IR 05000327/1986042: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 1: Line 1:
{{Adams
{{Adams
| number = ML20207T770
| number = ML20213G976
| issue date = 02/26/1987
| issue date = 05/04/1987
| title = Reviews Util 861024 Response,Denying Violation Noted in Insp Repts 50-327/86-42 & 50-328/86-42.Basis for Concluding That Violation Occurred as Stated in 860926 Notice of Violation Encl
| title = Requests Evaluation of Util 861024 & 870406 Denials of Violation 86-42-01 & Unresolved Item 86-42-02 from Insp Repts 50-327/86-42 & 50-328/86-42 Re Environ Qualification of Asco Solenoid Valves
| author name = Zech G
| author name = Zech G
| author affiliation = NRC OFFICE OF SPECIAL PROJECTS
| author affiliation = NRC OFFICE OF SPECIAL PROJECTS
| addressee name = White S
| addressee name = Liaw B
| addressee affiliation = TENNESSEE VALLEY AUTHORITY
| addressee affiliation = NRC OFFICE OF SPECIAL PROJECTS
| docket = 05000327, 05000328
| docket = 05000327, 05000328
| license number =  
| license number =  
| contact person =  
| contact person =  
| document report number = NUDOCS 8703240322
| document report number = TAC-R00110, TAC-R00111, TAC-R110, TAC-R111, NUDOCS 8705190073
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = INTERNAL OR EXTERNAL MEMORANDUM, MEMORANDUMS-CORRESPONDENCE
| page count = 3
| page count = 2
}}
}}


Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:[
{{#Wiki_filter:D$.l uA
  '
  ,. N MAY 0 41987 MEMORANDUM FOR B. D. Liaw, Assistant Director, Technical Review Division of TVA Projects, Office of Special Programs Gary G. Zech, Assistant Director, Inspection Programs,
'
  ~
.
FROM:
  ..      ~
Division of TVA Projects, Office of Special Progre.ms SUBJECT: ASCO SOLEN 0ID VIOLATION 86-42-01
q
  .
      <
Two examples of Violation 86-42-01 were cited in Inspection Report 86-42 pertaining to ASCO solenoid valves (one on seismic qualification, one on environmental qualification). These issues resulted from two unresolved items identified in Inspection Report 85-45 and later reviewed in Inspection Report  '
FEB 2 61987 Tennessee Valley Authority EATTN: Mr. S. A. White Manager of Nuclear Power 6N 38A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Gentlemen:
86-01. These items were upgraded to violations in Inspection Report 86-4 TVA responded to the violation on October 24, 1986, by admitting the first example of 86-42-01 pertaining to the seismic qualification, but denied the second example pertaining to environmental qualification. A request for technical assistance was sent from myself to Brian Grimes on December 5, 1986, to evaluate the environmental qualification issues addressed in Report 86-42 as Violation 86-42-01 and Unresolved Item 86-42-0 George Hubbard evaluated these issues during his inspection reported in Inspection Report 86-70 on December 12, 1986, and addressed these issues in a Grimes memorandum dated January 16, 1987, which concluded that the violation was valid. We issued a response to TVA's denial of October 24, 1986, based on the January 16, 1987, Grimes' memorandum refuting TVA's denial an February 26, 1987 TVA on April 6,1987, again denied the violation. George Hubbard has recently discussed the second denial with TVA. In light of this second denial, please evaluate this EQ issue from a technical standpoint and determine if TVA's denial is valid based on the NRC's EQ polic If you consider that TVA's denial is not valid, please prepare a draft response to TVA that represents how you believe the NRC should respond to this denia It is requested that you respond to this memorandum by May 22, 1987, to support completion of Sequoyah inspection activitie ORIGINAL. SIGNED BY
SUBJECT: REPORT NOS. 50-327/86-42 AND 50-328/86-42 We have completed our evaluation of your October 24, 1986, response to our Notice of Violation issued on September 26, 1986, concerning activities at your Sequoyah facilit After careful review of the basis for your denial of Violation 50-327,328/
,   KENNET" 9 VRR
86-42-01 (Example 2), we have concluded, for the reasons presented in the enclosure to this letter, the violation occurred as stated in the Notice of Violatio Therefore, pursuant to 10 CFR 2.201, please submit to this office within 30 days of the date of this letter, a written statement describing the reasons for the violation, the corrective steps which have been taken and the results achieved, corrective steps which will be taken to avoid further violations, and the date when full compliance will be achieve In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosure will be placed in the NRC's Public Document Roo The response directed by this letter is not subject to the clearance procedure for the Office of Management and Budget issued under the Paperwork Reduction Act of 1980, PL 96-51
    'l M Gary G. Zech


