Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211Q4981999-09-10010 September 1999 Proposed Tech Specs Clarifying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits & Adding Ref to Caldon TR for LEFM ML20211G3221999-08-26026 August 1999 Proposed Tech Specs 4.0.6 Re SG Surveillance Requirements ML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20210R7091999-08-13013 August 1999 Revised Proposed Tech Specs for LAR 98-010,proposing Rev to TS Table 3.3.1-1, Rt Sys Instrumentation & TS Table B 3.3.1-1, Rt Sys Setpoints ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20209E1861999-07-0909 July 1999 Proposed Tech Specs,Adding Reactor Core Safety Limit Figures to Section 5.6.5 of Ts,Clarifying That Overpower N-16 Setpoint Remains in TS & Reflecting NRC Approval of TRs Used to Determine Core Operating Limits Presented in COLR ML20212J4251999-06-23023 June 1999 Proposed Tech Specs,Revising EDG Start Be Emergency Start Instead of Normal Start Following Loss of Offsite Power ML20195E5401999-06-0404 June 1999 Proposed Tech Specs Pages 3.2-6,3.4-24,3.4-25,3.7-23,3.7-30, 3.8-25,3.9-9,3.9-10 & 4.0-2,provided as Addl Aditorial Changes Supplementing LAR 99-001 ML20195B6461999-05-27027 May 1999 Marked-up TS Pages Re LAR 99-004,changing Plant Battery Surveillance ML20195B6771999-05-24024 May 1999 Proposed Tech Specs Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206G7111999-05-0404 May 1999 Proposed Tech Specs Revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20207F3511999-02-25025 February 1999 Fire Endurance Test to Qualify Protective Envelope for Class IE Electrical Circuits ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20198J3171998-12-21021 December 1998 Proposed Tech Specs,Proposing Changes Administratively for Unit 1 & Increasing Licensed Power for Operation of Unit 2 to 3445 Mwt ML20198J2541998-12-18018 December 1998 Proposed Tech Specs Sections 1.0,3.1,3.3,3.4,3.6,3.7,3.9 & 5.0,converting to ITS ML20198J5211998-12-17017 December 1998 Corrected Tech Specs Pages for Section 3.8 to 971211 Submittal Re TS Conversion Application ML20197K0491998-12-11011 December 1998 Proposed Tech Specs Section 3.8, Electrical Power Systems, Converting to ITS ML20196C5361998-11-20020 November 1998 Proposed TS Converting to ITS Sections 4.0,3.4 & 3.6 ML20195F1751998-11-13013 November 1998 Proposed Tech Specs,Revising Administrative Controls Section to Include Configuration Risk Mgt Program Into CPSES TS ML20195F5291998-11-11011 November 1998 Proposed Tech Specs Revising Core Safety Limit Curves & Overtemperature N-16 Reactor Trip Setpoints for Unit 2 Cycle 5 ML20196B8811998-10-30030 October 1998 Proposed Tech Specs Section 3.3 Re Instrumentation ML20154R7861998-10-21021 October 1998 Proposed Tech Specs Section 3.7, Plant Systems ML20154S2901998-10-14014 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Control,Respectively ML20154C9101998-10-0202 October 1998 Proposed Tech Specs 4.0.6, SG SR, Adding Definitions Required for F* Alternate Plugging Criterion & Identifies Portion of Tube Subject to Criteria ML20153E2661998-09-24024 September 1998 Proposed Improved Tech Specs Sections 3.4, RCS & 5.0, Administrative Controls ML20237E8461998-08-28028 August 1998 Proposed Tech Specs Pages Re Sections 1.0,2.0 & 3.0 of Proposed TS Changes in 980707 & s,In Response to NRC RAI ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20236J3131998-07-0101 July 1998 Revised Proposed Tech Specs Pages Re Safety Injection Signal & Blackout Signal ML20249C6101998-06-22022 June 1998 Proposed Tech Specs Section 3.6 Re Conversion Application ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20216E6291998-04-0909 April 1998 Marked-up TS Pages,Reflecting Proposed Changes in Amends to Licenses NPF-87 & NPF-89 ML20216B1471998-04-0606 April 1998 Proposed Tech Specs,Allowing Plant to Continue to Operate W/O Having to Perform Portions of SRs ML20217A3901998-03-18018 March 1998 Proposed Tech Specs Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power Re Enforcement Discretion ML20216H1361998-03-13013 March 1998 Proposed Tech Specs Re Electrical Systems Surveillance Requirements ML20248L3191998-03-12012 March 1998 Proposed Tech Specs TS 4.8.1.1.2f.4)b) & TS 4.8.1.1.2f.6)b) Re Request for Enforcement Discretion ML20216D6021998-03-0909 March 