Line 1: |
Line 1: |
| {{Adams | | {{Adams |
| | number = ML20207T770 | | | number = ML20213G976 |
| | issue date = 02/26/1987 | | | issue date = 05/04/1987 |
| | title = Reviews Util 861024 Response,Denying Violation Noted in Insp Repts 50-327/86-42 & 50-328/86-42.Basis for Concluding That Violation Occurred as Stated in 860926 Notice of Violation Encl | | | title = Requests Evaluation of Util 861024 & 870406 Denials of Violation 86-42-01 & Unresolved Item 86-42-02 from Insp Repts 50-327/86-42 & 50-328/86-42 Re Environ Qualification of Asco Solenoid Valves |
| | author name = Zech G | | | author name = Zech G |
| | author affiliation = NRC OFFICE OF SPECIAL PROJECTS | | | author affiliation = NRC OFFICE OF SPECIAL PROJECTS |
| | addressee name = White S | | | addressee name = Liaw B |
| | addressee affiliation = TENNESSEE VALLEY AUTHORITY | | | addressee affiliation = NRC OFFICE OF SPECIAL PROJECTS |
| | docket = 05000327, 05000328 | | | docket = 05000327, 05000328 |
| | license number = | | | license number = |
| | contact person = | | | contact person = |
| | document report number = NUDOCS 8703240322 | | | document report number = TAC-R00110, TAC-R00111, TAC-R110, TAC-R111, NUDOCS 8705190073 |
| | document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE | | | document type = INTERNAL OR EXTERNAL MEMORANDUM, MEMORANDUMS-CORRESPONDENCE |
| | page count = 3 | | | page count = 2 |
| }} | | }} |
|
| |
|
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:[ | | {{#Wiki_filter:D$.l uA |
| ' | | ,. N MAY 0 41987 MEMORANDUM FOR B. D. Liaw, Assistant Director, Technical Review Division of TVA Projects, Office of Special Programs Gary G. Zech, Assistant Director, Inspection Programs, |
| '
| | ~ |
| . | | FROM: |
| .. ~ | | Division of TVA Projects, Office of Special Progre.ms SUBJECT: ASCO SOLEN 0ID VIOLATION 86-42-01 |
| q
| | . |
| <
| | Two examples of Violation 86-42-01 were cited in Inspection Report 86-42 pertaining to ASCO solenoid valves (one on seismic qualification, one on environmental qualification). These issues resulted from two unresolved items identified in Inspection Report 85-45 and later reviewed in Inspection Report ' |
| FEB 2 61987 Tennessee Valley Authority EATTN: Mr. S. A. White Manager of Nuclear Power 6N 38A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Gentlemen:
| | 86-01. These items were upgraded to violations in Inspection Report 86-4 TVA responded to the violation on October 24, 1986, by admitting the first example of 86-42-01 pertaining to the seismic qualification, but denied the second example pertaining to environmental qualification. A request for technical assistance was sent from myself to Brian Grimes on December 5, 1986, to evaluate the environmental qualification issues addressed in Report 86-42 as Violation 86-42-01 and Unresolved Item 86-42-0 George Hubbard evaluated these issues during his inspection reported in Inspection Report 86-70 on December 12, 1986, and addressed these issues in a Grimes memorandum dated January 16, 1987, which concluded that the violation was valid. We issued a response to TVA's denial of October 24, 1986, based on the January 16, 1987, Grimes' memorandum refuting TVA's denial an February 26, 1987 TVA on April 6,1987, again denied the violation. George Hubbard has recently discussed the second denial with TVA. In light of this second denial, please evaluate this EQ issue from a technical standpoint and determine if TVA's denial is valid based on the NRC's EQ polic If you consider that TVA's denial is not valid, please prepare a draft response to TVA that represents how you believe the NRC should respond to this denia It is requested that you respond to this memorandum by May 22, 1987, to support completion of Sequoyah inspection activitie ORIGINAL. SIGNED BY |
| SUBJECT: REPORT NOS. 50-327/86-42 AND 50-328/86-42 We have completed our evaluation of your October 24, 1986, response to our Notice of Violation issued on September 26, 1986, concerning activities at your Sequoyah facilit After careful review of the basis for your denial of Violation 50-327,328/
| | , KENNET" 9 VRR |