Sincerely, ORIGINAL SIGNED BY GARY G. ZECH Gary G. Zech, Assistant Director TVA Projects Division Office of Special Projects ccy w/ encl:
Enclosures: Inspection Report 86-42 TVA first denial      . Grimes memorandum RII response to TVA TVA second denial
S. L. Abercrombie, Site Director Sequoyah Nuclear Plant cR'. W. Cantrell, Acting Director Nuclear Engineering I L. Gridley, Director Nuclear Safety and Licensing vd R. Harding, Site Licensing Manager 8703240322 870226 PDR ADOCK 05000327 O  PDR ll1 M cj
,
l cc w/o encls: (See page 2)
!
B705190073 870504 PDR ADOCK 05000327 G  PDR
  '
    '
_ - - _ . - - _ - - , . - _ - , _ - _ - _ _ - _
I


_ -- ----_---- -
,
      ,
c .. %
d e
B. D. Liaw    2   AIAY 0 41967
E5L .Io 357 ENCLOSURE Your denial of Violation 50-327,328/86-42-01 (Example 2), is based on the grounds that the work instructions used for installation of the solenoid valves were adequate; however, this is questionable in light of the fact that the vendor bulletin (not pr.rt of the installation package) for the ASCO model 8316 valves for nuclear power plants, documents that the four valve bonnet (end plate) screws have torque values of 95 plus or minus 10 inch pounds in a crisscross manne Since the vendor was specific with regard to torquing values and the tightening pattern for the bonnet screws, these items are considered significant and should be followed. In addition, it is understood from informal discussions with Sequoyah that they have actually gone back arid tightened the bolts to the vendor value You further state that the environmental qualification of the valve was not affected by the reconfiguration of the mounting support as performed under work package 11806, since the area of the valve that would have been affected by the improper installation of the bolts is internally isolated from the portion of the solenoid valve which contains that electric coil. Since the valve is environmentally qualified as a whole device, this argument is considered not applicable to the situatio In fact, in a letter to Dr. J. Nelson Grace, RII Administrator, from R. L. Gridley, Director, Nuclear safety and Licensing, Subject: Watts Bac Nuclear Plant Units 1 and 2 - Improperly Installed Solenoid Valves - WBRD-50-390/85-52, WBRD-50-391/85-14 - Final Report, dated May 2, 1986, TVA states that ASCO solenoid valves are supplied to them as a complete qualified package with supplier-imposed instructions which must be followed to ensure that their application in the plant conforms with qualification tests. The position taken in this letter seems to be contrary to the TVA Sequoyah position taken in the denial of the violation. The NRC concurs with the original TVA position dated May 2,1986, and disagrees with the Sequoyah position that the environ-mental qualification of the valves was not degraded. We, therefore, believe the violation occurred as state T !. .;r
  .
.
cc w/o encis:
Tennessee Valley Authority 2
  /H. L.'Abercrombie, Site Director        >
'bcc w/ enc 1:
pk Keppler,. OSP Ebneter, OSP
. Zwolinski, OSP Liaw, OSP
-
  '
  '
R. Connelly, OIA
  .Sequoyah Nuclear Plant
.:P. Barr, RII INRC Resident Inspector NRC Document Control Desk State of Tennessee
  / A. Kirkebo, Acting Director, t .d.NuclearEngineering
  'L. Gridley, Director Nuclear Safety and Licensing
  /M. R. Harding, Site Licensing Manager bec w/o encls:
  /). G. Keppler, OSP
  /S. D. Ebneter, OSP
  /J.A.Zwolinski,OSP
  /S. D. Richardson, OSP
  /S. R. . Connelly, OIA K. P. Barr, OSP/RII yNRCResidentInspector-NRC Document Control Desk State of Tennessee
        .e
:
:
i'
!
l i
            .
i-
L
!
$
d 2/N/87 2ht/87 A 2G/87
L
:  -OSP/RII  'OSP/R-  05?/RII  -
JBA JBrady  FMc' Coy
    ' -
K
        %r 4/rt/87 4/30/87   4 y B7
:
  . _ , _ . . . . - _ _ . . _ _ , _ . _ _ , . _ _ . _ , _ _ _ _ _ _ , . ., _ _,._.___ _ _ ___ __,_,_ _ __, _ _ . _ _ , _ , .__ ,__
. - . . _ - . _ - ~ _ .-      _
_
_
}}
}}

