| number = ML23095A085
| number = ML23095A085
| issue date = 04/06/2023
| issue date = 04/06/2023
| title = Triennial Fire Protection Inspection Report 05000341/2023011
| title = Triennial Fire Protection Inspection Report 05000341/2023011
| author name = Gilliam J
| author name = Gilliam J
| author affiliation = NRC/RGN-III/DORS/EB2
| author affiliation = NRC/RGN-III/DORS/EB2
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:April 6, 2023
{{#Wiki_filter:==SUBJECT:==
 
==SUBJECT:==
FERMI POWER PLANT, UNIT 2 - TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000341/2023011
FERMI POWER PLANT, UNIT 2 - TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000341/2023011


Line 31: Line 29:
consistent with Section 2.3.2 of the Enforcement Policy.
consistent with Section 2.3.2 of the Enforcement Policy.


If you contest the violation or the significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement; and the NRC Resident Inspector at Fermi Power Plant, Unit 2. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
If you contest the violation or the significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement; and the NRC Resident Inspector at Fermi Power Plant, Unit 2.April 6, 2023 This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.


Sincerely, Signed by Gilliam, Jasmine on 04/06/23 Jasmine A. Gilliam, Acting Branch Chief Engineering Branch 2 Division of Operating Reactor Safety Docket No. 05000341 License No. NPF-43
Sincerely, Jasmine A. Gilliam, Acting Branch Chief Engineering Branch 2 Division of Operating Reactor Safety Docket No. 05000341 License No. NPF-43


===Enclosure:===
===Enclosure:===
As stated
As stated  


==Inspection Report==
==Inspection Report==
Docket Number: 05000341 License Number: NPF-43 Report Number: 05000341/2023011 Enterprise Identifier: I-2023-011-0026 Licensee: DTE Electric Company Facility: Fermi Power Plant, Unit 2 Location: Newport, MI Inspection Dates: February 13, 2023 to March 09, 2023 Inspectors: M. Abuhamdan, Reactor Inspector M. Gangewere, Reactor Inspector I. Hafeez, Senior Reactor Inspector Approved By: Jasmine A. Gilliam, Acting Branch Chief Engineering Branch 2 Division of Operating Reactor Safety Enclosure
Docket Number: 05000341
 
License Number: NPF-43
 
Report Number: 05000341/2023011
 
Enterprise Identifier: I-2023-011-0026
 
Licensee: DTE Electric Company
 
Facility: Fermi Power Plant, Unit 2
 
Location: Newport, MI
 
Inspection Dates: February 13, 2023 to March 09, 2023
 
Inspectors: M. Abuhamdan, Reactor Inspector M. Gangewere, Reactor Inspector I. Hafeez, Senior Reactor Inspector
 
Approved By: Jasmine A. Gilliam, Acting Branch Chief Engineering Branch 2 Division of Operating Reactor Safety
 
Enclosure


=SUMMARY=
=SUMMARY=
Line 45: Line 63:


===List of Findings and Violations===
===List of Findings and Violations===
No findings or violations of more than minor significance were identified.
No findings or violations of more than minor significance were identified.


Line 56: Line 73:


==REACTOR SAFETY==
==REACTOR SAFETY==
===71111.21N.05 - Fire Protection Team Inspection (FPTI)


===71111.21N.05 - Fire Protection Team Inspection (FPTI) Structures, Systems, and Components (SSCs) Credited for Fire Prevention, Detection, Suppression, or Post-Fire Safe Shutdown Review (IP Section 03.01) ===
Structures, Systems, and Components (SSCs) Credited for Fire Prevention, Detection, Suppression, or Post-Fire Safe Shutdown Review (IP Section 03.01)===
{{IP sample|IP=IP 71111.21|count=4}}
{{IP sample|IP=IP 71111.21|count=4}}
The inspectors verified that components and/or systems will function as required to support the credited functions stated for each sample. Additional inspection considerations are located in the fire hazards analysis (FHA) or safe shutdown analysis (SSA).
The inspectors verified that components and/or systems will function as required to support the credited functions stated for each sample. Additional inspection considerations are located in the fire hazards analysis (FHA) or safe shutdown analysis (SSA).
Line 71: Line 89:
===Fire Protection Program Changes/Modifications (IP Section 03.03) (3 Samples)===
===Fire Protection Program Changes/Modifications (IP Section 03.03) (3 Samples)===
The inspectors verified the following:
The inspectors verified the following:
a. Changes to the approved FPP do not constitute an adverse effect on the ability to safely shutdown.
a. Changes to the approved FPP do not constitute an adverse effect on the ability to safely shutdown.


b. The adequacy of the design modification, if applicable.
b. The adequacy of the design modification, if applicable.


c. Assumptions and performance capability stated in the SSA have not been degraded through changes or modifications.
c.
 
Assumptions and performance capability stated in the SSA have not been degraded through changes or modifications.


d. The FPP documents, such as the Updated Final Safety Analysis Report, fire protection report, FHA, and SSA were updated consistent with the FPP or design change.
d. The FPP documents, such as the Updated Final Safety Analysis Report, fire protection report, FHA, and SSA were updated consistent with the FPP or design change.
Line 85: Line 106:


==INSPECTION RESULTS==
==INSPECTION RESULTS==
Licensee-Identified Non-Cited Violation                                               71111.21N.05 This violation of very low safety significance was identified by the licensee and has been entered into the licensee corrective action program and is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.
Licensee-Identified Non-Cited Violation 71111.21N.05 This violation of very low safety significance was identified by the licensee and has been entered into the licensee corrective action program and is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.


Violation: Technical Specification Section 5.4.1.a states, in part, that written procedures shall be established, implemented, and maintained covering the applicable procedures recommended in Regulatory Guide 1.33, Revision 2, Appendix A, February 1978. NRC Regulatory Guide 1.33, Appendix A, Section 8 addresses Procedures for Control of Measuring and Test Equipment and for Surveillance Test, Procedures, and Calibration. Section 8 b 1 (h), further specifies, in part, that fire protection system functional test inspection procedures should be written for each surveillance, test, inspection, or calibration listed in the technical specifications. TRSM Section 3.12.2.13 Surveillance Requirements, requires the licensee to verify that each fire pump develops a minimum calculated value of 2500 gpm at 150 psig at the discharge flange of the pump adjusted for the minimum allowed lake level of 562-0.
Violation: Technical Specification Section 5.4.1.a states, in part, that written procedures shall be established, implemented, and maintained covering the applicable procedures recommended in Regulatory Guide 1.33, Revision 2, Appendix A, February 1978. NRC Regulatory Guide 1.33, Appendix A, Section 8 addresses Procedures for Control of Measuring and Test Equipment and for Surveillance Test, Procedures, and Calibration. Section 8 b 1 (h), further specifies, in part, that fire protection system functional test inspection procedures should be written for each surveillance, test, inspection, or calibration listed in the technical specifications. TRSM Section 3.12.2.13 Surveillance Requirements, requires the licensee to verify that each fire pump develops a minimum calculated value of 2500 gpm at 150 psig at the discharge flange of the pump adjusted for the minimum allowed lake level of 562-0.
Line 93: Line 114:
Significance/Severity: Green.
Significance/Severity: Green.


Corrective Action References: CARD 23-21712 (2023 NRC Fire Protection Inspection identified- Past Fire Water Pump Performance)
Corrective Action References: CARD 23-21712 (2023 NRC Fire Protection Inspection identified-Past Fire Water Pump Performance)


==EXIT MEETINGS AND DEBRIEFS==
==EXIT MEETINGS AND DEBRIEFS==
Line 102: Line 123:
=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