| 86-42-01 (Example 2), we have concluded, for the reasons presented in the enclosure to this letter, the violation occurred as stated in the Notice of Violatio Therefore, pursuant to 10 CFR 2.201, please submit to this office within 30 days of the date of this letter, a written statement describing the reasons for the violation, the corrective steps which have been taken and the results achieved, corrective steps which will be taken to avoid further violations, and the date when full compliance will be achieve In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosure will be placed in the NRC's Public Document Roo The response directed by this letter is not subject to the clearance procedure for the Office of Management and Budget issued under the Paperwork Reduction Act of 1980, PL 96-51 | | 'l M Gary G. Zech |
|
| |
|
| Sincerely, ORIGINAL SIGNED BY GARY G. ZECH Gary G. Zech, Assistant Director TVA Projects Division Office of Special Projects ccy w/ encl:
| | Enclosures: Inspection Report 86-42 TVA first denial . Grimes memorandum RII response to TVA TVA second denial |
| S. L. Abercrombie, Site Director Sequoyah Nuclear Plant cR'. W. Cantrell, Acting Director Nuclear Engineering I L. Gridley, Director Nuclear Safety and Licensing vd R. Harding, Site Licensing Manager 8703240322 870226 PDR ADOCK 05000327 O PDR ll1 M cj
| | , |
| | l cc w/o encls: (See page 2) |
| | ! |
| | B705190073 870504 PDR ADOCK 05000327 G PDR |
| | ' |
| | ' |
| | _ - - _ . - - _ - - , . - _ - , _ - _ - _ _ - _ |
| | I |
|
| |
|
| _ -- ----_---- -
| | , |
| ,
| | c .. % |
| d e
| | B. D. Liaw 2 AIAY 0 41967 |
| E5L .Io 357 ENCLOSURE Your denial of Violation 50-327,328/86-42-01 (Example 2), is based on the grounds that the work instructions used for installation of the solenoid valves were adequate; however, this is questionable in light of the fact that the vendor bulletin (not pr.rt of the installation package) for the ASCO model 8316 valves for nuclear power plants, documents that the four valve bonnet (end plate) screws have torque values of 95 plus or minus 10 inch pounds in a crisscross manne Since the vendor was specific with regard to torquing values and the tightening pattern for the bonnet screws, these items are considered significant and should be followed. In addition, it is understood from informal discussions with Sequoyah that they have actually gone back arid tightened the bolts to the vendor value You further state that the environmental qualification of the valve was not affected by the reconfiguration of the mounting support as performed under work package 11806, since the area of the valve that would have been affected by the improper installation of the bolts is internally isolated from the portion of the solenoid valve which contains that electric coil. Since the valve is environmentally qualified as a whole device, this argument is considered not applicable to the situatio In fact, in a letter to Dr. J. Nelson Grace, RII Administrator, from R. L. Gridley, Director, Nuclear safety and Licensing, Subject: Watts Bac Nuclear Plant Units 1 and 2 - Improperly Installed Solenoid Valves - WBRD-50-390/85-52, WBRD-50-391/85-14 - Final Report, dated May 2, 1986, TVA states that ASCO solenoid valves are supplied to them as a complete qualified package with supplier-imposed instructions which must be followed to ensure that their application in the plant conforms with qualification tests. The position taken in this letter seems to be contrary to the TVA Sequoyah position taken in the denial of the violation. The NRC concurs with the original TVA position dated May 2,1986, and disagrees with the Sequoyah position that the environ-mental qualification of the valves was not degraded. We, therefore, believe the violation occurred as state T !. .;r
| | . |
| .
| | cc w/o encis: |
| Tennessee Valley Authority 2
| | /H. L.'Abercrombie, Site Director > |
| 'bcc w/ enc 1:
| |
| pk Keppler,. OSP Ebneter, OSP
| |
| . Zwolinski, OSP Liaw, OSP
| |
| -
| |
| ' | | ' |
| R. Connelly, OIA | | .Sequoyah Nuclear Plant |
| .:P. Barr, RII INRC Resident Inspector NRC Document Control Desk State of Tennessee
| | / A. Kirkebo, Acting Director, t .d.NuclearEngineering |
| | 'L. Gridley, Director Nuclear Safety and Licensing |
| | /M. R. Harding, Site Licensing Manager bec w/o encls: |
| | /). G. Keppler, OSP |
| | /S. D. Ebneter, OSP |
| | /J.A.Zwolinski,OSP |
| | /S. D. Richardson, OSP |
| | /S. R. . Connelly, OIA K. P. Barr, OSP/RII yNRCResidentInspector-NRC Document Control Desk State of Tennessee |
| | .e |
| : | | : |
| i'
| | ! |
| l i
| | . |
| i-
| | L |
| !