Revision as of 22:50, 19 January 2021

Requests Evaluation of Util 861024 & 870406 Denials of Violation 86-42-01 & Unresolved Item 86-42-02 from Insp Repts 50-327/86-42 & 50-328/86-42 Re Environ Qualification of Asco Solenoid Valves
ML20213G976
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/04/1987
From: Zech G
NRC OFFICE OF SPECIAL PROJECTS
To: Liaw B
NRC OFFICE OF SPECIAL PROJECTS
References
TAC-R00110, TAC-R00111, TAC-R110, TAC-R111, NUDOCS 8705190073
Download: ML20213G976 (2)


Text

D$.l uA

,. N MAY 0 41987 MEMORANDUM FOR B. D. Liaw, Assistant Director, Technical Review Division of TVA Projects, Office of Special Programs Gary G. Zech, Assistant Director, Inspection Programs,

~

FROM:

Division of TVA Projects, Office of Special Progre.ms SUBJECT: ASCO SOLEN 0ID VIOLATION 86-42-01

.

Two examples of Violation 86-42-01 were cited in Inspection Report 86-42 pertaining to ASCO solenoid valves (one on seismic qualification, one on environmental qualification). These issues resulted from two unresolved items identified in Inspection Report 85-45 and later reviewed in Inspection Report '

86-01. These items were upgraded to violations in Inspection Report 86-4 TVA responded to the violation on October 24, 1986, by admitting the first example of 86-42-01 pertaining to the seismic qualification, but denied the second example pertaining to environmental qualification. A request for technical assistance was sent from myself to Brian Grimes on December 5, 1986, to evaluate the environmental qualification issues addressed in Report 86-42 as Violation 86-42-01 and Unresolved Item 86-42-0 George Hubbard evaluated these issues during his inspection reported in Inspection Report 86-70 on December 12, 1986, and addressed these issues in a Grimes memorandum dated January 16, 1987, which concluded that the violation was valid. We issued a response to TVA's denial of October 24, 1986, based on the January 16, 1987, Grimes' memorandum refuting TVA's denial an February 26, 1987 TVA on April 6,1987, again denied the violation. George Hubbard has recently discussed the second denial with TVA. In light of this second denial, please evaluate this EQ issue from a technical standpoint and determine if TVA's denial is valid based on the NRC's EQ polic If you consider that TVA's denial is not valid, please prepare a draft response to TVA that represents how you believe the NRC should respond to this denia It is requested that you respond to this memorandum by May 22, 1987, to support completion of Sequoyah inspection activitie ORIGINAL. SIGNED BY

, KENNET" 9 VRR

'l M Gary G. Zech

Enclosures: Inspection Report 86-42 TVA first denial . Grimes memorandum RII response to TVA TVA second denial

,

l cc w/o encls: (See page 2)

!

B705190073 870504 PDR ADOCK 05000327 G PDR

'

'

_ - - _ . - - _ - - , . - _ - , _ - _ - _ _ - _

I

,

c .. %

B. D. Liaw 2 AIAY 0 41967

.

cc w/o encis:

/H. L.'Abercrombie, Site Director >

'

.Sequoyah Nuclear Plant

/ A. Kirkebo, Acting Director, t .d.NuclearEngineering

'L. Gridley, Director Nuclear Safety and Licensing

/M. R. Harding, Site Licensing Manager bec w/o encls:

/). G. Keppler, OSP

/S. D. Ebneter, OSP

/J.A.Zwolinski,OSP

/S. D. Richardson, OSP

/S. R. . Connelly, OIA K. P. Barr, OSP/RII yNRCResidentInspector-NRC Document Control Desk State of Tennessee

.e

!

.

L

$

L

-OSP/RII 'OSP/R- 05?/RII -

JBA JBrady FMc' Coy

' -

K

%r 4/rt/87 4/30/87 4 y B7

. _ , _ . . . . - _ _ . . _ _ , _ . _ _ , . _ _ . _ , _ _ _ _ _ _ , . ., _ _,._.___ _ _ ___ __,_,_ _ __, _ _ . _ _ , _ , .__ ,__

. - . . _ - . _ - ~ _ .- _

_

_