Inspection   Type             Designation   Description or Title                                     Revision or
Inspection Type Designation Description or Title Revision or
Procedure                                                                                             Date
Procedure Date
71111.21N.05 Calculations     DC-4921       I
71111.21N.05 Calculations DC-4921 I
: [[contact::I. Conclusions]], Summary of Results, A. Appendix R       I
: [[contact::I. Conclusions]], Summary of Results, A. Appendix R I
Compliance-05RBN and -05RBS
Compliance-05RBN and -05RBS
DC-4921 Vol 1 Appendix R Calculations                                 Rev.1
DC-4921 Vol 1 Appendix R Calculations Rev.1
Book 2 of 3
Book 2 of 3
DC-4921 Vol1 Appendix R Calculations                                 Rev.1
DC-4921 Vol1 Appendix R Calculations Rev.1
Book 3 of 3
Book 3 of 3
DC-5702 Vol I Fire Loading Calculation                                 H and M
DC-5702 Vol I Fire Loading Calculation H and M
DC-5713 Vol I Attachment 2                                             D
DC-5713 Vol I Attachment 2 D
DC-5713 Vol I System 29 - RHR: EDG11 Fuel Oil Tank Room               F
DC-5713 Vol I System 29 - RHR: EDG11 Fuel Oil Tank Room F
DC-5713 Vol I Hydraulic Evaluation of the Upgraded Fire Distribution   F
DC-5713 Vol I Hydraulic Evaluation of the Upgraded Fire Distribution F
Loop
Loop
DC-6 119     Appendix R Database                                     Rev.E
DC-6 119 Appendix R Database Rev.E
DC-6197       Reactor Coolant System Response Analyses to Support     C
DC-6197 Reactor Coolant System Response Analyses to Support C
10CFR50 Appendix R Compliance
10CFR50 Appendix R Compliance
DC-6483       Appendix R Protective Device Coordination Calculation   Rev.0
DC-6483 Appendix R Protective Device Coordination Calculation Rev.0
DC-6483       Appendix R Protective Device Coordination Calculation   Rev.0
DC-6483 Appendix R Protective Device Coordination Calculation Rev.0
Calibration       DC-4921 VOL 1 Appendix R Calculations                                 Rev.1
Calibration DC-4921 VOL 1 Appendix R Calculations Rev.1
Records           Book 1 of 3
Records Book 1 of 3
Corrective Action 21-21167     Alternate Diesel Fire Pump Flow Concern                 02/07/2021
Corrective Action 21-21167 Alternate Diesel Fire Pump Flow Concern 02/07/2021
Documents         22-31216     NQA - Notice of First Level Issue Escalation - Continued 11/17/2022
Documents 22-31216 NQA - Notice of First Level Issue Escalation - Continued 11/17/2022
Violations in Station Standards Regarding Fire
Violations in Station Standards Regarding Fire
Hazards
Hazards
98-12365     UFSAR/TRM Surveillance Requirements for Fire             04/01/1998
98-12365 UFSAR/TRM Surveillance Requirements for Fire 04/01/1998
Suppression System Should Be Based on System
Suppression System Should Be Based on System
Requirements
Requirements
CARD - 21-   Technical Specification 5.4.1.d States That Written     08/10/2021
CARD - 21-Technical Specification 5.4.1.d States That Written 08/10/2021
27023         Procedures Shall Be Established, Implemented, and
27023 Procedures Shall Be Established, Implemented, and
Maintained Covering Fire Protection Program
Maintained Covering Fire Protection Program
Implementation
Implementation
71111.21N.05 Corrective Action CARD 21-21167 Organizational Effectiveness Cause Evaluation           Rev.2
71111.21N.05 Corrective Action CARD 21-21167 Organizational Effectiveness Cause Evaluation Rev.2
Documents         CARD-19-26148 28.507.05 Does Not Meet Requirements of TRSR 3.12.8.7   08/15/2019
Documents CARD-19-26148 28.507.05 Does Not Meet Requirements of TRSR 3.12.8.7 08/15/2019
for 10% of Seal Type per Survey Group
for 10% of Seal Type per Survey Group
Inspection Type             Designation       Description or Title                                     Revision or
Inspection Type Designation Description or Title Revision or
Procedure                                                                                                 Date
Procedure Date
CARD-20-24081     Procedure Not Properly Revised                           04/08/2020
CARD-20-24081 Procedure Not Properly Revised 04/08/2020
Investigation into CARD - 21-21583                                           02/18/2021
Investigation into CARD - 21-21583 02/18/2021
TRSR 3.12.2.13
TRSR 3.12.2.13
Corrective Action 23-21122           2023 NRC Fire Protection Inspection: Previous UFSAR       02/09/2023
Corrective Action 23-21122 2023 NRC Fire Protection Inspection: Previous UFSAR 02/09/2023
Documents                           Section Submitted to NRC
Documents Section Submitted to NRC
Resulting from   23-21147           NRC Identified: Door R3-12 Latch Does Not Engage         02/10/2023
Resulting from 23-21147 NRC Identified: Door R3-12 Latch Does Not Engage 02/10/2023
Inspection       23-21237           2023 NRC Fire Protection Inspection - NRC Identified -   02/14/2023
Inspection 23-21237 2023 NRC Fire Protection Inspection - NRC Identified - 02/14/2023
Cracks in the Dedicated Shutdown Panel Pedestal
Cracks in the Dedicated Shutdown Panel Pedestal
23-21238           2023 NRC Fire Protection Inspection NRC Identified       02/14/2023
23-21238 2023 NRC Fire Protection Inspection NRC Identified 02/14/2023
Housekeeping Issue
Housekeeping Issue
23-21251           2023 NRC Fire Protection Inspection - NRC Identified-     02/25/2023
23-21251 2023 NRC Fire Protection Inspection - NRC Identified- 02/25/2023
Cart Not Adequately Restrained
Cart Not Adequately Restrained
23-21274           2023 NRC Fire Protection Inspection: BOP Fire Door RA2-   02/15/2023
23-21274 2023 NRC Fire Protection Inspection: BOP Fire Door RA2- 02/15/2023
Not Latching
Not Latching
23-21276           2023 NRC Fire Protection Inspection - CTG11-2 Door Not   02/15/2023
23-21276 2023 NRC Fire Protection Inspection - CTG11-2 Door Not 02/15/2023
Latching
Latching
23-21277           2023 NRC Fire Protection Inspection - NRC Identified -   02/15/2023
23-21277 2023 NRC Fire Protection Inspection - NRC Identified - 02/15/2023
CTG11-2 Panel Seam Cover Loose
CTG11-2 Panel Seam Cover Loose
23-21278           2023 NRC Fire Protection Inspection - NRC Identified -   02/15/2023
23-21278 2023 NRC Fire Protection Inspection - NRC Identified - 02/15/2023
CTG11-3 Exhaust Panel Loose
CTG11-3 Exhaust Panel Loose
23-21282           2023 NRC Fire Protection Inspection - NRC Identified -   02/15/2023
23-21282 2023 NRC Fire Protection Inspection - NRC Identified - 02/15/2023
CTG11 CO2 System Auxiliary Relief Valve
CTG11 CO2 System Auxiliary Relief Valve
Leaking
Leaking
23-21284           2023 NRC Fire Protection Inspection - NRC Identified -   02/15/2023
23-21284 2023 NRC Fire Protection Inspection - NRC Identified - 02/15/2023
R2103S007 SBO 125VDC Battery Charger AC
R2103S007 SBO 125VDC Battery Charger AC
Indicator Light is Flashing
Indicator Light is Flashing
23-21287           2023 NRC Fire Protection Inspection: Investigate If Carts 02/15/2023
23-21287 2023 NRC Fire Protection Inspection: Investigate If Carts 02/15/2023
in Relay Room Are Approved per MOP23
in Relay Room Are Approved per MOP23
23-21289           2023 NRC Fire Protection Inspection - NRC Identified:     02/15/2023
23-21289 2023 NRC Fire Protection Inspection - NRC Identified: 02/15/2023
Halon Bottle Strap Bolts Need Tightening
Halon Bottle Strap Bolts Need Tightening
23-21290           2023 NRC Fire Protection Inspection - NRC Identified:     02/15/2023
23-21290 2023 NRC Fire Protection Inspection - NRC Identified: 02/15/2023
Housekeeping and Storage Issues in BOP
Housekeeping and Storage Issues in BOP
Switchgear Room
Switchgear Room
23-21355           2023 NRC Fire Protection Inspection: Performed           02/17/2023
23-21355 2023 NRC Fire Protection Inspection: Performed 02/17/2023
Inspection Type Designation Description or Title                                     Revision or
Inspection Type Designation Description or Title Revision or
Procedure                                                                           Date
Procedure Date
Surveillance Document Backlog
Surveillance Document Backlog
23-21368   2023 NRC Fire Protection Inspection: Enhancement         02/14/2023
23-21368 2023 NRC Fire Protection Inspection: Enhancement 02/14/2023
Evaluation for Computer Room Ceiling Tiles and Halon
Evaluation for Computer Room Ceiling Tiles and Halon
System
System
23-21415   2023 NRC Fire Protection Inspection - NRC Identified:   02/20/2023
23-21415 2023 NRC Fire Protection Inspection - NRC Identified: 02/20/2023
Potential Hydrogen Accumulation Concern
Potential Hydrogen Accumulation Concern
23-21419   2023 NRC Fire Protection Inspection: FP37, "Perform     02/20/2023
23-21419 2023 NRC Fire Protection Inspection: FP37, "Perform 02/20/2023
28.507.02 Fire Barrier Inspection (Mode 1,2,3) - License
28.507.02 Fire Barrier Inspection (Mode 1,2,3) - License
Renewal" Requires Full Completion
Renewal" Requires Full Completion
23-21431   23.324.01 Procedure Enhancement                         02/21/2023
23-21431 23.324.01 Procedure Enhancement 02/21/2023
23-21459   2023 NRC Fire Protection Inspection - Evaluation for     02/21/2023
23-21459 2023 NRC Fire Protection Inspection - Evaluation for 02/21/2023
MOP11 Transient Control Needed
MOP11 Transient Control Needed
23-21504   2023 NRC Fire Protection Inspection- NRC Identified,     02/22/2023
23-21504 2023 NRC Fire Protection Inspection-NRC Identified, 02/22/2023
Discussion on Seal Inspection Procedure 28.507.05
Discussion on Seal Inspection Procedure 28.507.05
C and How Were Meeting 10% Every
C and How Were Meeting 10% Every
Months
Months
23-21505   2023 NRC Fire Protection Inspection - NRC Identified,   02/22/2023
23-21505 2023 NRC Fire Protection Inspection - NRC Identified, 02/22/2023
Regarding the Note About M.05 20% every 18 Months
Regarding the Note About M.05 20% every 18 Months
23-21515   2023 NRC Fire Protection Inspection - Evaluate If Hot   02/22/2023
23-21515 2023 NRC Fire Protection Inspection - Evaluate If Hot 02/22/2023
Work Audit SPF Should Provide More Information
Work Audit SPF Should Provide More Information
23-21549   2023 NRC Fire Protection Inspection: DFP Room           02/23/2023
23-21549 2023 NRC Fire Protection Inspection: DFP Room 02/23/2023
Sprinkler System Enhancement FPEE
Sprinkler System Enhancement FPEE
23-21558   2023 NRC Fire Protection Inspection: NRC Identified:     02/23/2023
23-21558 2023 NRC Fire Protection Inspection: NRC Identified: 02/23/2023
Acceptance Criteria (Step 7.1) Not Signed
Acceptance Criteria (Step 7.1) Not Signed
23-21624   2023 NRC Fire Protection Inspection: Enhancement         02/27/2023
23-21624 2023 NRC Fire Protection Inspection: Enhancement 02/27/2023
Procedure 28.507.05 Rev 23 Step 5.1.1
Procedure 28.507.05 Rev 23 Step 5.1.1
23-21667   2023 NRC Fire Protection Inspection: Enhancement to     02/28/2023
23-21667 2023 NRC Fire Protection Inspection: Enhancement to 02/28/2023
Detector Sensitivity Surveillance
Detector Sensitivity Surveillance
23-21712   2023 NRC Fire Protection Inspection: NRC Identified -   03/01/2023
23-21712 2023 NRC Fire Protection Inspection: NRC Identified - 03/01/2023
Past Fire Water Pump Performance
Past Fire Water Pump Performance
23-21713   2023 NRC Fire Protection Inspection: NRC Identified -   03/01/2023
23-21713 2023 NRC Fire Protection Inspection: NRC Identified - 03/01/2023
Documentation Supporting MGA03 Adherence
Documentation Supporting MGA03 Adherence
23-21715   2023 NRC Fire Protection Inspection: NRC Identified -   03/01/2023
23-21715 2023 NRC Fire Protection Inspection: NRC Identified - 03/01/2023
Higher Than Expected Jockey Fire Pump Discharge
Higher Than Expected Jockey Fire Pump Discharge
Inspection Type     Designation   Description or Title                                   Revision or
Inspection Type Designation Description or Title Revision or
Procedure                                                                                 Date
Procedure Date
Pressure
Pressure
23-21760       2023 NRC Fire Protection Inspection: NRC Identified -   03/02/2023
23-21760 2023 NRC Fire Protection Inspection: NRC Identified - 03/02/2023
Fire Wrap External Surfaces Inspection Guidance
Fire Wrap External Surfaces Inspection Guidance
23-21768       2023 NRC Fire Protection Inspection: EDP-80165 DFP     03/02/2023
23-21768 2023 NRC Fire Protection Inspection: EDP-80165 DFP 03/02/2023
Sprinkler Head Adjusted and FP Program Impact
Sprinkler Head Adjusted and FP Program Impact
23-21803       2023 NRC Fire Protection Inspection: TSR-36993 Not     03/04/2023
23-21803 2023 NRC Fire Protection Inspection: TSR-36993 Not 03/04/2023
Incorporated into DC-5702Rev H
Incorporated into DC-5702Rev H
23-21822       2023 NRC Fire Protection Inspection: Recommended       03/06/2023
23-21822 2023 NRC Fire Protection Inspection: Recommended 03/06/2023
Enhancement to MWC10Fire Wrap Guidance
Enhancement to MWC10Fire Wrap Guidance
23-21883       2023 NRC Fire Protection Inspection - NRC Identified - 03/07/2023
23-21883 2023 NRC Fire Protection Inspection - NRC Identified - 03/07/2023
Observation on Documentation Quality
Observation on Documentation Quality
23-21885       2023 NRC Fire Protection Inspection: Recommended       03/07/2023
23-21885 2023 NRC Fire Protection Inspection: Recommended 03/07/2023
KT&R Enhancement
KT&R Enhancement
23-21889       2023 NRC Fire Protection Inspection: NRC Identified-   03/07/2023
23-21889 2023 NRC Fire Protection Inspection: NRC Identified- 03/07/2023