1998 Proposed Tech Specs Temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a),for Unit 2 Only ML20203K8621998-02-27027 February 1998 Proposed Tech Specs,Increasing RWST low-low Level Setpoint ML20203J5211998-02-25025 February 1998 Proposed Tech Specs Page to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements 4.8.1.1.2f.4(a) & 4.8.1.1.2f.7(a) Until Plant Startup Subsequent to Next Refueling Outage ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20202B1641998-02-0505 February 1998 Proposed Tech Specs Bases 3/4.7.1.5 Re Main Steam Line Isolation Valves ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212C3881997-10-24024 October 1997 Proposed Tech Specs Re Revised Core Safety Limit Curves & Revised Overtemperature N-16 Reactor Trip Setpoints 1999-09-10
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212E9811997-10-0606 October 1997 Rev 11 to CPSES Units 1 & 2 IST Plan for Pumps & Valves First Interval ML20210S3911997-09-0303 September 1997 Rev 10 to CPSES Units 1 & 2 Inservice Testing Plan for Pumps & Valves in First Interval ML20151L1391997-07-31031 July 1997 5 to Technical Requirements Manual, for Plant ML20141E6201997-06-26026 June 1997 Rev 24 of CPSES Units 1 & 2 Technical Requirements Manual ML20141F8471997-06-26026 June 1997 Rev 9 to IST Plan for Pumps & Valves First Interval ML20136G4361997-03-13013 March 1997 Rev 23 to CPSES Units 1 & 2 Technical Requirements Manual ML20135A8241997-02-24024 February 1997 Rev 22 to CPSES Units 1 & 2 Technical Requirements Manual ML20134C6831997-01-31031 January 1997 Rev 8 to Comanche Peak Steam Electric Station Units 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20134M4371996-11-13013 November 1996 Self Assessment Guide Program Guidelines ML20129A5991996-10-16016 October 1996 Rev 7 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20128G7661996-10-0202 October 1996 CPSES Unit 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20138B5181996-10-0101 October 1996 Rev 14 to ODCM for TU Electric CPSES Units 1 & 2 ML20117C8461996-07-19019 July 1996 Glen Rose,Tx ASME Section XI ISI Program Plan,Unit 1 - 1st Interval Rev 4 ML20217M1691996-05-24024 May 1996 Rev 3 to STA-750, Check Valve Reliability Program ML20117C6181996-05-0303 May 1996 Rev 1 to Unit 2 ISI Plan ML20117C6141996-04-14014 April 1996 Rev 1 to Unit 2 ISI Plan ML20107J0941996-04-0202 April 1996 Rev 1 to Interim Change Request ISI-2, CPSES Unit 2 ASME Section XI ISI Program Plan ML20107E4471996-02-0909 February 1996 Rev 1 of CPSES ASME XI ISI Program Plan Unit 2 ML20100B9471996-01-24024 January 1996 Rev 21 of CPSES Units 1 & 2 Technical Requirements Manual ML20086C5491995-06-30030 June 1995 Rev 20 to Technical Requirements Manual ML20091L1941995-03-29029 March 1995 Interim Change Request ISI-IR3-003, Unit 1 ISI Plan ML20081F1131995-03-12012 March 1995 Interim Change Request ISI-1R3-02 to Rev 3 to Unit 1 ISI Plan ML20080Q3351995-02-24024 February 1995 Rev 17 to CPSES Technical Requirements Manual ML20078R6371995-02-15015 February 1995 Rev 5 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20078H8501994-11-30030 November 1994 CPSES Odmc Rev Change Sheet ML20073L6591994-10-0606 October 1994 Rev 4 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20072C7081994-07-24024 July 1994 Rev 16 to Simulator Operations/Maint Instruction - 010, Simulator Certification Testing ML20069E5171994-05-17017 May 1994 Interim Change Request ISI-2RO-001, Comanche Peak Ses Unit 2 ISI Program Plan ML20029D0711994-05-11011 May 1994 Rev 16 to Technical Requirements Manual. ML20065K1721994-04-15015 April 1994 Rev 15 to CPSES Units 1 & 2 Technical Requirements Manual ML20058E3841993-11-30030 November 1993 Rev 14 to Technical Requirements Manual, Page 2-27, Clarifying Discussion in Table 2.1.1 Notations for Local Test Connections,Vent & Drain Valves & Revising List of Effective Pages EPL-1 Through EPL-4 ML20058C4441993-11-23023 November 1993 IST Plan for Pumps & Valves First Interval, Rev 3 ML20058B5791993-11-19019 November 1993 Rev 14 to Comanche Peak Steam Electric Station Technical Requirements Manual ML20058J9711993-11-19019 November 1993 Interim Change Request ISI-1R2-005 to Rev 2 to Unit 1 ISI Plan ML20056D8161993-08-11011 August 1993 Salp,Directive 8.6 1999-08-05
[Table view] |
Text
..
i
~
t
- ~~ ~ ~ ~
O Q.
