ML20085D128: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20085D128
| number = ML20085D128
| issue date = 05/04/1973
| issue date = 05/04/1973
| title = Provides Addl Info Re 730426 Ltr Concerning Faulty Overcurrent Trip Delay Device in Circuit Breakers.Trip Devices Not Available from Vendor for Approx 2 Months
| title = Provides Addl Info Re Concerning Faulty Overcurrent Trip Delay Device in Circuit Breakers.Trip Devices Not Available from Vendor for Approx 2 Months
| author name = Utley E
| author name = Utley E
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8307200508
| document report number = NUDOCS 8307200508
| title reference date = 04-26-1973
| package number = ML20085D120
| package number = ML20085D120
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC

Latest revision as of 22:41, 25 September 2022

Provides Addl Info Re Concerning Faulty Overcurrent Trip Delay Device in Circuit Breakers.Trip Devices Not Available from Vendor for Approx 2 Months
ML20085D128
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 05/04/1973
From: Utley E
CAROLINA POWER & LIGHT CO.
To: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20085D120 List:
References
NUDOCS 8307200508
Download: ML20085D128 (2)


Text

O No hmgb C ,

C.iroiana Power & Light Company May 4, 1973 Mr. Norman C. Moscicy, Director Directorate of Regulatory Operations U. S. Atomic Energy Commission Reg, ion II, Suite 818 230 Peachtree Street, N.W.

Atlanta, Georgia 30303

Dear Mr. Moscicy:

H. B. ROBINSON UNIT NO. 2 LICENSE DPR-23 RO:II:50-261 FAULTY OVERCURRENI TRIP DEIAY DEVICE IN CIRCUIT BREAKERS FOR ENGINEERED SATETY SYSTEMS I

In our letter to you of April 26, 1973, we stated that the over-current trip devices would be installed during this current outage. At this time the vendor has informed us that these trip devices will not be availabic for approximately two months. This schedule will not allow us

'[ i to complete this modification during this outage. We will continue our monthly surveillence of the affected equipment, and the overcurrent devices will be changed out as soon as they are availabic. In addition, we are inspecting each of the overcurrent trip devices during this outage to insure that the installed devices are not cracked.

Very truly yours, b

E. E. Uticy -

Vice-President Bulk Power Supply BJF:NDB:mp cc: Mr. C. D. Barham Mr. N. B. Bessac Mr. B. J. . Furr t , ; g-..; t Mr. D.gV. ,Menscer'. , a n .;; r l';D#M 2 Ul ? 03

  • ? $

' B307200508 730830 ,

PDR ADDCK 05000261 S

PDR.. -- es=::m::trwactsc.cs.1m a -

3.N i ,iceu. ' vill.' ';;i. . ! . P O liax l',. .I . Rih aqli N t: ? /t.,0:!

b e -,

r

'~

O O

^

/

JUM r p 1973 Letters from Carolina Power and Light Company dated April 26, 1973 and May 4, 1973 261 (ROB 73-1)

DISTRIBUTION:

11. D. Thornburg, PO

,' ,,,,c )RO:IIQ (4) 7-Directorate of Licensing (4)

DR Central Files PDR Local PDR NSIC OIS, OR State e

er