Generate a FPEE for the RB1 and RB2 Combustible
Generate a FPEE for the RB1 and RB2 Combustible
Exclusion Zones
Exclusion Zones
23-21896       2023 NRC Fire Protection Inspection - NRC Identified - 03/08/2023
23-21896 2023 NRC Fire Protection Inspection - NRC Identified - 03/08/2023
Observation on Procedure Adherence
Observation on Procedure Adherence
23-21947       2023 FPTI - NRC Observation on RFI Responsed           03/09/2023
23-21947 2023 FPTI - NRC Observation on RFI Responsed 03/09/2023
Drawings 61721-2482-02 Wiring Diagram Electric Fire Pump Controller General   Rev.1
Drawings 61721-2482-02 Wiring Diagram Electric Fire Pump Controller General Rev.1
Service Water Pump HSE
Service Water Pump HSE
61721S-2481-02 Schematic Diagram Electric Fire Pump General Service   Rev.N
61721S-2481-02 Schematic Diagram Electric Fire Pump General Service Rev.N
Water Pump HSE
Water Pump HSE
61721S-2481-02 Schematic Diagram Electric Fire Pump General Service   Rev.N
61721S-2481-02 Schematic Diagram Electric Fire Pump General Service Rev.N
Water Pump HSE
Water Pump HSE
61721S-2481-   Schematic Diagram Diesel Fore Pump P8000C001           Rev.0
61721S-2481-Schematic Diagram Diesel Fore Pump P8000C001 Rev.0
03A
03A
61721S-2481-   Wiring Diagram Diesel Fire Pump Driver Connection       Rev.0
61721S-2481-Wiring Diagram Diesel Fire Pump Driver Connection Rev.0
03E
03E
6I721-2002-04 Auxiliary Building Relay Room Equipment Layout FIN. FL. T
6I721-2002-04 Auxiliary Building Relay Room Equipment Layout FIN. FL. T
EL. 613'-6"
EL. 613'-6"
6I721-2041-09 Internal-External Wiring Diagram Termination Cab.       V
6I721-2041-09 Internal-External Wiring Diagram Termination Cab. V
H11P861 Part 1
H11P861 Part 1
6I721-2041-10 Internal-External Wiring Diagram Termination Cab.       P
6I721-2041-10 Internal-External Wiring Diagram Termination Cab. P
Inspection Type Designation     Description or Title                                       Revision or
Inspection Type Designation Description or Title Revision or
Procedure                                                                                   Date
Procedure Date
H11P861 Part II
H11P861 Part II
6I721-2051-48   Wiring Diagram Termination Cabinet H11P889 Part 1         S
6I721-2051-48 Wiring Diagram Termination Cabinet H11P889 Part 1 S
6I721-2051-49   Wiring Diagram Termination Cabinet H11-P889 Part 2         O
6I721-2051-49 Wiring Diagram Termination Cabinet H11-P889 Part 2 O
6I721-2882-3     Instrument & Control Equipment Radwaste Building           F
6I721-2882-3 Instrument & Control Equipment Radwaste Building F
Second Floor EL 613'-6"
Second Floor EL 613'-6"
6M721-2135       Diagram Fire Protection System (Sheet 1)                   BC
6M721-2135 Diagram Fire Protection System (Sheet 1) BC
6M721-2135-1     Diagram Fire Protection System (Sheet 2)                   Rev.BN
6M721-2135-1 Diagram Fire Protection System (Sheet 2) Rev.BN
6M721-5072       Fire Protection Plan Cable Tray Area at Elevations 551'-6" K
6M721-5072 Fire Protection Plan Cable Tray Area at Elevations 551'-6" K
                                & 562'-6" Auxiliary Building
& 562'-6" Auxiliary Building
6M721-5076       Fire Protection Plan Cable Tray Area at Elevation 562'-6" E
6M721-5076 Fire Protection Plan Cable Tray Area at Elevation 562'-6" E
Aux. Building
Aux. Building
6M721A-2025     Fire Protection Plan Diesel Engine Fire Pump Room         D
6M721A-2025 Fire Protection Plan Diesel Engine Fire Pump Room D
General Service Water Pumphouse
General Service Water Pumphouse
6SD721-2500-01   One Line Diagram Plant 4160V & 480V System Service         Rev.CN
6SD721-2500-01 One Line Diagram Plant 4160V & 480V System Service Rev.CN
6SD721-2500-01   One Line Diagram Plant 4160V & 480V System Service         12/09/2022
6SD721-2500-01 One Line Diagram Plant 4160V & 480V System Service 12/09/2022
2           Fire Protection Evaluation Reactor and Auxiliary Buildings P
2 Fire Protection Evaluation Reactor and Auxiliary Buildings P
Basement - Plan - EL. 562'-0"
Basement - Plan - EL. 562'-0"
A-2403           Fire Protection Evaluation Reactor and Auxiliary Buildings T
A-2403 Fire Protection Evaluation Reactor and Auxiliary Buildings T
First Floor - Plan - El. 583'-6"
First Floor - Plan - El. 583'-6"
A-2405           Fire Protection Evaluation Reactor and Auxiliary Buildings Y
A-2405 Fire Protection Evaluation Reactor and Auxiliary Buildings Y
Second Floor - Plan - EL. 613'-6"
Second Floor - Plan - EL. 613'-6"
A-2407           Fire Protection Evaluation Reactor and Auxiliary Buildings T
A-2407 Fire Protection Evaluation Reactor and Auxiliary Buildings T
Third Floor - Plan - EL. 641'-6" and 643'-6"
Third Floor - Plan - EL. 641'-6" and 643'-6"
A-2408           Fire Protection Evaluation Reactor and Auxiliary Buildings U
A-2408 Fire Protection Evaluation Reactor and Auxiliary Buildings U
Fourth Floor - Plan - EL. 659'-6"
Fourth Floor - Plan - EL. 659'-6"
A-2409           Fire Protection Evaluation Reactor and Auxiliary Buildings V
A-2409 Fire Protection Evaluation Reactor and Auxiliary Buildings V
Fifth Floor - Plan - EL. 677'-6" and 684'-6"
Fifth Floor - Plan - EL. 677'-6" and 684'-6"
A-4359           Battery Charg R DV1 F R-A B 643-6                         C
A-4359 Battery Charg R DV1 F R-A B 643-6 C
E0102           Fire Seal Electrical Penetration Multiple Trays - Floor   4
E0102 Fire Seal Electrical Penetration Multiple Trays - Floor 4
M-S-2025         Document Revised under EDP-80165.053 for Water Fire       0
M-S-2025 Document Revised under EDP-80165.053 for Water Fire 0
Protection
Protection
Piping Isometric 6M721-4526-1                                               N
Piping Isometric 6M721-4526-1 N
Fire Protection
Fire Protection
Sprinkler Feed
Sprinkler Feed
Inspection Type       Designation   Description or Title                                     Revision or
Inspection Type Designation Description or Title Revision or
Procedure                                                                                       Date
Procedure Date
System Reactor
System Reactor
and Auxiliary
and Auxiliary
Bldgs
Bldgs
Engineering 3071-198       Wall and Floor Penetration Seals and Fire Stops           I
Engineering 3071-198 Wall and Floor Penetration Seals and Fire Stops I
Changes     EDP 80165     Fermi 2 Diesel Driven Fire Pump Replacement               0
Changes EDP 80165 Fermi 2 Diesel Driven Fire Pump Replacement 0
Modification
Modification
EDP-1558       Spray Shields for MCCs and EECW Pump Motors               A
EDP-1558 Spray Shields for MCCs and EECW Pump Motors A
EDP80165       Fermi 2 Diesel Driven Fire Pump Replacement               Rev.0
EDP80165 Fermi 2 Diesel Driven Fire Pump Replacement Rev.0
Modification
Modification
FCR 80165-8   Fermi 2 Diesel Driven Fire Pump Replacement               0
FCR 80165-8 Fermi 2 Diesel Driven Fire Pump Replacement 0
Modification
Modification
TSR 38095     EF2 Impacts of GNF3 New Fuel Introduction                 0
TSR 38095 EF2 Impacts of GNF3 New Fuel Introduction 0
TSR-36993     Documentation of Permanent Plant Shielding Along RB1     0
TSR-36993 Documentation of Permanent Plant Shielding Along RB1 0
West Wall Between Columns A-11 and A-12
West Wall Between Columns A-11 and A-12
Engineering EVAL DE0035 01 Evaluation of Fermi 2 Wet Pipe Sprinkler Systems for     A
Engineering EVAL DE0035 01 Evaluation of Fermi 2 Wet Pipe Sprinkler Systems for A
Evaluations               Compliance with the Requirements of NFPA-13, Standard
Evaluations Compliance with the Requirements of NFPA-13, Standard
for the Installation of Sprinkler Systems
for the Installation of Sprinkler Systems
EVAL-DE-0035- Evaluation of Fermi 2 Automatic Fire Detection Systems   0
EVAL-DE-0035-Evaluation of Fermi 2 Automatic Fire Detection Systems 0
for Compliance with the Requirements of NFPA-72E
for Compliance with the Requirements of NFPA-72E
                                      (Standard for Automatic Fire Detectors), and NFPA 72D
(Standard for Automatic Fire Detectors), and NFPA 72D
                                      (Standard for Proprietary Protective Signaling Systems)
(Standard for Proprietary Protective Signaling Systems)
EVAL-DE0027-   Evaluation of Fermi 2 Wet Pipe Sprinkler Systems for     0
EVAL-DE0027-Evaluation of Fermi 2 Wet Pipe Sprinkler Systems for 0
Compliance with the Requirements of NFPA-13 Standard
Compliance with the Requirements of NFPA-13 Standard
for the Installation of Sprinkler Systems
for the Installation of Sprinkler Systems
EVAL-DE0035-   Evaluation of Fermi 2 Wet Pipe Sprinkler Systems for     0
EVAL-DE0035-Evaluation of Fermi 2 Wet Pipe Sprinkler Systems for 0
Compliance with the Requirements of NFPA-13, Standard
Compliance with the Requirements of NFPA-13, Standard
for the Installation of Sprinkler Systems
for the Installation of Sprinkler Systems
FPEE-02-0020   Update of FPEE-02-0020 for Spatial and Failure History of 1
FPEE-02-0020 Update of FPEE-02-0020 for Spatial and Failure History of 1
Steam Tunnel Seals
Steam Tunnel Seals
FPEE-05-0020   NFPA 13-1980 Noncompliances for Several Sprinkler         2
FPEE-05-0020 NFPA 13-1980 Noncompliances for Several Sprinkler 2
Systems
Systems
FPEE-09-0004   Requirements for Temporary Intervening Combustibles in   0
FPEE-09-0004 Requirements for Temporary Intervening Combustibles in 0
Modes 1, 2,& 3
Modes 1, 2,& 3
FPEE-09-0042   Acceptability of Fire Detector Spacing & Location         0
FPEE-09-0042 Acceptability of Fire Detector Spacing & Location 0
Inspection Type         Designation     Description or Title                                       Revision or
Inspection Type Designation Description or Title Revision or
Procedure                                                                                           Date
Procedure Date
Non-Conformance for Detection Zone 4
Non-Conformance for Detection Zone 4
FPEE-20-0005   Evaluation of OK-480/0K-470 Metal Tray Cover Not           Rev.0
FPEE-20-0005 Evaluation of OK-480/0K-470 Metal Tray Cover Not Rev.0
Installed and Impact on Safe Shutdown CARD 20-25829
Installed and Impact on Safe Shutdown CARD 20-25829
FPEE-21-0001   TR LCO 3.0.3 Evaluation for the Non-Functional Diesel     Rev.0
FPEE-21-0001 TR LCO 3.0.3 Evaluation for the Non-Functional Diesel Rev.0
Fire Pump
Fire Pump
FPEE-21-0003   Evaluation of TRST 3.12.2.13                               0
FPEE-21-0003 Evaluation of TRST 3.12.2.13 0
FPEE-23-0001   EDG 13 Required Water Supply                               0
FPEE-23-0001 EDG 13 Required Water Supply 0
Fire Plans   FP-AB-2-8       Relay Room, Zone 8, EL. 613'6"                             7
Fire Plans FP-AB-2-8 Relay Room, Zone 8, EL. 613'6" 7
FP-AB-2-8       Relay Room, Zone 8, EL. 613'6"                             Rev.7
FP-AB-2-8 Relay Room, Zone 8, EL. 613'6" Rev.7
FP-AB-3-12     Control Center Complex, Zone 12 AND 12A, EL. 643'6"       Rev.6
FP-AB-3-12 Control Center Complex, Zone 12 AND 12A, EL. 643'6" Rev.6
FP-AB-3-12     Control Center Complex, Zone 12 and 12A, EL. 643'6"       6
FP-AB-3-12 Control Center Complex, Zone 12 and 12A, EL. 643'6" 6
FP-AB-3-14a     Auxiliary Building, East Battery Room, Zone 14, EL. 643'6" 4
FP-AB-3-14a Auxiliary Building, East Battery Room, Zone 14, EL. 643'6"4
FP-AB-3-14a     Auxiliary Building, East Battery Room, Zone 14, EL. 643'6" Rev.4
FP-AB-3-14a Auxiliary Building, East Battery Room, Zone 14, EL. 643'6"Rev.4
FP-AB-3M-13     Computer Room, Zone 13, EL. 655'6"                         Rev.5
FP-AB-3M-13 Computer Room, Zone 13, EL. 655'6" Rev.5
FP-AB-3M-13     Computer Room, Zone 13, EL. 655'6"                         5
FP-AB-3M-13 Computer Room, Zone 13, EL. 655'6" 5
FP-AB-BMT-4     Control Air Compression Room, Zone 4, EL. 551'0"           5
FP-AB-BMT-4 Control Air Compression Room, Zone 4, EL. 551'0" 5
FP-AB-BMT-4     Control Air Compressor Room, Zone 4, EL. 551'0"           Rev.5
FP-AB-BMT-4 Control Air Compressor Room, Zone 4, EL. 551'0" Rev.5
Miscellaneous Fire Protection Q1/Q2 2022                                                 09/28/2022
Miscellaneous Fire Protection Q1/Q2 2022 09/28/2022
Program Health
Program Health
Report
Report
Fire Protection Q2/Q4 2022                                                 02/14/2023
Fire Protection Q2/Q4 2022 02/14/2023
Program Health
Program Health
Report
Report
FPARC Meeting   Fire Protection Advisory Review Committee (FPARC)         01/09/2022
FPARC Meeting Fire Protection Advisory Review Committee (FPARC) 01/09/2022
Minutes         Agenda
Minutes Agenda
FPARC Meeting   Fire Protection Advisory Review Committee Agenda           12/12/2022
FPARC Meeting Fire Protection Advisory Review Committee Agenda 12/12/2022
Minutes
Minutes
NFPA No. 72E   Automatic Fire Detectors 1974                             1974
NFPA No. 72E Automatic Fire Detectors 1974 1974
Pyrotronics     Procedure Manual for Inspection Test Maintenance High
Pyrotronics Procedure Manual for Inspection Test Maintenance High
Voltage Systems
Voltage Systems
S-13-62         NFPA 13 Installation of Sprinkler Systems 1980             11/20/1980
S-13-62 NFPA 13 Installation of Sprinkler Systems 1980 11/20/1980
TCP 22-0480     Transient Combustible Permit                               01/05/2023
TCP 22-0480 Transient Combustible Permit 01/05/2023
TCP 23-0003     Transient Combustible Permit                               01/25/2023
TCP 23-0003 Transient Combustible Permit 01/25/2023
Inspection Type       Designation   Description or Title                                       Revision or
 