| | $ |
| d 2/N/87 2ht/87 A 2G/87
| | L |
| | : -OSP/RII 'OSP/R- 05?/RII - |
| | JBA JBrady FMc' Coy |
| | ' - |
| | K |
| | %r 4/rt/87 4/30/87 4 y B7 |
| | : |
| | . _ , _ . . . . - _ _ . . _ _ , _ . _ _ , . _ _ . _ , _ _ _ _ _ _ , . ., _ _,._.___ _ _ ___ __,_,_ _ __, _ _ . _ _ , _ , .__ ,__ |
| | . - . . _ - . _ - ~ _ .- _ |
| | _ |
| | _ |
| }} | | }} |
|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20211P4961999-09-0909 September 1999 Revised Notification of 990916 Meeting with Tva.Meeting Will Be Closed to Public Due to Proprietary Info Contained in Westinghouse TR WCAP-15128 to Be Discussed ML20211H7841999-08-31031 August 1999 Notification of 990916 Meeting with Util in Rockville,Md to Discuss TVA Intent to Aply for License Amend to Use Alternate Steam Generator Repair Criteria for Stress Corrosion Cracking Evaluated in W TR WCAP-15128 ML20210F6981999-07-27027 July 1999 Discusses 990430 Request for Waiver of 10CFR170 Fees for Certain Insp Efforts Re NRR Pilot Regulatory Oversight Program.Determined That Thirteen Plants in Pilot Program Will Be Exempted from 10CFR170 Fees for Insp Efforts ML20210G9951999-07-20020 July 1999 Discusses 990628 Meeting Re New NRC Reactor Insp & Oversight Process.List of Attendees & Matl Used in Presentation Enclosed ML20196H8491999-06-28028 June 1999 Forwards June 1999 Performance Indicator (PI) Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Constitutes Second Monthly PI Data Submittal from Pilot Plant Licensees,Which Includes Data Through May 1999 ML20207A4771999-05-18018 May 1999 Notification of 990629 Meeting with Util in Rockville,Md to Discuss long-range Planning with Regard to Dry Storage of Sf at Sequoyah Site ML20206M0061999-05-12012 May 1999 Notification of 990616 Meeting with TVA in Rockville,Md to Discuss long-range Planning with Regard to SG Replacement.Draft Agenda Encl ML20210F7021999-04-30030 April 1999 Requests Waiver of Fees for Thirteen Dockets That Compromise Plant Population for NRR Pilot Regulatory Oversight Program. Purposes of Pilot Program Described in Commission Papers SECY-99-007 & SECY-99-007A ML20207M6711999-03-12012 March 1999 Forwards Operator Licensing Exam Repts 50-327/98-302 & 50-328/98-302 Administered on 980928-1001,with as Given Written Exam Encl ML20204B5541999-03-12012 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980928-1001 ML20196H1561998-12-0303 December 1998 Notification of 981215 Meeting with TVA in Rockville,Md to Discuss Current & Future Licensing Activities ML20151X3091998-09-11011 September 1998 Notification of 980930 Meeting with Util in Rockville,Md to Discuss License Amend Request for Extending Sequoyah Emergency Diesel Generator Allowed Outage Time from 3 Days to 7 Days ML20237D4351998-08-21021 August 1998 Notification of 980901 Meeting W/Util in Rockville,Md to Discuss Planned SG Insp During Sequoyah Unit 1 Cycle 7 Refueling Outage in September 1998 ML20236X7041998-06-22022 June 1998 Notification of 980714 Meeting W/Tva in Rockville,Md to Discuss Status of Current Licensing Activities Re Sequoyah Nuclear Plant.Meeting Replaces Meeting W/Tva Scheduled for 980715 ML20249B7451998-06-19019 June 1998 Notification of 980708 Meeting W/Util in Rockville,Md to Discuss NRC Review of Installation of Lead Use Assemblies Containing U-236 Into Plant Core ML20249B7391998-06-19019 June 1998 Notification of 980715 Meeting W/Util in Rockville,Md to Discuss Status of Current Licensing Activities Re Plant ML20216B7171998-05-0707 May 1998 Notification of 980514 Meeting W/Util in Rockville,Md to Discuss NRC RAI Re TS Change Request to Extend Emergency Diesel Generator Allowed Outage Time from 3 Days to 7 Days ML20236N6021998-02-25025 February 1998 Responds to 980203 Memo Requesting Assistance in Responding to Operator License