V TITLE HOMOGEOUS DESIGN ACTIVITY VALIDATION NUMBER DAP-DI-C/S-001 Revision Prepared Date Reviewed Date Approved Date
( ) 2f20f8$
I iW %@o. "n4 -tiea Q ,/qa O
l 8610270197 861010 ('O g ,re,,i-PDR ADOCK 05000445 ' - - ' l'.s
cE./
A PDR (,,q)
}(
.~,
l TN-86-7076/DI-C/S-001 i
m TABLE OF CONTENTS Section Page CoverSheet...................................................... i Tob le o f Con t ent s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ii l.0 P U RP O S E . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I
{4 2
2.0 SCOPE..................................................... I 3.0 DEFINITIONS AND RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . 1 4.0 I NS T R U CT I O N . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 5.0 DOCUMENTATION . . ....................................... 4 b
ATTACHMENT A HOMOGENEOUS DESIGN ACTIVITY DESCRIPTION A ND V AL ID AT ION CHE C KL IST . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1 i
i TN-86-7076/DI-C/S-001 ii l
. , - . ---m- -- -. .w- , - .,#.e ,-, . . . - - - ,,9 p. -,,. _.--m7,--,.-w, -.- y--- ,,em-, y -. .. aw- ... ,,,me-.-p.-- - ,g%,wes--,,g-,--.w,
- COMANCHE PE AK RESPONSE TEAM - DESIGN ADEQUACY PROCEDURE Revision: 1 f- Number: D AP-DI-C/S-001
Title:
HOMOGENEOUS DESIGN
- ACTIVITY VALIDATION r
1.0 PURPOSE This discipline instruction provides on alternative to the format of Attachment B ,
to D AP-2'.
I 2.0 SCOPE This discipline instruction applies to the civil / structural discipline. It applies only to the format of the documentation of:
I. The examination of documents scanned
- 2. The conclusion reached by the reviewer regarding the validity of the HDA.
This discipline instruction does not conflict with the intent of any of the requirements presented in DAP-21.
3.0 DEFINITIONS AND RESPONSIBILITIES 3.1 Definitions Refer to DAP-21.
3.2 Responsibilities Refer to DAP-21.
TN-86-7076/DI-C/S-001 Page I of 4 O
5 COMANCHE PE AK RESPONSE TE AM - DESIGN ADEOUACY PROCEDURE Number: D AP-DI-C/S-001
Title:
HOMOGENEOUS DESIGN Revision: 1
(- s ACTIVITY VALIDATION 4.0 INSTRUCTION The following instructions provide more specific guidance than DAP-21 and do not eliminate any of the requirements specified under DAP-21 except for section 4.1.3. Section 4.1.3 (Preparation of Checklists) of this discipline instruction provides an alternative to Section 4.1.3 of DAP-21.
4.1.3 Preparation of Checklists A reviewer shall complete a homogeneous design activity description and validation checklist (Attachment A) to document the examination of documents scanned and the conclusion reached by the reviewer regarding the validity of the HDA. The attributes related to organization / discipline, design control process and design interfaces will be reviewed and documented at the programmatic level.
LJ Attachment A of this discipline instruction shall be completed as follows:
Page I is unchanged (except for one additional entry) from page I of Attachment B to DAP-21 and should be completed accord-ingly.
The additional entry consists of the HDA type. Three types of HDA are defined, viz., type I, type 2, and type I/2.
A number of HDAs are addressed within the body of individual structural design calculations of general topics (e.g., dead and live load calculation). Since the population of such a HDA cannot be readily identified without scanning a large number of calculations, they have been labeled as type 2. They will be addressed as checklist attributes and trocked down following the procedure described in C/S discipline instruction DAP-DI-C/5-002.
TN-86-7076/DI-C/5-001 Page 2 of 4
!O l
l
i COMANCHE PE AK RESPONSE TE AM - DESIGN ADEOUACY PROCEDURE Number: D AP-DI-C/S-001
Title:
HOMOGENEOUS DESIGN Revision: 1 ACTIVITY VALIDATION HDAs of type I have specific calculatiorn associated with them and their population con be readily identified. Their homo-geneity will be confirmed in accordance with DAP-21.
Finally, some HDAs 'cre covered under both categories (e.g.,
connections whose type cannot be identified until the cose is reviewed and at time supplemented by a special study). They have been labeled as type 1/2. The type I part of the population will be identified and scanned as per DAP-21 and the type 2 part of the population will be trocked as per DAP-DI-C/S-002.