Procedure                                                                                       Date
Inspection Type Designation Description or Title Revision or
TCP 23-0004   Transient Combustible Permit                               01/25/2023
Procedure Date
TCP 23-0005   Transient Combustible Permit                               01/25/2023
TCP 23-0004 Transient Combustible Permit 01/25/2023
TCP 23-0006   Transient Combustible Permit                               01/25/2023
TCP 23-0005 Transient Combustible Permit 01/25/2023
TCP 23-0010   Transient Combustible Permit                               02/01/2022
TCP 23-0006 Transient Combustible Permit 01/25/2023
TCP 23-0011   Transient Combustible Permit                               02/06/2023
TCP 23-0010 Transient Combustible Permit 02/01/2022
TCP 23-0012   Transient Combustible Permit                               02/03/2023
TCP 23-0011 Transient Combustible Permit 02/06/2023
TRM VOL I     Technical Requirements Manual                             132
TCP 23-0012 Transient Combustible Permit 02/03/2023
Procedures 20.000.18     Control of the Plant from the Dedicated Shutdown Panel     Rev.58
TRM VOL I Technical Requirements Manual 132
20.000.18     Control of the Plant from the Dedicated Shutdown Panel     58
Procedures 20.000.18 Control of the Plant from the Dedicated Shutdown Panel Rev.58
23.501.01     Fire Water Suppression System                             Rev.66
20.000.18 Control of the Plant from the Dedicated Shutdown Panel 58
28.504.04     Fire Suppression Water System Flow Test                   38
23.501.01 Fire Water Suppression System Rev.66
28.507.05     Inspection of Penetration Fire Stops                       18, 22, and
28.504.04 Fire Suppression Water System Flow Test 38
28.507.05     Inspection of Penetration Fire Stops                       23
28.507.05 Inspection of Penetration Fire Stops 18, 22, and
MGA03         Procedure Use and Adherence                               31A
28.507.05 Inspection of Penetration Fire Stops 23
MOP02         Independent Verification                                   15A
MGA03 Procedure Use and Adherence 31A
MOP11         Fire Protection                                           25
MOP02 Independent Verification 15A
MOP11-100     Fire Protection Implementation                             9
MOP11 Fire Protection 25
MOP11-100-001 Grinding, Cutting & Welding Permit (Sample)               0
MOP11-100 Fire Protection Implementation 9
MOP11-100-002 Transient Combustible Permit                               2
MOP11-100-001 Grinding, Cutting & Welding Permit (Sample) 0
MOP11-100-003 Flammable/Combustible Liquids/Aerosols Storage             0
MOP11-100-002 Transient Combustible Permit 2
MOP11-100-003 Flammable/Combustible Liquids/Aerosols Storage 0
Approval Form
Approval Form
MOP11-100-004 Fire Protection Inspection Form                           0
MOP11-100-004 Fire Protection Inspection Form 0
MOP11-200     Fire Watch Implementation                                 1
MOP11-200 Fire Watch Implementation 1
MOP23         Plant Storage                                             8
MOP23 Plant Storage 8
MOP23002     Missile/Seismic/Floor Loading Evaluation for Plant Storage 4
MOP23002 Missile/Seismic/Floor Loading Evaluation for Plant Storage4
Work Orders 24.000.01     Fire Rated Assemblies - LCO                               1/29/2023
Work Orders 24.000.01 Fire Rated Assemblies - LCO 1/29/2023
3,
3,
Page 1 of 1
Page 1 of 1
2715
2715
2305928     Perform 28.504.04 Fire Suppression Wtr System             12/06/2018
2305928 Perform 28.504.04 Fire Suppression Wtr System 12/06/2018
Functional Flow Test
Functional Flow Test
44500300     Perform 28.504.04 Fire Suppression Wtr System             08/08/2022
44500300 Perform 28.504.04 Fire Suppression Wtr System 08/08/2022
Inspection Type Designation Description or Title                                   Revision or
 