Appeal.Ts Branch Concurred in Interpretation ML20203K3261998-02-19019 February 1998 Revised Notification of 980305 Meeting W/Tvs in Rockville, Md.Meeting Being Held at Request of Utility to Discuss Special Project Being Pursued W/Doe,Use of Downblended Highly Enriched U in Fuel Used at Sequoyah Nuclear Plant ML20202D1571998-02-12012 February 1998 Requests That Encl Documents Be Placed on Docket for Sequoyah,Units 1 & 2 & in PDRs for Plant ML20202C5291998-02-11011 February 1998 Requests That Encl Documents Be Placed on Docket & in PDRs for Plant ML20202D1681998-02-11011 February 1998 Discusses MOV Terminal Voltage Issue,Per GL 98-10 Program at Plant.Concludes That Licensee Approach for Determining Operating Voltage for safety-related Movs,Acceptable ML20203A0311998-02-0505 February 1998 Notification of 980305 Meeting W/Tva in Rockville,Md to Discuss Special Projects Being Pursued W/Doe Including Use of Downblended Highly Enriched U in Fuel Used at Plant ML20236N5961997-12-31031 December 1997 Responds to Request for Technical Assistance (TIA 97-019) Re Interpretation of Intent of Sequoyah Nuclear Plant TS 4.10.3.2 ML20203B2651997-12-0303 December 1997 Notification of Meeting W/Tva on 971218 in Rockville,Md to Discuss Plans to Employ Electrosleeving Process to Repair Minor Cracks in Plants SG ML20202H9991997-12-0303 December 1997 Notification of 971210 Meeting W/Util in Rockville,Md to Discuss Current Licensing Activities Re Plant ML20236N4851997-10-16016 October 1997 Responds to 961016 Memo from Region II Requesting Technical Assistance (TIA 96-017) Re Interpretation of Sequoyah TS 3.2.4 on Quadrant Power Tilt Ratio ML20236N4471997-10-0101 October 1997 Responds to 961003,request from Region II for Technical Assistance Re Interpretation of Sequoyah TS 3/4.3.1, Specifically Items 10 & 11 on Table 3.3-1 ML20217D9131997-09-25025 September 1997 Notifies of 971002 Meeting W/Tva in Rockville,Md to Discuss Plans to Employ an Electrosleeving Process to Repair Minor Cracks in Plant SG ML20217P3451997-08-20020 August 1997 Notification of Licensee Meeting W/Util in Rockville,Md to Discuss Test Methods Used & Results of Plant Unit 1 SG Tube Insp Conducted in Apr 1997.Time & Meeting Room Changed ML20210K3301997-08-15015 August 1997 Notification of 970822 Meeting W/Util in Rockville,Md to Discuss Test Methods Used & Results of Plant,Unit 1 SG Tube Insp Conducted in Apr 1997 ML20205M3331997-07-28028 July 1997 Provides Final Agenda for Region II Enforcement Meeting to Be Held on 970730.OI Attendance Requested for Issue Involving Termination of Turkey Point Radwaste Operator Who Failed to Follow Procedure ML20205D9761997-07-0202 July 1997 Ack Receipt of Licensee Response to NOV (SL-IV) on Firewatches (EA 97-092).Licensee Requested That Region II Reconsider Violation as NCV ML20140F6191997-06-11011 June 1997 Forwards Documents Re Snp to Be Placed on Docket & in PDR ML20148F7201997-05-30030 May 1997 Forwards Semiannual Status Rept on Fire Protection Task Action Plan & plant-specific Thermo-Lag Correction Action Programs ML20141K7251997-05-28028 May 1997 Forwards Signed Original of Order Imposing Civil Monetary Penalty (Tva),For Transmittal to Ofc of Fr for Publication. W/O Encl ML20140F6471997-05-0707 May 1997 Forwards P Blanch Comments Re Snp Pressurizer Draindown Event for Review ML20140F6351997-05-0505 May 1997 Forwards P Blanch Comments on TVA Evaluation of 970324 Pressurizer Draindown Event.Disagrees W/Conclusion That TVA Failed to Identify Root Cause ML20138D1481997-04-29029 April 1997 Forwards Documents Re Meetings W/Tva Ig Ofc Concerning Review of TVA Nuclear Employees Concerns Resolution Program. Documents Should Be Forwarded to NRC PDR ML20138B5721997-04-25025 April 1997 Notification of 970502 Meeting W/Util in Rockville,Md