Pages 2 ond 3 summarize the scanning process detailed on page
- 4. It should be completed as follows:
o HDA applicobility - identify the type of element (system, structure, component, etc) the HDA applies to.
o Homogeneity confirmation:
- Criteria similarity.
N Of ten, particularly for older calculations, the design criteria are not clearly or completely identified.
However, scanning of the calculation allows the reviewer to infer the applicable criterio. Advantage should be taken of this process to confirm homo-geneity. Whether observed or inferred, the criterio should be listed.
Similarity in design considerations, approach and methodology.
This similarity has to be addressed at two levels by
, the reviewer. First, are the loading considerations i and resulting design approach similar (e.g., type of loading: thermal, seismic, impact; load application:
inplane, out of plane, eccentric, etc. Second, is the design methodology similar (e.g., hard code, com-poter, workup stress, ultimate strength, etc.)?
TN-86-7076/DI-C/5-001 Page 3 of 4 1
, COMANCHE PEAK RESPONSE TEAM - DESIGN ADEOUACY PROCEDURE Number: DAP-DI-C/S-001
Title:
HOMOGENEOUS DESIGN Revision: 1 O ACTIVITY VALIDATION t
Comment / summary entry should contain any ad-ditional rationale followed by the review to deter-mine the applicability /inopplicability of the HDA and the selection of the review candidate calcula-tions.
Scanning summary Document the breadth of the scanning process.
- Sign off.
5.0 DOCUMENTATION Refer to DAP-21.
b t
O
.l l
TN-86-7076/DI-C/S-001 Page 4 of 4
4 I
ATTACHMENT A Oq HOMO PEOUS DESIGN ACTIVITY DESCRIPTION APO VALIDATION CifCKLIST HDA TYPE DAP Discipline HDA NO.
HDA Title Org./ Discipline (as applicable)
Applicable Design Category Description of HDA O
("X" if applicable)
Based on few design activities involved, will review all items in homogeneous design activity.
Homogeneous design activity applies only to o unique component or unique document.
Describe basis for conclusion, if either of the above are applicable, do not complete except for signing the last sheet 3.
O DAP FORM DI-C/S-001-1 A-1
i 1
HOMOEEOUS DESIGN ACTIVITY CHECKLIST
(
- l. HDA Applicability (check one)
System Structure Component Topic / Issue Other Specify
- 2. Homogeneity Confirmation a) Similarity in Criteria Yes No I) Calculations specify common criteria? _ _
- 2) Common criterio not specified, calculations appear to conform to -
common criteria? _ _
- 3) Combination of items I & 2 above. - _
- 4) List common observed / inferred criteria Do the sampled cales appear to meet the similarity in criterio
[ requirement?
Yes No If no, further divide HDA as per instruction in DAP-21/DAP-DI-C/S-001.
b) Similarity in Design Considerations, Approach and Methodology Yes No i
l) Similarity in loading considerations
- 2) Methodology matrix (check as required):
Calculational Analysis Material Method Method Complexity Structural -
Ult.
Steel _ Hand Colcs - Strength _ Determinate Reinforced Computer Working -
Concrete _ Colcs Stress _ indeterminate 1
Composite Combination V Other (specify)
DAP FORM Dl-C/S-001-2 A-2 l . . .
4
)
O HOMOGEbEOUS DESIGN ACTIVITY CFECKLIST (Cont'd)
Do the sampled cale's appear to follow similar design considerations, approach and methodology?
Yes No If no, further divide HDA as per instruction in DAP-21/DAP-DI-C/S-001.
- 3. Comments / Summary
- 4. Scanning Summary
- c. No. of calculations in HDA
- b. No. of calculations scanned
- c. No. of calculations with review status (1)
- d. No. of calculations with review status (5)
- 5. Sign of f a) Prepared by: Date b) Approved by: _ Date i
l l
i O
DAP FORM DI-C/S-001-3 A-3 i
l t
s 1
O HDA CALCULATION SCArellNG RECORD
- HDA NO. HDA TITLE Reviewer Date NO. CALC. NO. REV TITLE / REVIEW SET COMMENT /
DESCRIPTION STATUS *
USE ADDITIONAL PAGES AS NECESSARY.
REVIEW STATUS (1) CALC SCAN CONFIRMS HDA HOMOCENEITY 1 (2) TRANSFER TO ANOTHER HDA (3) CALC CONTENT INSUFFICIENT TO ,
ACCESS HDA CRITERIA (4) OTHER (EXPLAIN) (5) CANDIDATE FOR REVIEW.
DAP FORM DI-C/S-001-4 A-4
_ _ _ _ _ - _ _ _ _ , - _ _ _ _ _ _ - -- -- - - - - - - - - - - - - - - - - - - - - - - - - - - - ~ ~ ~ ' - ~ ' ~ ~ ~ ' ~ ~ ~ ~