Change Notice 001 to Rev 2 to Project Procedure QI-006, Reinsp of Type 2 Skewed Welds
ML20215K008
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/06/1986
From:
EVALUATION RESEARCH CORP.
To:
Shared Package
ML20215J430 List: ... further results
References
QI-006-01, QI-6-1, NUDOCS 8610270304
Download: ML20215K008 (8)


Text

- _ _ _

I I I[tjf:'e,N~D('ji i p n, r~'[]p\\/

U..s.

. i :.. u.

u..

1Da li;10!d,isi;0H CN!.'r' D

CONTRO N

COMWOL EVALUATION RESEARCH CORPORATION i

COMANCHE PEAK RESPONSE TEAM PROJECT PROCEDURE FOR SPECIFIC ACTION PLAN VII.c CHANGE NOTICE: 001 PROCEDURE Noi QI.-006 REVISION NO: 2 1

l l

EFFECTIVE DATE: 08/06/86 l

l l

l REINSPECTION OF TYPE 2 SKEWED WELDS Prepared by:

Date:

9 84

"%)

'/

/N,

Approved by:

M F k, "E"

Issus Coordinator

//

f,!,!Y 7d Approved by:

Dat :

On-Site QA R jeesentative

/'

O lo!#,

Approved by:

-()

Date:

QA/p Review Team Leadeg

//

8610270304 861010 l

PDR ADOCK 05090445 1

A PDR l

-:t Ch ngs Notico 001

\\'01-006 Rev. 2 Page 1 of 1 i

i l

1 1.

Change Attachment 6.5, #2 and #53 to read:

2.

CC-1-202-001-S53A t

53.

CT-1-033-414-C92A 9

e a

A

% e v

~-

1 Instruction Sheet (QI's) l.-

Remove Insert Notes Table of Contents Table of Contents 06/27/86 08/06/86 QI-006, Rev. 2 QI-006, Rev. 2 In front of Change Notice 001 QI-008, Rev. 4 In front of Change Notice 002 QI-008, Rev. 4 Change Notice 001 QI-021, Rev. 2 In front of Change Notice 003 01-021, Rev. 2 Change Notice 002 QI-022, Rev. 1 In front of I

Change Notice 001 QI-022, Rev. 1 QI-040, Rev. 1 In front of Change Notice 001 QI-040, Rev. 1 QI-044, Rev. 2 Change Notice 002 QI-044, Rev. 2 i

Change Notice 001 QI-044, Rev. 2 QI-044, Rev. 3 QI-051, Rev. 2 In front of Change Notice 001 QI-051, Rev. 2 QI-068, Rev. 2 QI-068, Rev. 3 QI-71, Rev. 2 In front of i

Change Notice 001 QI-071, Rev. 2 QI-075, Rev. O In front of Change Notice 001 QI-075, Rev. 0 I

~

a

r

[

U5UUSTROE'ED Udis/~'!

F0il liiF0i? Mail 0N CNLY l

O

=

EVALUATION RESEARCH CORPORATION QUALT.TY INSTRUCTIONS FOR COMANCHE PEAK QUALITY ASSESSMENT PROG A

TABLE OF CONTENTS I

g\\h

~

08/06/86 CHANGE QI NUMBER TITLE REV DATE NOTICE DATE Table of Contents 08/06/86 001 Procedure for Class IE Cable 3

12/28/84 Terminations Inspection-CPRT Action Item I.a.4 002 CPRT Action Item I.a.2. Inspection 4

02/05/85 Report on Butt Splices and CPRT Action Item I.a.3, Butt Splice O

Qualifications 003 Procedure for Class 1E Esat 0

01/15/85 Shrinkable Cable Insulation Sleeves - CPRT Action Item I.a.1 004 CPRT Action Item I.b.1-4 03/12/85 Flexible Conduit to Flexible Conduit Separation CPRT Action Item I.b.2 Flexible Conduit to Cable Separation 005 Evaluation of Inspector Performance 3 04/23/86 006 Rainspection of Type 2 Skewed Welds 2

09/28/85 1

08/06/86 007 Reinspection of Plus Welds 4

04/24/86 008 Reinspection of Conduit /I-E-CDUT 4

6 1

03 27 86 009 Document Review of Conduit /R-E-CDUT 2

02/24/86 2

07/25/86 010 Rainspection of Electrical Equipment /

3 02/21/86 I-E-EEIN 011 Documentation Review of Electrical 1

03/07/86 Equipment /R-E-EEIN

O QI CHANGE NUMBER TITLE REV DATE NOTICE DATE 012 Reinspection of Instrumentation 1