to Discuss Methods & Schedule to Be Employed at Plant,Units 1 & 2 to Upgrade Fire Barriers That Contain Thermo-Lag Matl ML20140F4151997-04-25025 April 1997 Notification of 970425 Meeting W/Tva in Rockville,Md to Discuss Methods & Schedule to Be Employed at Plant to Upgrade Fire Barriers That Contain Thermo-Lag Matl.Meeting Cancelled ML20205M1931997-04-14014 April 1997 Informs That Lieberman Offers No Objection to Releasing TVA OI Report 2-96-009 to Licensee & PDR Provided That Report Released in Accordance with Guidance in Section 8.2.4 of Investigative Procedures Manual ML20205E3591997-04-10010 April 1997 Discusses Sequoyah NOV Response Extension.Two Weeks Extension Has Been Granted ML20137F7941997-03-28028 March 1997 Requests Technical Assistance Re Design of AFW Control Sys at Plant ML20137C1841997-03-20020 March 1997 Notification of Upcoming Meeting W/Tva on 970321 in Rockville,Md to Discuss Status of Currently Ongoing Applications for Amend of TS for Plant ML20137A6441997-03-19019 March 1997 Forwards Signed Original of Order Imposing Civil Monetary Penalty (Tva),For Transmittal to Ofc of Fr for Publication ML20135A6471997-02-25025 February 1997 Notification of 970227 Meeting W/Util in Rockville,Md to Discuss Response to NRC Request for Info Re Plant Amend Request 96-01 ML20203C0591997-02-12012 February 1997 Discusses OI Rept 2-96-009 Re Alleged Falsification of Firewatch Journals.Both Individuals Were Subsequently Terminated ML20205D9591997-02-11011 February 1997 Forwards Copy of OI Rept 2-96-009 Issued on 970124 Re Alleged Falsification of Firewatch Journals at Sequoyah Nuclear Plant.Concludes That Both Firewatch Personnel Failed to Patrol All Assigned Areas & Falsified Firewatch Journals ML20133E8681997-01-0909 January 1997 Notification of 970116 Meeting W/Framatome Cogema Fuels in Rockville,Md to Discuss Use of Bwu Critical Heat Flux Correlation at Sequoyah 1999-09-09
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211P4961999-09-0909 September 1999 Revised Notification of 990916 Meeting with Tva.Meeting Will Be Closed to Public Due to Proprietary Info Contained in Westinghouse TR WCAP-15128 to Be Discussed ML20211H7841999-08-31031 August 1999 Notification of 990916 Meeting with Util in Rockville,Md to Discuss TVA Intent to Aply for License Amend to Use Alternate Steam Generator Repair Criteria for Stress Corrosion Cracking Evaluated in W TR WCAP-15128 ML20210F6981999-07-27027 July 1999 Discusses 990430 Request for Waiver of 10CFR170 Fees for Certain Insp Efforts Re NRR Pilot Regulatory Oversight Program.Determined That Thirteen Plants in Pilot Program Will Be Exempted from 10CFR170 Fees for Insp Efforts ML20210G9951999-07-20020 July 1999 Discusses 990628 Meeting Re New NRC Reactor Insp & Oversight Process.List of Attendees & Matl Used in Presentation Enclosed ML20196H8491999-06-28028 June 1999 Forwards June 1999 Performance Indicator (PI) Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Constitutes Second Monthly PI Data Submittal from Pilot Plant Licensees,Which Includes Data Through May 1999 ML20207A4771999-05-18018 May 1999 Notification of 990629 Meeting with Util in Rockville,Md to Discuss long-range Planning with Regard to Dry Storage of Sf at Sequoyah Site ML20206M0061999-05-12012 May 1999 Notification of 990616 Meeting with TVA in Rockville,Md to Discuss long-range Planning with Regard to SG Replacement.Draft Agenda Encl ML20210F7021999-04-30030 April 1999 Requests Waiver of Fees for Thirteen Dockets That Compromise Plant Population for NRR Pilot Regulatory Oversight Program. Purposes of Pilot Program Described in Commission Papers SECY-99-007 & SECY-99-007A ML20204B5541999-03-12012 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980928-1001 ML20207M6711999-03-12012 March 1999 Forwards