Procedure                                                                           Date
Inspection Type Designation Description or Title Revision or
Procedure Date
Functional Flow Test
Functional Flow Test
46341095   Perform 28.504.03 Fire Suppression WTR SYS SIM Auto     08/23/2017
46341095 Perform 28.504.03 Fire Suppression WTR SYS SIM Auto 08/23/2017
Act Test (Diesel Pump)
Act Test (Diesel Pump)
49336625   Perform 28.503.06 Zone 13 Control Room Halon Fire       05/09/2019
49336625 Perform 28.503.06 Zone 13 Control Room Halon Fire 05/09/2019
Suppression Functional Test
Suppression Functional Test
49426008   Perform 28.507.06 Fire Dampers Test and Inspection -   05/20/2019
49426008 Perform 28.507.06 Fire Dampers Test and Inspection - 05/20/2019
BOP
BOP
49877763   Perform Audit of Burning, Welding, Grinding Permits     07/16/2019
49877763 Perform Audit of Burning, Welding, Grinding Permits 07/16/2019
274935   Perform 28.501.13 Sprinkler Simulated Auto Test - HPCI, 01/24/2020
274935 Perform 28.501.13 Sprinkler Simulated Auto Test - HPCI, 01/24/2020
RCIC, TORUS, BSMNT
RCIC, TORUS, BSMNT
244600   Perform 24.321 .01 Dedicated Shutdown(3L) H2 1P624     12/13/2019
244600 Perform 24.321.01 Dedicated Shutdown(3L) H2 1P624 12/13/2019
Operability - ONLI7NE
Operability - ONLI7NE
51513351   Perform 28.502.07 Zone 14 AB-3 CO2 Fire Suppression     05/30/2020
51513351 Perform 28.502.07 Zone 14 AB-3 CO2 Fire Suppression 05/30/2020
Functional
Functional
51641085   Perform 28.503.09 Zone 13 Computer Rm Fire             01/22/2020
51641085 Perform 28.503.09 Zone 13 Computer Rm Fire 01/22/2020
Protection/Detection Operability
Protection/Detection Operability
2180194   Perform 24.321.08 Dedicated Shutdown(3L,) H21P623       03/24/2020
2180194 Perform 24.321.08 Dedicated Shutdown(3L,) H21P623 03/24/2020
53082290   Perform 28.507.01 Fire Barrier Inspection Mode 1,2,3   08/20/2020
53082290 Perform 28.507.01 Fire Barrier Inspection Mode 1,2,3 08/20/2020
53082290   Perform 28.507.01 Fire Barrier Inspection (Mode 1,2,3) 06/20/2020
53082290 Perform 28.507.01 Fire Barrier Inspection (Mode 1,2,3) 06/20/2020
53192258   Perform Audit of Burning, Welding, Grinding Permits     07/14/2020
53192258 Perform Audit of Burning, Welding, Grinding Permits 07/14/2020
54162539   Perform 28.503.06 Zone 13 Control Room Halon Fire       11/03/2020
54162539 Perform 28.503.06 Zone 13 Control Room Halon Fire 11/03/2020
Suppression Functional Test
Suppression Functional Test
54859922   Perform 28.503.09 Zone 13 Computer Rm Fire             01/20/2021
54859922 Perform 28.503.09 Zone 13 Computer Rm Fire 01/20/2021
Protection/Detection Operability
Protection/Detection Operability
55520995   Perform 28.501.13 Sprinkler Simulated Auto Test - HPCI, 03/18/2021
55520995 Perform 28.501.13 Sprinkler Simulated Auto Test - HPCI, 03/18/2021
RCIC, TORUS, BSMNT
RCIC, TORUS, BSMNT
56584775   Perform 24.321.05 Dedicated Shutdown(3L) H-21P623       07/09/2021
56584775 Perform 24.321.05 Dedicated Shutdown(3L) H-21P623 07/09/2021
56656495   Perform Audit of Burning, Welding, Grinding Permits     07/13/2021
56656495 Perform Audit of Burning, Welding, Grinding Permits 07/13/2021
249732   Repair Steam Tunnel Penetration Seals Which Failed     03/08/2022
249732 Repair Steam Tunnel Penetration Seals Which Failed 03/08/2022
Inspection
Inspection
249732   Repair Steam Tunnel Penetration Seals Which Failed     04/24/2020
249732 Repair Steam Tunnel Penetration Seals Which Failed 04/24/2020
Inspection
Inspection
57338954   Perform 28.505.04 Zone 4 RBB & RBSB-SE Fire             10/07/2021
57338954 Perform 28.505.04 Zone 4 RBB & RBSB-SE Fire 10/07/2021
Detection Operability & Functional
Detection Operability & Functional
Inspection Type Designation Description or Title                                   Revision or
Inspection Type Designation Description or Title Revision or
Procedure                                                                           Date
Procedure Date
57387374   Perform 28.505.12A CR - Misc Fire Detection Operability 10/14/2021
57387374 Perform 28.505.12A CR - Misc Fire Detection Operability 10/14/2021
57862596   Replace Valve P80F407 - Jockey Pump Disch               08/02/2022
57862596 Replace Valve P80F407 - Jockey Pump Disch 08/02/2022
Backpressure Vlv
Backpressure Vlv
59440174   Perform 37.000.014 Emergency Lighting Performance       05/16/2022
59440174 Perform 37.000.014 Emergency Lighting Performance 05/16/2022
Evaluation for Group 3 Inc Freq 6 Months
Evaluation for Group 3 Inc Freq 6 Months
59517411   Perform 28.507.06 Fire Dampers Test and Inspection-     05/16/2022
59517411 Perform 28.507.06 Fire Dampers Test and Inspection- 05/16/2022
BOP-License Renewal
BOP-License Renewal
59859351   Perform 28.505.60 Zone 12 Detector Sensitivity Test     06/09/2022
59859351 Perform 28.505.60 Zone 12 Detector Sensitivity Test 06/09/2022
59859354   Perform 28.505.12 Zone 12 Control Room Fire Detection   06/09/2022
59859354 Perform 28.505.12 Zone 12 Control Room Fire Detection 06/09/2022
Operability & Functional
Operability & Functional
60500936   Perform 28.504.03 for the ADFP Only                     02/24/2021
60500936 Perform 28.504.03 for the ADFP Only 02/24/2021
61130598   Perform 28.505.04 Zone 4 RBB & RBSB-SE Fire             10/06/2022
61130598 Perform 28.505.04 Zone 4 RBB & RBSB-SE Fire 10/06/2022
Detection Operability & Functional
Detection Operability & Functional
61197622   Perform 28.505.12A Zone 12A CR-MISC Fire Detection     10/13/2022
61197622 Perform 28.505.12A Zone 12A CR-MISC Fire Detection 10/13/2022
Operability
Operability
61369121   Perform 28.504.03 Fire Suppression Wtr Sys Sim Auto Act 11/01/2022
61369121 Perform 28.504.03 Fire Suppression Wtr Sys Sim Auto Act 11/01/2022
Test (electric pump)
Test (electric pump)
61443907   Perform 28.504.03 Fire Suppression Wtr Sys Sim Auto Act 12/05/2022
61443907 Perform 28.504.03 Fire Suppression Wtr Sys Sim Auto Act 12/05/2022
Test (diesel pump)
Test (diesel pump)
61905560   Perform 24.107.03 Sec-5.2 SBFW Pump "A" Flow Test       12/28/2022
61905560 Perform 24.107.03 Sec-5.2 SBFW Pump "A" Flow Test 12/28/2022
297989   Perform 24.107.03 Sec-5.3 SBFW Pump "B" Flow Test       02/10/2023
297989 Perform 24.107.03 Sec-5.3 SBFW Pump "B" Flow Test 02/10/2023
262316   Perform 28.504.02 Diesel Fire Pump Weekly Operability- 01/30/2023
262316 Perform 28.504.02 Diesel Fire Pump Weekly Operability- 01/30/2023
License Renewal
License Renewal
67360307   Perform 28.504.02 Diesel Fire Pump Weekly               01/16/2023
67360307 Perform 28.504.02 Diesel Fire Pump Weekly 01/16/2023
Operability-License Renewal
Operability-License Renewal
FP14010927 Perform 23.504.003 Fire Suppression WTR SYS SIM Auto   09/27/2001
FP14010927 Perform 23.504.003 Fire Suppression WTR SYS SIM Auto 09/27/2001
Act Test (Electric Pump)
Act Test (Electric Pump)
FP15070926 Perform 28.504.03 Fire Suppression WTR SYS Sim Auto     09/26/2007
FP15070926 Perform 28.504.03 Fire Suppression WTR SYS Sim Auto 09/26/2007
Act Test (Diesel Pump)
Act Test (Diesel Pump)
FS87201112 Perform 28.507.05 Att 3 & 10 Survey Grp 7 Inspection of 11/12/2020
FS87201112 Perform 28.507.05 Att 3 & 10 Survey Grp 7 Inspection of 11/12/2020
Penetration Fire Stops
Penetration Fire Stops
14
14
}}
}}

