ML20148U357: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20148U357
| number = ML20148U357
| issue date = 10/26/1978
| issue date = 10/26/1978
| title = Forwards IE Inspec Rept#50-364/78-14 on 780912-15 & Notice of Violation
| title = Forwards IE Inspec Rept 50-364/78-14 on 780912-15 & Notice of Violation
| author name = Murphy C
| author name = Murphy C
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)

Latest revision as of 19:34, 7 August 2022

Forwards IE Inspec Rept 50-364/78-14 on 780912-15 & Notice of Violation
ML20148U357
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 10/26/1978
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Barton A
ALABAMA POWER CO.
Shared Package
ML20071F942 List:
References
NUDOCS 7812070024
Download: ML20148U357 (2)


See also: IR 05000364/1978014

Text

p* NCo UNITED STATES

' q[og NUCLEAR REGULATORY COMMISSION

u 3 .p. , o REGloN 11

2 " ' I 101 M ARIETT A STREET, N.W.

ATLANT A, GE oRGI A 30303

"% .....# OCT 2 61978

In Reply Refer To: l

RII:MDH

50-364/78-14

Alabama Power Company

Attn: Mr. A. R. Barton

Executive Vice President

Post Office Box 2641

Birmingham, Alabama 35291

l

Gentlemen:

This refers to the inspection conducted by Mr. M. D. Hunt of this office

on September 12-15, 1978, of activities authorized by NRC Construction

Permit No. CPPR-86 for the J. M. Farley Unit 2 facility, and to the

discussion of our findings held with Mr. R. E. Hollands, Jr. at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspectors.

We have examined actions you have taken with regard to previously

reported unresolved items. The status of these items is discussed in

the enclosed report.

During this inspection it was found that certain activities under your

license appear to be in noncompliance with NRC requirements. This

item and references to pertinent requirements are listed in the Notice

of Violation enclosed herewith as Appendix A. This notice is sent to

you pursuant to the provisions of Section 2.201 of the NRC's " Rules of

Practice," Part 2, Title ?), Code of Federal Regulations. Section 2.201

requires you to submit to this office, within 20 days of your receipt of

this notice, a written statement or explanation in reply including: (1)

corrective steps which have been taken by you and the results achieved;

(2) corrective steps which will be taken to avoid further noncompliance;

and (3) the date when full compliance will be achieved. With regard to

item number 364/78-14-01, corrective actions to prevent recurrence were

completed prior to conclusion of this inspection; therefore, a reply is

not requested for this item.

78120700^Of

_ _ _ _ _ - _

- - - - --- - --

.

l

Alabama Power Company -2-

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public Document

Room. If this report contains eny information that you (or your contractor)

believe to be proprietary, it is necessary that you make a written

application within 20 days to this of fice to withhold such information

from public disclosure. Any such application must include a full statement

of the reasons on the basis of which it is claimed that the information

is proprietary, and should be prepared so that proprietary information

identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified

period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad

to discuss them with you.

Sincerely,

c

Jguts C. E. Murphy, Chief

U Reactor Construction and

Engineering Support Branch

Enclosures:

1. Appendix A, Notice of Violation

Inspection Report No. 50-364/76-14

cc w/ enc 1:

Mr. R. E. Hollands, Jr., QA Supervisor

P. O. Box U

Ashford, Alabama 36312

l

l

1

o

- - ------__ _ - _ _ _ - _ _ _ - _ _ _ _ _ _ _

_g_