Operator Licensing Exam Repts 50-327/98-302 & 50-328/98-302 Administered on 980928-1001,with as Given Written Exam Encl ML20196H1561998-12-0303 December 1998 Notification of 981215 Meeting with TVA in Rockville,Md to Discuss Current & Future Licensing Activities ML20151X3091998-09-11011 September 1998 Notification of 980930 Meeting with Util in Rockville,Md to Discuss License Amend Request for Extending Sequoyah Emergency Diesel Generator Allowed Outage Time from 3 Days to 7 Days ML20237D4351998-08-21021 August 1998 Notification of 980901 Meeting W/Util in Rockville,Md to Discuss Planned SG Insp During Sequoyah Unit 1 Cycle 7 Refueling Outage in September 1998 ML20236X7041998-06-22022 June 1998 Notification of 980714 Meeting W/Tva in Rockville,Md to Discuss Status of Current Licensing Activities Re Sequoyah Nuclear Plant.Meeting Replaces Meeting W/Tva Scheduled for 980715 ML20249B7451998-06-19019 June 1998 Notification of 980708 Meeting W/Util in Rockville,Md to Discuss NRC Review of Installation of Lead Use Assemblies Containing U-236 Into Plant Core ML20249B7391998-06-19019 June 1998 Notification of 980715 Meeting W/Util in Rockville,Md to Discuss Status of Current Licensing Activities Re Plant ML20216B7171998-05-0707 May 1998 Notification of 980514 Meeting W/Util in Rockville,Md to Discuss NRC RAI Re TS Change Request to Extend Emergency Diesel Generator Allowed Outage Time from 3 Days to 7 Days ML20236N6021998-02-25025 February 1998 Responds to 980203 Memo Requesting Assistance in Responding to Operator License Appeal.Ts Branch Concurred in Interpretation ML20203K3261998-02-19019 February 1998 Revised Notification of 980305 Meeting W/Tvs in Rockville, Md.Meeting Being Held at Request of Utility to Discuss Special Project Being Pursued W/Doe,Use of Downblended Highly Enriched U in Fuel Used at Sequoyah Nuclear Plant ML20202D1571998-02-12012 February 1998 Requests That Encl Documents Be Placed on Docket for Sequoyah,Units 1 & 2 & in PDRs for Plant ML20202C5291998-02-11011 February 1998 Requests That Encl Documents Be Placed on Docket & in PDRs for Plant ML20202D1681998-02-11011 February 1998 Discusses MOV Terminal Voltage Issue,Per GL 98-10 Program at Plant.Concludes That Licensee Approach for Determining Operating Voltage for safety-related Movs,Acceptable ML20203A0311998-02-0505 February 1998 Notification of 980305 Meeting W/Tva in Rockville,Md to Discuss Special Projects Being Pursued W/Doe Including Use of Downblended Highly Enriched U in Fuel Used at Plant ML20236N5961997-12-31031 December 1997 Responds to Request for Technical Assistance (TIA 97-019) Re Interpretation of Intent of Sequoyah Nuclear Plant TS 4.10.3.2 ML20202H9991997-12-0303 December 1997 Notification of 971210 Meeting W/Util in Rockville,Md to Discuss Current Licensing Activities Re Plant ML20203B2651997-12-0303 December 1997 Notification of Meeting W/Tva on 971218 in Rockville,Md to Discuss Plans to Employ Electrosleeving Process to Repair Minor Cracks in Plants SG ML20236N4851997-10-16016 October 1997 Responds to 961016 Memo from Region II Requesting Technical Assistance (TIA 96-017) Re Interpretation of Sequoyah TS 3.2.4 on Quadrant Power Tilt Ratio ML20236N4471997-10-0101 October 1997 Responds to 961003,request from Region II for Technical Assistance Re Interpretation of Sequoyah TS 3/4.3.1, Specifically Items 10 & 11 on Table 3.3-1 ML20217D9131997-09-25025 September 1997 Notifies of 971002 Meeting W/Tva in Rockville,Md to Discuss Plans to Employ an Electrosleeving Process to Repair Minor Cracks in Plant SG ML20217P3451997-08-20020 August 1997 Notification of Licensee Meeting W/Util in Rockville,Md to Discuss Test Methods Used & Results of Plant Unit 1 SG Tube Insp Conducted in Apr 1997.Time & Meeting Room Changed ML20210K3301997-08-15015 