01/30/86 1

02/25/86 Equipment /I-E-ININ 013 Documentation Review for 5

02/04/86 1

06/04/86 Instrumentation Equipment /R-E-ININ 2

06/26/86 014 Reinspection of Cables /I-E-CABL

'l 02/19/86 1

03/12/86 2

04/09/86 3

04/18/R6 015 Documentation Review of Cables /

4 02/12/86 1

04/09/86 4-6/30/1 bb 016 Reinspection of Cable Trays /I-E-CATY 3

04/03/86 1

04/07/86 017 Documentation Review of Cable Tray /

1 02/12/86 1

02/19/86 R-E-CATY 2

06/23/86 018 Reinspection of Previously 0

07/29/85 1

09/19/85 Disassembled Valves 2

03/21/86 i

~'4/17/A6 0

019 Reinspection of Small Bore Pipe 4

06/27/86 1

Supports 020 Documentation Review of Small 1

03/03/86 Bore Pipe Supports 021 Reinspection of Piping System 2

02/05/86 1

05/08/86 Bolted Joint / Materials 2

05/15/86 l

3 91 sl%

022 Documentation Review of Piping 1

02/05/86 q l5 lg l

Systen Bolted Joints / Material l

023 Reinspection of HVAC Equipment 2

02/24/86 1

03/06/86 Installation 2

05/13/86 024 Reserved 025 Reinspection of Large Bore Piping 3

04/22/86 Configuration 026 Reinspection of Small Bore Piping 2

04/21/86 Configuration 027 Reinspection of Large Bore Pipe 3

06/27/86 Supports - Rigid O

2 i

r 1

O QI CHANGE NUMBER TITLE REV DATE NOTICE DATE i

028 Documentation Review of Large Bore 1

03/06/86 Pipe Supports - Rigid 029 Reinspection Procedures for Large 3

06/27/86 Bore Pipe Supports-Non Rigid 030 Documentation Review of Large Bore 1

03/07/86 Pipe Supports-Non-Rigid 031 Reinspection of Containment Liner 2

02/21/86 1

04/24/86 and Tank Stainless Steel Liner 032 Documentation Review of Containment 2

06/27/86 Liner and Tank Stainless Steel Liners 033 Reinspection of Fuel Bailding 1

03/07/86 1

04/07/86 Fuel Fool Liners 034 Documentation Review of Fuel 2

06/27/86

()

Building Fuel Pool Liners 035 Reinspection of HVAC Duct Supports 1

03/19/86 036 Documentation Review of HVAC Duct 1

03/10/86 1

07/09/86 Supports 037 Reinspection of Pipe Supports TRT 1

03/21/86 Issues - Pipe Supports in Rm 77K, Safeguards Bids., Unit 1 I

038 RESERVED 039 Reinspection of HVAC Ducts 1

02/20/86 and Plenuss 040 Documentation Review of HVAC Ducts 1

02/20/86 1

07/23/86 and Plenues 041 Reinspection of Field Fabricated 1

01/29/86 Tanks 042 Documentation Review of Field 1

01/30/86 1

06/12/86 Fabricated Tanks O

3 0141/QI l

r e

O QI CHANGE NUMBER TITLE REV DATE NOTICE DATE 043 Reinspection of Concrete Placement 2

02/20/86 1

05/21/86 044 Documentation Review of Concrete 3

07/22/86 Placements 045 Reinspection of Structural Steel 3

06/27/86 046 Documentation Review of Structural 2

06/27/86 Steel 047 Reinspection of Small Bore Pipe 2

03/18/86 1

04/03/86 Welds / Material 048 Documentation Review of Tubing 1

05/09/86 2

06/06/86 Welds / Material 1

049 Reinspection of Large Bore 1

03/18/86 1

04/03/86 Pipe Welds / Material 050 Reinspection of Pipe Welds / Material 0

03/18/86 l

051 Reinspection of Pipe Whip Restraints 2

06/27/86 ql l

052 Documentation Review of Pipe Whip 1

02/20/86 1

06/02/86 Restraints 053 Reinspection of Category I conduit 1

02/26/86 1

06/11/86 Supports /I-S-COSF 054 Documentation Review of Category I 1

02/27/86 1

06/27/86 Conduit Supports /R-S-COSP 055 Reinspection of Instrument Pipe /

2 02/27/86 Tube Supports /I-S-INSP 056 Documentation Review of Instrument 1

02/27/86 1

06/27/86 Pipe / Tubing Supports /R-S-INSP 057 Documentation Review of Fill and 6

06/27/86 Backfill Placement 058 Reinspection of Pipe Supports-TRT 2

06/27/86 Issues - 42 Pipe Supports 059 Reinspection of Machanical Equipment 3

06/13/86 Installation 4

0141/QI

t t

O QI CHANGE NUMBER TITLE REV DATE NOTICE DATE 060 Documentation Review of Mechanical 2

06/17/86 Equipment Installation 061 Documentation Review of TRT Issues 0

11/26/85 42 Pipe Supports 062 Inspection of Non-Pressure 0

10/25/85 1

12/18/85 Boundary Welds for a Supplementary Evaluation of Visual Welding Inspection Techniques 063 Reinspection of Torque for Drilled-1 01/30/86 1

02/10/86 In Concrete Expansion Anchors (Hilti Bolts) 064 Reserved 065 Reserved l

\\

066 Reinspection of Equipment Supports 1

02/11/86 1

02/12/86 2

04/03/86 067 Documentation Review of Equipment 1

04/30/86 Supports j

068 Documentation Review of Cement Grout 3

08/06/86 i

069 Documentation Review of Epoxy Grout 1

01/29/86 1

02/24/86 2

03/18/86 3

04/14/86 070 Reinspection of Tubing Welds Material / 2 03/19/86 1

08/06/86 I-M-TUWM 071 Reinspection of Lighting cable /

1 01/28/86 I-E-LITG 072 Documentation Review of Lighting 1

01/28/86 Cable /R-E-LITG 073 Documentation Review of Pipe 0

05/16/86 1

05/22/86 Walde/ Material 074 Documentation Review of NIS Cable 0

03/10/86 Terminations /R-E-NIST 075 Reinspection of Piping Bends 0

05/02/86 ifif

%(,

Fabrication I

5 0141/QI

-