86 018 Reinspection of Previously 0 07/29/85 1 09/19/85 Disassembled Valves 2 03/21/86 i
019 Reinspection of Small Bore Pipe 4 06/27/86 1 ~'4/17/A6 0
Supports 020 Documentation Review of Small 1 03/03/86 Bore Pipe Supports 021 Reinspection of Piping System 2 02/05/86 1 05/08/86 Bolted Joint / Materials 2 05/15/86 l 3 91 sl%
l 022 Documentation Review of Piping 1 02/05/86 q l5 lg Systen Bolted Joints / Material l 023 Reinspection of HVAC Equipment 2 02/24/86 1 03/06/86 Installation 2 05/13/86 024 Reserved 025 Reinspection of Large Bore Piping 3 04/22/86 Configuration 026 Reinspection of Small Bore Piping 2 04/21/86 Configuration 027 Reinspection of Large Bore Pipe 3 06/27/86 Supports - Rigid O
2 i
r 1
O QI CHANGE NUMBER TITLE REV DATE NOTICE DATE i
028 Documentation Review of Large Bore 1 03/06/86 Pipe Supports - Rigid 029 Reinspection Procedures for Large 3 06/27/86 Bore Pipe Supports-Non Rigid 030 Documentation Review of Large Bore 1 03/07/86 Pipe Supports-Non-Rigid 031 Reinspection of Containment Liner 2 02/21/86 1 04/24/86 and Tank Stainless Steel Liner 032 Documentation Review of Containment 2 06/27/86 Liner and Tank Stainless Steel Liners 033 Reinspection of Fuel Bailding 1 03/07/86 1 04/07/86 Fuel Fool Liners 034 Documentation Review of Fuel 2 06/27/86
() 035 Building Fuel Pool Liners Reinspection of HVAC Duct Supports 1 03/19/86 036 Documentation Review of HVAC Duct 1 03/10/86 1 07/09/86 Supports 037 Reinspection of Pipe Supports TRT 1 03/21/86 Issues - Pipe Supports in Rm 77K, Safeguards Bids., Unit 1 I
- 038 RESERVED 039 Reinspection of HVAC Ducts 1 02/20/86 and Plenuss 040 Documentation Review of HVAC Ducts 1 02/20/86 1 07/23/86 and Plenues 041 Reinspection of Field Fabricated 1 01/29/86 Tanks 042 Documentation Review of Field 1 01/30/86 1 06/12/86 Fabricated Tanks O
3 0141/QI l
r e
O QI CHANGE NUMBER TITLE REV DATE NOTICE DATE 043 Reinspection of Concrete Placement 2 02/20/86 1 05/21/86 044 Documentation Review of Concrete 3 07/22/86 -
Placements 045 Reinspection of Structural Steel 3 06/27/86 046 Documentation Review of Structural 2 06/27/86 Steel 047 Reinspection of Small Bore Pipe 2 03/18/86 1 04/03/86 Welds / Material 048 Documentation Review of Tubing 1 05/09/86 2 06/06/86 Welds / Material 1 049 Reinspection of Large Bore 1 03/18/86 1 04/03/86 Pipe Welds / Material 050 Reinspection of Pipe Welds / Material 0 03/18/86 l 051 Reinspection of Pipe Whip Restraints 2 06/27/86 ql l 052 Documentation Review of Pipe Whip 1 02/20/86 1 06/02/86 Restraints 053 Reinspection of Category I conduit 1 02/26/86 1 06/11/86 Supports /I-S-COSF 054 Documentation Review of Category I 1 02/27/86 1 06/27/86 Conduit Supports /R-S-COSP 055 Reinspection of Instrument Pipe / 2 02/27/86 Tube Supports /I-S-INSP 056 Documentation Review of Instrument 1 02/27/86 1 06/27/86 Pipe / Tubing Supports /R-S-INSP 057 Documentation Review of Fill and 6 06/27/86 Backfill Placement 058 Reinspection of Pipe Supports-TRT 2 06/27/86 Issues - 42 Pipe Supports 059 Reinspection of Machanical Equipment 3 06/13/86 Installation 4 0141/QI
t t
O QI CHANGE NUMBER TITLE REV DATE NOTICE DATE 060 Documentation Review of Mechanical 2 06/17/86 Equipment Installation 061 Documentation Review of TRT Issues 0 11/26/85 42 Pipe Supports 062 Inspection of Non-Pressure 0 10/25/85 1 12/18/85 Boundary Welds for a Supplementary Evaluation of Visual Welding Inspection Techniques 063 Reinspection of Torque for Drilled- 1 01/30/86 1 02/10/86 In Concrete Expansion Anchors (Hilti Bolts) 064 Reserved 065 Reserved l
\ 066 Reinspection of Equipment Supports 1 02/11/86 1 02/12/86
- 2 04/03/86 067 Documentation Review of Equipment 1 04/30/86 Supports j 068 Documentation Review of Cement Grout 3 08/06/86 i
069 Documentation Review of Epoxy Grout 1 01/29/86 1 02/24/86 2 03/18/86 3 04/14/86 070 Reinspection of Tubing Welds Material / 2 03/19/86 1 08/06/86 I-M-TUWM 071 Reinspection of Lighting cable / 1 01/28/86 I-E-LITG 072 Documentation Review of Lighting 1 01/28/86 Cable /R-E-LITG 073 Documentation Review of Pipe 0 05/16/86 1 05/22/86 Walde/ Material 074 Documentation Review of NIS Cable 0 03/10/86 -
Terminations /R-E-NIST 075 Reinspection of Piping Bends 0 05/02/86 ,
Fabrication I ifif %(,
5 0141/QI
- - _ . _ - _- . _ - . - - _ - . - - .