August 1997 Notification of 970822 Meeting W/Util in Rockville,Md to Discuss Test Methods Used & Results of Plant,Unit 1 SG Tube Insp Conducted in Apr 1997 ML20205M3331997-07-28028 July 1997 Provides Final Agenda for Region II Enforcement Meeting to Be Held on 970730.OI Attendance Requested for Issue Involving Termination of Turkey Point Radwaste Operator Who Failed to Follow Procedure ML20205D9761997-07-0202 July 1997 Ack Receipt of Licensee Response to NOV (SL-IV) on Firewatches (EA 97-092).Licensee Requested That Region II Reconsider Violation as NCV ML20140F6191997-06-11011 June 1997 Forwards Documents Re Snp to Be Placed on Docket & in PDR ML20148F7201997-05-30030 May 1997 Forwards Semiannual Status Rept on Fire Protection Task Action Plan & plant-specific Thermo-Lag Correction Action Programs ML20141K7251997-05-28028 May 1997 Forwards Signed Original of Order Imposing Civil Monetary Penalty (Tva),For Transmittal to Ofc of Fr for Publication. W/O Encl ML20140F6471997-05-0707 May 1997 Forwards P Blanch Comments Re Snp Pressurizer Draindown Event for Review ML20140F6351997-05-0505 May 1997 Forwards P Blanch Comments on TVA Evaluation of 970324 Pressurizer Draindown Event.Disagrees W/Conclusion That TVA Failed to Identify Root Cause ML20138D1481997-04-29029 April 1997 Forwards Documents Re Meetings W/Tva Ig Ofc Concerning Review of TVA Nuclear Employees Concerns Resolution Program. Documents Should Be Forwarded to NRC PDR ML20140F4151997-04-25025 April 1997 Notification of 970425 Meeting W/Tva in Rockville,Md to Discuss Methods & Schedule to Be Employed at Plant to Upgrade Fire Barriers That Contain Thermo-Lag Matl.Meeting Cancelled ML20138B5721997-04-25025 April 1997 Notification of 970502 Meeting W/Util in Rockville,Md to Discuss Methods & Schedule to Be Employed at Plant,Units 1 & 2 to Upgrade Fire Barriers That Contain Thermo-Lag Matl ML20205M1931997-04-14014 April 1997 Informs That Lieberman Offers No Objection to Releasing TVA OI Report 2-96-009 to Licensee & PDR Provided That Report Released in Accordance with Guidance in Section 8.2.4 of Investigative Procedures Manual ML20205E3591997-04-10010 April 1997 Discusses Sequoyah NOV Response Extension.Two Weeks Extension Has Been Granted ML20137F7941997-03-28028 March 1997 Requests Technical Assistance Re Design of AFW Control Sys at Plant ML20137C1841997-03-20020 March 1997 Notification of Upcoming Meeting W/Tva on 970321 in Rockville,Md to Discuss Status of Currently Ongoing Applications for Amend of TS for Plant ML20137A6441997-03-19019 March 1997 Forwards Signed Original of Order Imposing Civil Monetary Penalty (Tva),For Transmittal to Ofc of Fr for Publication ML20135A6471997-02-25025 February 1997 Notification of 970227 Meeting W/Util in Rockville,Md to Discuss Response to NRC Request for Info Re Plant Amend Request 96-01 ML20203C0591997-02-12012 February 1997 Discusses OI Rept 2-96-009 Re Alleged Falsification of Firewatch Journals.Both Individuals Were Subsequently Terminated ML20205D9591997-02-11011 February 1997 Forwards Copy of OI Rept 2-96-009 Issued on 970124 Re Alleged Falsification of Firewatch Journals at Sequoyah Nuclear Plant.Concludes That Both Firewatch Personnel Failed to Patrol All Assigned Areas & Falsified Firewatch Journals ML20133E8681997-01-0909 January 1997 Notification of 970116 Meeting W/Framatome Cogema Fuels in Rockville,Md to Discuss Use of Bwu Critical Heat Flux Correlation at Sequoyah 1999-09-09
[Table view] |
Text
D$.l uA
,. N MAY 0 41987 MEMORANDUM FOR B. D. Liaw, Assistant Director, Technical Review Division of TVA Projects, Office of Special Programs Gary G. Zech, Assistant Director, Inspection Programs,
~
FROM:
Division of TVA Projects, Office of Special Progre.ms SUBJECT: ASCO SOLEN 0ID VIOLATION 86-42-01
.