Latest revision as of 21:25, 14 November 2024

– Triennial Fire Protection Inspection Report 05000341/2023011
ML23095A085
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 04/06/2023
From: Jasmine Gilliam
NRC/RGN-III/DORS/EB2
To: Peter Dietrich
DTE Electric Company
References
IR 2023011
Download: ML23095A085 (1)


Text

SUBJECT:

FERMI POWER PLANT, UNIT 2 - TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000341/2023011

Dear Peter Dietrich:

On March 9, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Fermi Power Plant, Unit 2 and discussed the results of this inspection with Eric Olson, Site Vice President and other members of your staff. The results of this inspection are documented in the enclosed report.

No NRC identified or self-revealing findings were identified during this inspection.

A licensee-identified violation which was determined to be of very low safety significance is documented in this report. We are treating this violation as a non-cited violation (NCV)

consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violation or the significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement; and the NRC Resident Inspector at Fermi Power Plant, Unit 2.April 6, 2023 This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jasmine A. Gilliam, Acting Branch Chief Engineering Branch 2 Division of Operating Reactor Safety Docket No. 05000341 License No. NPF-43

Enclosure:

As stated

Inspection Report

Docket Number: 05000341

License Number: NPF-43

Report Number: 05000341/2023011

Enterprise Identifier: I-2023-011-0026

Licensee: DTE Electric Company

Facility: Fermi Power Plant, Unit 2

Location: Newport, MI

Inspection Dates: February 13, 2023 to March 09, 2023

Inspectors: M. Abuhamdan, Reactor Inspector M. Gangewere, Reactor Inspector I. Hafeez, Senior Reactor Inspector

Approved By: Jasmine A. Gilliam, Acting Branch Chief Engineering Branch 2 Division of Operating Reactor Safety

Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a triennial fire protection inspection at Fermi Power Plant, Unit 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. A licensee-identified non-cited violation is documented in report Section: 71111.21N.0

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

===71111.21N.05 - Fire Protection Team Inspection (FPTI)

Structures, Systems, and Components (SSCs) Credited for Fire Prevention, Detection, Suppression, or Post-Fire Safe Shutdown Review (IP Section 03.01)===

The inspectors verified that components and/or systems will function as required to support the credited functions stated for each sample. Additional inspection considerations are located in the fire hazards analysis (FHA) or safe shutdown analysis (SSA).

(1) Suppression Pool Cooling
(2) Stand By Feed Water
(3) Fire Zone 1ABS1CAC room
(4) Fire Zone 09AB Main Control Room

Fire Protection Program Administrative Controls (IP Section 03.02) (1 Sample)

The inspectors verified that the selected control or process is implemented in accordance with the licensees current licensing basis. If applicable, ensure that the licensees Fire Protection Program (FPP) contains adequate procedures to implement the selected administrative control. Verify that the selected administrative control meets the requirements of all committed industry standards.

(1) Combustible Control Program

Fire Protection Program Changes/Modifications (IP Section 03.03) (3 Samples)

The inspectors verified the following:

a. Changes to the approved FPP do not constitute an adverse effect on the ability to safely shutdown.

b. The adequacy of the design modification, if applicable.

c.

Assumptions and performance capability stated in the SSA have not been degraded through changes or modifications.

d. The FPP documents, such as the Updated Final Safety Analysis Report, fire protection report, FHA, and SSA were updated consistent with the FPP or design change.

e. Post-fire SSD operating procedures, such as abnormal operating procedures, affected by the modification were updated.

(1) FPEE-21-0001-TR LCO 3.0.3 Evaluation for the Non-Functional Diesel Fire Pump.
(2) EVAL-DE0035-01-Evaluation of Fermi 2 Wet Pipe Sprinkler Systems for Compliance with the Requirements of NFPA-13, Standard for the Installation of Sprinkler Systems.
(3) Update of FPEE-02-0020 for spatial and failure history of Steam Tunnel Seals.

INSPECTION RESULTS

Licensee-Identified Non-Cited Violation 71111.21N.05 This violation of very low safety significance was identified by the licensee and has been entered into the licensee corrective action program and is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

Violation: Technical Specification Section 5.4.1.a states, in part, that written procedures shall be established, implemented, and maintained covering the applicable procedures recommended in Regulatory Guide 1.33, Revision 2, Appendix A, February 1978. NRC Regulatory Guide 1.33, Appendix A, Section 8 addresses Procedures for Control of Measuring and Test Equipment and for Surveillance Test, Procedures, and Calibration. Section 8 b 1 (h), further specifies, in part, that fire protection system functional test inspection procedures should be written for each surveillance, test, inspection, or calibration listed in the technical specifications. TRSM Section 3.12.2.13 Surveillance Requirements, requires the licensee to verify that each fire pump develops a minimum calculated value of 2500 gpm at 150 psig at the discharge flange of the pump adjusted for the minimum allowed lake level of 562-0.

Procedure 28.504.03 is the sites implementing procedure for the TRSM 3.12.2.13 required test. Contrary to the above, between 2001 and 2021, the licensee failed to maintain a written procedure associated with Fire Suppression Water System Simulated Automatic Actuation test. Specifically, the site failed to maintain procedure 28.504.03, Fire Suppression Water System Simulated Automatic Actuation test, because licensee failed to incorporate appropriate acceptance criteria for fire pump discharge flow and pressure. 28.504.03 contained the acceptance criteria for the fire pumps to be 1825 gpm at 149 psig resulted in insufficient automatic flow and pressure to be delivered to the Emergency Diesel Generating (EDG) Fuel Oil Storage Tank (FOST) rooms for fire suppression.

Significance/Severity: Green.

Corrective Action References: CARD 23-21712 (2023 NRC Fire Protection Inspection identified-Past Fire Water Pump Performance)

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On March 9, 2023, the inspectors presented the triennial fire protection inspection results to Eric Olson, Site Vice President and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.21N.05 Calculations DC-4921 I

I. Conclusions, Summary of Results, A. Appendix R I

Compliance-05RBN and -05RBS

DC-4921 Vol 1 Appendix R Calculations Rev.1

Book 2 of 3

DC-4921 Vol1 Appendix R Calculations Rev.1

Book 3 of 3

DC-5702 Vol I Fire Loading Calculation H and M

DC-5713 Vol I Attachment 2 D

DC-5713 Vol I System 29 - RHR: EDG11 Fuel Oil Tank Room F

DC-5713 Vol I Hydraulic Evaluation of the Upgraded Fire Distribution F

Loop

DC-6 119 Appendix R Database Rev.E

DC-6197 Reactor Coolant System Response Analyses to Support C

10CFR50 Appendix R Compliance

DC-6483 Appendix R Protective Device Coordination Calculation Rev.0

DC-6483 Appendix R Protective Device Coordination Calculation Rev.0

Calibration DC-4921 VOL 1 Appendix R Calculations Rev.1

Records Book 1 of 3

Corrective Action 21-21167 Alternate Diesel Fire Pump Flow Concern 02/07/2021

Documents 22-31216 NQA - Notice of First Level Issue Escalation - Continued 11/17/2022

Violations in Station Standards Regarding Fire

Hazards

98-12365 UFSAR/TRM Surveillance Requirements for Fire 04/01/1998

Suppression System Should Be Based on System

Requirements

CARD - 21-Technical Specification 5.4.1.d States That Written 08/10/2021

27023 Procedures Shall Be Established, Implemented, and

Maintained Covering Fire Protection Program

Implementation

71111.21N.05 Corrective Action CARD 21-21167 Organizational Effectiveness Cause Evaluation Rev.2

