IR 05000382/2021403: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:March 8, 2021
 
==SUBJECT:==
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000382/2021403
 
==Dear Mr. Ferrick:==
On January 28, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Waterford Steam Electric Station, Unit 3. The NRC inspectors discussed the results of this inspection with Mr. Thomas McCaffrey, General Manager of Nuclear Fuels and Analysis, and other members of your staff. The results of this inspection are documented in the enclosed report.
 
No findings or violations of more than minor significance were identified during this inspection.
 
The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
 
Sincerely, Digitally signed by Gregory G. Gregory G. Warnick Warnick Date: 2021.03.08 07:50:16 -06'00'
Greg G. Warnick, Chief Reactor Inspection Branch Division of Nuclear Materials Safety Docket No. 05000382 License No. NPF-38 cc w/o encl: Distribution via LISTSERV ML21063A569 Cover Letter Only: ADAMS: Sensitive Non-Publicly Available Keyword:
SUNSI Review By: JJO Yes No Non-Sensitive Publicly Available NRC-002 OFFICE DNMS/RxIB DRP/A  DNMS/RxIB NAME  JODonnell JDixon  GWarnick SIGNATURE /RA/  /RA/  /RA/
DATE  03/01/2021 03/02/2021  03/03/2021
}}
}}

Latest revision as of 20:17, 19 January 2022

Material Control and Accounting Program, NRC Inspection Report 05000382/2021403 Cover Letter(Public)
ML21063A569
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/08/2021
From: Greg Warnick
NRC Region 4
To: Ferrick J
Entergy Operations
References
IR 2021403
Download: ML21063A569 (3)


Text

March 8, 2021

SUBJECT:

WATERFORD STEAM ELECTRIC STATION, UNIT 3 - MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000382/2021403

Dear Mr. Ferrick:

On January 28, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Waterford Steam Electric Station, Unit 3. The NRC inspectors discussed the results of this inspection with Mr. Thomas McCaffrey, General Manager of Nuclear Fuels and Analysis, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely, Digitally signed by Gregory G. Gregory G. Warnick Warnick Date: 2021.03.08 07:50:16 -06'00'

Greg G. Warnick, Chief Reactor Inspection Branch Division of Nuclear Materials Safety Docket No. 05000382 License No. NPF-38 cc w/o encl: Distribution via LISTSERV ML21063A569 Cover Letter Only: ADAMS: Sensitive Non-Publicly Available Keyword:

SUNSI Review By: JJO Yes No Non-Sensitive Publicly Available NRC-002 OFFICE DNMS/RxIB DRP/A DNMS/RxIB NAME JODonnell JDixon GWarnick SIGNATURE /RA/ /RA/ /RA/

DATE 03/01/2021 03/02/2021 03/03/2021