Two examples of Violation 86-42-01 were cited in Inspection Report 86-42 pertaining to ASCO solenoid valves (one on seismic qualification, one on environmental qualification). These issues resulted from two unresolved items identified in Inspection Report 85-45 and later reviewed in Inspection Report '
86-01. These items were upgraded to violations in Inspection Report 86-4 TVA responded to the violation on October 24, 1986, by admitting the first example of 86-42-01 pertaining to the seismic qualification, but denied the second example pertaining to environmental qualification. A request for technical assistance was sent from myself to Brian Grimes on December 5, 1986, to evaluate the environmental qualification issues addressed in Report 86-42 as Violation 86-42-01 and Unresolved Item 86-42-0 George Hubbard evaluated these issues during his inspection reported in Inspection Report 86-70 on December 12, 1986, and addressed these issues in a Grimes memorandum dated January 16, 1987, which concluded that the violation was valid. We issued a response to TVA's denial of October 24, 1986, based on the January 16, 1987, Grimes' memorandum refuting TVA's denial an February 26, 1987 TVA on April 6,1987, again denied the violation. George Hubbard has recently discussed the second denial with TVA. In light of this second denial, please evaluate this EQ issue from a technical standpoint and determine if TVA's denial is valid based on the NRC's EQ polic If you consider that TVA's denial is not valid, please prepare a draft response to TVA that represents how you believe the NRC should respond to this denia It is requested that you respond to this memorandum by May 22, 1987, to support completion of Sequoyah inspection activitie ORIGINAL. SIGNED BY
, KENNET" 9 VRR
'l M Gary G. Zech
Enclosures: Inspection Report 86-42 TVA first denial . Grimes memorandum RII response to TVA TVA second denial
,
l cc w/o encls: (See page 2)
!
B705190073 870504 PDR ADOCK 05000327 G PDR
'
'
_ - - _ . - - _ - - , . - _ - , _ - _ - _ _ - _
I
,
c .. %
B. D. Liaw 2 AIAY 0 41967
.
cc w/o encis:
/H. L.'Abercrombie, Site Director >
'
.Sequoyah Nuclear Plant
/ A. Kirkebo, Acting Director, t .d.NuclearEngineering
'L. Gridley, Director Nuclear Safety and Licensing
/M. R. Harding, Site Licensing Manager bec w/o encls:
/). G. Keppler, OSP
/S. D. Ebneter, OSP
/J.A.Zwolinski,OSP
/S. D. Richardson, OSP
/S. R. . Connelly, OIA K. P. Barr, OSP/RII yNRCResidentInspector-NRC Document Control Desk State of Tennessee
.e
!
.
L
$
L
- -OSP/RII 'OSP/R- 05?/RII -
JBA JBrady FMc' Coy
' -
K
%r 4/rt/87 4/30/87 4 y B7
. _ , _ . . . . - _ _ . . _ _ , _ . _ _ , . _ _ . _ , _ _ _ _ _ _ , . ., _ _,._.___ _ _ ___ __,_,_ _ __, _ _ . _ _ , _ , .__ ,__
. - . . _ - . _ - ~ _ .- _
_
_