Documents CARD-19-26148 28.507.05 Does Not Meet Requirements of TRSR 3.12.8.7 08/15/2019

for 10% of Seal Type per Survey Group

Inspection Type Designation Description or Title Revision or

Procedure Date

CARD-20-24081 Procedure Not Properly Revised 04/08/2020

Investigation into CARD - 21-21583 02/18/2021

TRSR 3.12.2.13

Corrective Action 23-21122 2023 NRC Fire Protection Inspection: Previous UFSAR 02/09/2023

Documents Section Submitted to NRC

Resulting from 23-21147 NRC Identified: Door R3-12 Latch Does Not Engage 02/10/2023

Inspection 23-21237 2023 NRC Fire Protection Inspection - NRC Identified - 02/14/2023

Cracks in the Dedicated Shutdown Panel Pedestal

23-21238 2023 NRC Fire Protection Inspection NRC Identified 02/14/2023

Housekeeping Issue

23-21251 2023 NRC Fire Protection Inspection - NRC Identified- 02/25/2023

Cart Not Adequately Restrained

23-21274 2023 NRC Fire Protection Inspection: BOP Fire Door RA2- 02/15/2023

Not Latching

23-21276 2023 NRC Fire Protection Inspection - CTG11-2 Door Not 02/15/2023

Latching

23-21277 2023 NRC Fire Protection Inspection - NRC Identified - 02/15/2023

CTG11-2 Panel Seam Cover Loose

23-21278 2023 NRC Fire Protection Inspection - NRC Identified - 02/15/2023

CTG11-3 Exhaust Panel Loose

23-21282 2023 NRC Fire Protection Inspection - NRC Identified - 02/15/2023

CTG11 CO2 System Auxiliary Relief Valve

Leaking

23-21284 2023 NRC Fire Protection Inspection - NRC Identified - 02/15/2023

R2103S007 SBO 125VDC Battery Charger AC

Indicator Light is Flashing

23-21287 2023 NRC Fire Protection Inspection: Investigate If Carts 02/15/2023

in Relay Room Are Approved per MOP23

23-21289 2023 NRC Fire Protection Inspection - NRC Identified: 02/15/2023

Halon Bottle Strap Bolts Need Tightening

23-21290 2023 NRC Fire Protection Inspection - NRC Identified: 02/15/2023

Housekeeping and Storage Issues in BOP

Switchgear Room

23-21355 2023 NRC Fire Protection Inspection: Performed 02/17/2023

Inspection Type Designation Description or Title Revision or

Procedure Date

Surveillance Document Backlog

23-21368 2023 NRC Fire Protection Inspection: Enhancement 02/14/2023

Evaluation for Computer Room Ceiling Tiles and Halon

System

23-21415 2023 NRC Fire Protection Inspection - NRC Identified: 02/20/2023

Potential Hydrogen Accumulation Concern

23-21419 2023 NRC Fire Protection Inspection: FP37, "Perform 02/20/2023

28.507.02 Fire Barrier Inspection (Mode 1,2,3) - License

Renewal" Requires Full Completion

23-21431 23.324.01 Procedure Enhancement 02/21/2023

23-21459 2023 NRC Fire Protection Inspection - Evaluation for 02/21/2023

MOP11 Transient Control Needed

23-21504 2023 NRC Fire Protection Inspection-NRC Identified, 02/22/2023

Discussion on Seal Inspection Procedure 28.507.05

C and How Were Meeting 10% Every

Months

23-21505 2023 NRC Fire Protection Inspection - NRC Identified, 02/22/2023

Regarding the Note About M.05 20% every 18 Months

23-21515 2023 NRC Fire Protection Inspection - Evaluate If Hot 02/22/2023

Work Audit SPF Should Provide More Information

23-21549 2023 NRC Fire Protection Inspection: DFP Room 02/23/2023

Sprinkler System Enhancement FPEE

23-21558 2023 NRC Fire Protection Inspection: NRC Identified: 02/23/2023

Acceptance Criteria (Step 7.1) Not Signed

23-21624 2023 NRC Fire Protection Inspection: Enhancement 02/27/2023

Procedure 28.507.05 Rev 23 Step 5.1.1

23-21667 2023 NRC Fire Protection Inspection: Enhancement to 02/28/2023

Detector Sensitivity Surveillance

23-21712 2023 NRC Fire Protection Inspection: NRC Identified - 03/01/2023

Past Fire Water Pump Performance

23-21713 2023 NRC Fire Protection Inspection: NRC Identified - 03/01/2023

Documentation Supporting MGA03 Adherence

23-21715 2023 NRC Fire Protection Inspection: NRC Identified - 03/01/2023

Higher Than Expected Jockey Fire Pump Discharge

Inspection Type Designation Description or Title Revision or

Procedure Date

Pressure

23-21760 2023 NRC Fire Protection Inspection: NRC Identified - 03/02/2023

Fire Wrap External Surfaces Inspection Guidance

23-21768 2023 NRC Fire Protection Inspection: EDP-80165 DFP 03/02/2023

Sprinkler Head Adjusted and FP Program Impact

23-21803 2023 NRC Fire Protection Inspection: TSR-36993 Not 03/04/2023

Incorporated into DC-5702Rev H

23-21822 2023 NRC Fire Protection Inspection: Recommended 03/06/2023

Enhancement to MWC10Fire Wrap Guidance

23-21883 2023 NRC Fire Protection Inspection - NRC Identified - 03/07/2023

Observation on Documentation Quality

23-21885 2023 NRC Fire Protection Inspection: Recommended 03/07/2023

KT&R Enhancement

23-21889 2023 NRC Fire Protection Inspection: NRC Identified- 03/07/2023

Generate a FPEE for the RB1 and RB2 Combustible

Exclusion Zones

23-21896 2023 NRC Fire Protection Inspection - NRC Identified - 03/08/2023

Observation on Procedure Adherence

23-21947 2023 FPTI - NRC Observation on RFI Responsed 03/09/2023

Drawings 61721-2482-02 Wiring Diagram Electric Fire Pump Controller General Rev.1

Service Water Pump HSE

61721S-2481-02 Schematic Diagram Electric Fire Pump General Service Rev.N

Water Pump HSE

61721S-2481-02 Schematic Diagram Electric Fire Pump General Service Rev.N

Water Pump HSE

61721S-2481-Schematic Diagram Diesel Fore Pump P8000C001 Rev.0

03A

61721S-2481-Wiring Diagram Diesel Fire Pump Driver Connection Rev.0

03E

6I721-2002-04 Auxiliary Building Relay Room Equipment Layout FIN. FL. T

EL. 613'-6"

6I721-2041-09 Internal-External Wiring Diagram Termination Cab. V

H11P861 Part 1

6I721-2041-10 Internal-External Wiring Diagram Termination Cab. P

Inspection Type Designation Description or Title Revision or

Procedure Date

H11P861 Part II

6I721-2051-48 Wiring Diagram Termination Cabinet H11P889 Part 1 S

6I721-2051-49 Wiring Diagram Termination Cabinet H11-P889 Part 2 O

6I721-2882-3 Instrument & Control Equipment Radwaste Building F

Second Floor EL 613'-6"

6M721-2135 Diagram Fire Protection System (Sheet 1) BC

6M721-2135-1 Diagram Fire Protection System (Sheet 2) Rev.BN

6M721-5072 Fire Protection Plan Cable Tray Area at Elevations 551'-6" K

& 562'-6" Auxiliary Building

6M721-5076 Fire Protection Plan Cable Tray Area at Elevation 562'-6" E

Aux. Building

6M721A-2025 Fire Protection Plan Diesel Engine Fire Pump Room D

General Service Water Pumphouse

6SD721-2500-01 One Line Diagram Plant 4160V & 480V System Service Rev.CN

6SD721-2500-01 One Line Diagram Plant 4160V & 480V System Service 12/09/2022

2 Fire Protection Evaluation Reactor and Auxiliary Buildings P

Basement - Plan - EL. 562'-0"

A-2403 Fire Protection Evaluation Reactor and Auxiliary Buildings T

First Floor - Plan - El. 583'-6"

A-2405 Fire Protection Evaluation Reactor and Auxiliary Buildings Y

Second Floor - Plan - EL. 613'-6"

A-2407 Fire Protection Evaluation Reactor and Auxiliary Buildings T

Third Floor - Plan - EL. 641'-6" and 643'-6"

A-2408 Fire Protection Evaluation Reactor and Auxiliary Buildings U

Fourth Floor - Plan - EL. 659'-6"

A-2409 Fire Protection Evaluation Reactor and Auxiliary Buildings V

Fifth Floor - Plan - EL. 677'-6" and 684'-6"

A-4359 Battery Charg R DV1 F R-A B 643-6 C

E0102 Fire Seal Electrical Penetration Multiple Trays - Floor 4

M-S-2025 Document Revised under EDP-80165.053 for Water Fire 0

Protection

Piping Isometric 6M721-4526-1 N

Fire Protection

Sprinkler Feed

Inspection Type Designation Description or Title Revision or

Procedure Date

System Reactor

and Auxiliary

Bldgs

Engineering 3071-198 Wall and Floor Penetration Seals and Fire Stops I

Changes EDP 80165 Fermi 2 Diesel Driven Fire Pump Replacement 0

Modification

EDP-1558 Spray Shields for MCCs and EECW Pump Motors A

EDP80165 Fermi 2 Diesel Driven Fire Pump Replacement Rev.0

Modification

FCR 80165-8 Fermi 2 Diesel Driven Fire Pump Replacement 0

Modification

TSR 38095 EF2 Impacts of GNF3 New Fuel Introduction 0

TSR-36993 Documentation of Permanent Plant Shielding Along RB1 0

West Wall Between Columns A-11 and A-12

Engineering EVAL DE0035 01 Evaluation of Fermi 2 Wet Pipe Sprinkler Systems for A

Evaluations Compliance with the Requirements of NFPA-13, Standard

for the Installation of Sprinkler Systems

EVAL-DE-0035-Evaluation of Fermi 2 Automatic Fire Detection Systems 0

for Compliance with the Requirements of NFPA-72E

(Standard for Automatic Fire Detectors), and NFPA 72D

(Standard for Proprietary Protective Signaling Systems)

EVAL-DE0027-Evaluation of Fermi 2 Wet Pipe Sprinkler Systems for 0

Compliance with the Requirements of NFPA-13 Standard

for the Installation of Sprinkler Systems

EVAL-DE0035-Evaluation of Fermi 2 Wet Pipe Sprinkler Systems for 0

Compliance with the Requirements of NFPA-13, Standard

for the Installation of Sprinkler Systems

FPEE-02-0020 Update of FPEE-02-0020 for Spatial and Failure History of 1

Steam Tunnel Seals

FPEE-05-0020 NFPA 13-1980 Noncompliances for Several Sprinkler 2

Systems

FPEE-09-0004 Requirements for Temporary Intervening Combustibles in 0

Modes 1, 2,& 3

FPEE-09-0042 Acceptability of Fire Detector Spacing & Location 0

Inspection Type Designation Description or Title Revision or

Procedure Date

Non-Conformance for Detection Zone 4

FPEE-20-0005 Evaluation of OK-480/0K-470 Metal Tray Cover Not Rev.0

Installed and Impact on Safe Shutdown CARD 20-25829

FPEE-21-0001 TR LCO 3.0.3 Evaluation for the Non-Functional Diesel Rev.0

Fire Pump

FPEE-21-0003 Evaluation of TRST 3.12.2.13 0

FPEE-23-0001 EDG 13 Required Water Supply 0

Fire Plans FP-AB-2-8 Relay Room, Zone 8, EL. 613'6" 7

FP-AB-2-8 Relay Room, Zone 8, EL. 613'6" Rev.7

FP-AB-3-12 Control Center Complex, Zone 12 AND 12A, EL. 643'6" Rev.6

FP-AB-3-12 Control Center Complex, Zone 12 and 12A, EL. 643'6" 6

FP-AB-3-14a Auxiliary Building, East Battery Room, Zone 14, EL. 643'6"4

FP-AB-3-14a Auxiliary Building, East Battery Room, Zone 14, EL. 643'6"Rev.4

FP-AB-3M-13 Computer Room, Zone 13, EL. 655'6" Rev.5

FP-AB-3M-13 Computer Room, Zone 13, EL. 655'6" 5

FP-AB-BMT-4 Control Air Compression Room, Zone 4, EL. 551'0" 5

FP-AB-BMT-4 Control Air Compressor Room, Zone 4, EL. 551'0" Rev.5

Miscellaneous Fire Protection Q1/Q2 2022 09/28/2022

Program Health

Report

Fire Protection Q2/Q4 2022 02/14/2023

Program Health

Report

FPARC Meeting Fire Protection Advisory Review Committee (FPARC) 01/09/2022

Minutes Agenda

FPARC Meeting Fire Protection Advisory Review Committee Agenda 12/12/2022

Minutes

NFPA No. 72E Automatic Fire Detectors 1974 1974

Pyrotronics Procedure Manual for Inspection Test Maintenance High

Voltage Systems

S-13-62 NFPA 13 Installation of Sprinkler Systems 1980 11/20/1980

TCP 22-0480 Transient Combustible Permit 01/05/2023

TCP 23-0003 Transient Combustible Permit 01/25/2023

Inspection Type Designation Description or Title Revision or

Procedure Date

TCP 23-0004 Transient Combustible Permit 01/25/2023

TCP 23-0005 Transient Combustible Permit 01/25/2023

TCP 23-0006 Transient Combustible Permit 01/25/2023

TCP 23-0010 Transient Combustible Permit 02/01/2022

TCP 23-0011 Transient Combustible Permit 02/06/2023

TCP 23-0012 Transient Combustible Permit 02/03/2023

TRM VOL I Technical Requirements Manual 132

Procedures 20.000.18 Control of the Plant from the Dedicated Shutdown Panel Rev.58

20.000.18 Control of the Plant from the Dedicated Shutdown Panel 58

23.501.01 Fire Water Suppression System Rev.66

28.504.04 Fire Suppression Water System Flow Test 38

28.507.05 Inspection of Penetration Fire Stops 18, 22, and

28.507.05 Inspection of Penetration Fire Stops 23

MGA03 Procedure Use and Adherence 31A

MOP02 Independent Verification 15A

MOP11 Fire Protection 25

MOP11-100 Fire Protection Implementation 9

MOP11-100-001 Grinding, Cutting & Welding Permit (Sample) 0

MOP11-100-002 Transient Combustible Permit 2

MOP11-100-003 Flammable/Combustible Liquids/Aerosols Storage 0

Approval Form

MOP11-100-004 Fire Protection Inspection Form 0

MOP11-200 Fire Watch Implementation 1

MOP23 Plant Storage 8

MOP23002 Missile/Seismic/Floor Loading Evaluation for Plant Storage4

Work Orders 24.000.01 Fire Rated Assemblies - LCO 1/29/2023

3,

Page 1 of 1

2715

2305928 Perform 28.504.04 Fire Suppression Wtr System 12/06/2018

Functional Flow Test

44500300 Perform 28.504.04 Fire Suppression Wtr System 08/08/2022

Inspection Type Designation Description or Title Revision or

Procedure Date

Functional Flow Test

46341095 Perform 28.504.03 Fire Suppression WTR SYS SIM Auto 08/23/2017

Act Test (Diesel Pump)

49336625 Perform 28.503.06 Zone 13 Control Room Halon Fire 05/09/2019

Suppression Functional Test

49426008 Perform 28.507.06 Fire Dampers Test and Inspection - 05/20/2019

BOP

49877763 Perform Audit of Burning, Welding, Grinding Permits 07/16/2019

274935 Perform 28.501.13 Sprinkler Simulated Auto Test - HPCI, 01/24/2020

RCIC, TORUS, BSMNT

244600 Perform 24.321.01 Dedicated Shutdown(3L) H2 1P624 12/13/2019

Operability - ONLI7NE

51513351 Perform 28.502.07 Zone 14 AB-3 CO2 Fire Suppression 05/30/2020

Functional

51641085 Perform 28.503.09 Zone 13 Computer Rm Fire 01/22/2020

Protection/Detection Operability

2180194 Perform 24.321.08 Dedicated Shutdown(3L,) H21P623 03/24/2020

53082290 Perform 28.507.01 Fire Barrier Inspection Mode 1,2,3 08/20/2020

53082290 Perform 28.507.01 Fire Barrier Inspection (Mode 1,2,3) 06/20/2020

53192258 Perform Audit of Burning, Welding, Grinding Permits 07/14/2020

54162539 Perform 28.503.06 Zone 13 Control Room Halon Fire 11/03/2020

Suppression Functional Test

54859922 Perform 28.503.09 Zone 13 Computer Rm Fire 01/20/2021

Protection/Detection Operability

55520995 Perform 28.501.13 Sprinkler Simulated Auto Test - HPCI, 03/18/2021

RCIC, TORUS, BSMNT

56584775 Perform 24.321.05 Dedicated Shutdown(3L) H-21P623 07/09/2021

56656495 Perform Audit of Burning, Welding, Grinding Permits 07/13/2021

249732 Repair Steam Tunnel Penetration Seals Which Failed 03/08/2022

Inspection

249732 Repair Steam Tunnel Penetration Seals Which Failed 04/24/2020

Inspection

57338954 Perform 28.505.04 Zone 4 RBB & RBSB-SE Fire 10/07/2021

Detection Operability & Functional

Inspection Type Designation Description or Title Revision or

Procedure Date

57387374 Perform 28.505.12A CR - Misc Fire Detection Operability 10/14/2021

57862596 Replace Valve P80F407 - Jockey Pump Disch 08/02/2022

Backpressure Vlv

59440174 Perform 37.000.014 Emergency Lighting Performance 05/16/2022

Evaluation for Group 3 Inc Freq 6 Months

59517411 Perform 28.507.06 Fire Dampers Test and Inspection- 05/16/2022

BOP-License Renewal

59859351 Perform 28.505.60 Zone 12 Detector Sensitivity Test 06/09/2022

59859354 Perform 28.505.12 Zone 12 Control Room Fire Detection 06/09/2022

Operability & Functional

60500936 Perform 28.504.03 for the ADFP Only 02/24/2021

61130598 Perform 28.505.04 Zone 4 RBB & RBSB-SE Fire 10/06/2022

Detection Operability & Functional

61197622 Perform 28.505.12A Zone 12A CR-MISC Fire Detection 10/13/2022

Operability

61369121 Perform 28.504.03 Fire Suppression Wtr Sys Sim Auto Act 11/01/2022

Test (electric pump)

61443907 Perform 28.504.03 Fire Suppression Wtr Sys Sim Auto Act 12/05/2022

Test (diesel pump)

61905560 Perform 24.107.03 Sec-5.2 SBFW Pump "A" Flow Test 12/28/2022

297989 Perform 24.107.03 Sec-5.3 SBFW Pump "B" Flow Test 02/10/2023

262316 Perform 28.504.02 Diesel Fire Pump Weekly Operability- 01/30/2023

License Renewal

67360307 Perform 28.504.02 Diesel Fire Pump Weekly 01/16/2023

Operability-License Renewal

FP14010927 Perform 23.504.003 Fire Suppression WTR SYS SIM Auto 09/27/2001

Act Test (Electric Pump)

FP15070926 Perform 28.504.03 Fire Suppression WTR SYS Sim Auto 09/26/2007

Act Test (Diesel Pump)

FS87201112 Perform 28.507.05 Att 3 & 10 Survey Grp 7 Inspection of 11/12/2020

Penetration Fire Stops

14