Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20211P496 | 9 September 1999 | Revised Notification of 990916 Meeting with Tva.Meeting Will Be Closed to Public Due to Proprietary Info Contained in Westinghouse TR WCAP-15128 to Be Discussed | |
ML20211H784 | 31 August 1999 | Notification of 990916 Meeting with Util in Rockville,Md to Discuss TVA Intent to Aply for License Amend to Use Alternate Steam Generator Repair Criteria for Stress Corrosion Cracking Evaluated in W TR WCAP-15128 | |
ML20210F698 | 27 July 1999 | Discusses 990430 Request for Waiver of 10CFR170 Fees for Certain Insp Efforts Re NRR Pilot Regulatory Oversight Program.Determined That Thirteen Plants in Pilot Program Will Be Exempted from 10CFR170 Fees for Insp Efforts | |
ML20210G995 | 20 July 1999 | Discusses 990628 Meeting Re New NRC Reactor Insp & Oversight Process.List of Attendees & Matl Used in Presentation Enclosed | |
ML20196H849 | 28 June 1999 | Forwards June 1999 Performance Indicator (PI) Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Constitutes Second Monthly PI Data Submittal from Pilot Plant Licensees,Which Includes Data Through May 1999 | |
ML20207A477 | 18 May 1999 | Notification of 990629 Meeting with Util in Rockville,Md to Discuss long-range Planning with Regard to Dry Storage of Sf at Sequoyah Site | |
ML20206M006 | 12 May 1999 | Notification of 990616 Meeting with TVA in Rockville,Md to Discuss long-range Planning with Regard to SG Replacement.Draft Agenda Encl | |
ML20210F702 | 30 April 1999 | Requests Waiver of Fees for Thirteen Dockets That Compromise Plant Population for NRR Pilot Regulatory Oversight Program. Purposes of Pilot Program Described in Commission Papers SECY-99-007 & SECY-99-007A | |
ML20204B554 | 12 March 1999 | Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980928-1001 | Boric Acid High winds Shutdown Margin Loop seal High Radiation Area Job Performance Measure Pressure Boundary Leakage Downpower |
ML20207M671 | 12 March 1999 | Forwards Operator Licensing Exam Repts 50-327/98-302 & 50-328/98-302 Administered on 980928-1001,with as Given Written Exam Encl | |
ML20196H156 | 3 December 1998 | Notification of 981215 Meeting with TVA in Rockville,Md to Discuss Current & Future Licensing Activities | |
ML20151X309 | 11 September 1998 | Notification of 980930 Meeting with Util in Rockville,Md to Discuss License Amend Request for Extending Sequoyah Emergency Diesel Generator Allowed Outage Time from 3 Days to 7 Days | |
ML20237D435 | 21 August 1998 | Notification of 980901 Meeting W/Util in Rockville,Md to Discuss Planned SG Insp During Sequoyah Unit 1 Cycle 7 Refueling Outage in September 1998 | |
ML20236X704 | 22 June 1998 | Notification of 980714 Meeting W/Tva in Rockville,Md to Discuss Status of Current Licensing Activities Re Sequoyah Nuclear Plant.Meeting Replaces Meeting W/Tva Scheduled for 980715 | |
ML20249B745 | 19 June 1998 | Notification of 980708 Meeting W/Util in Rockville,Md to Discuss NRC Review of Installation of Lead Use Assemblies Containing U-236 Into Plant Core | |
ML20249B739 | 19 June 1998 | Notification of 980715 Meeting W/Util in Rockville,Md to Discuss Status of Current Licensing Activities Re Plant | |
ML20216B717 | 7 May 1998 | Notification of 980514 Meeting W/Util in Rockville,Md to Discuss NRC RAI Re TS Change Request to Extend Emergency Diesel Generator Allowed Outage Time from 3 Days to 7 Days | |
ML20236N602 | 25 February 1998 | Responds to 980203 Memo Requesting Assistance in Responding to Operator License Appeal.Ts Branch Concurred in Interpretation | Shutdown Margin |
ML20203K326 | 19 February 1998 | Revised Notification of 980305 Meeting W/Tvs in Rockville, Md.Meeting Being Held at Request of Utility to Discuss Special Project Being Pursued W/Doe,Use of Downblended Highly Enriched U in Fuel Used at Sequoyah Nuclear Plant | |
ML20202D157 | 12 February 1998 | Requests That Encl Documents Be Placed on Docket for Sequoyah,Units 1 & 2 & in PDRs for Plant | |
ML20202C529 | 11 February 1998 | Requests That Encl Documents Be Placed on Docket & in PDRs for Plant | |
ML20202D168 | 11 February 1998 | Discusses MOV Terminal Voltage Issue,Per GL 98-10 Program at Plant.Concludes That Licensee Approach for Determining Operating Voltage for safety-related Movs,Acceptable | |
ML20203A031 | 5 February 1998 | Notification of 980305 Meeting W/Tva in Rockville,Md to Discuss Special Projects Being Pursued W/Doe Including Use of Downblended Highly Enriched U in Fuel Used at Plant | |
ML20236N596 | 31 December 1997 | Responds to Request for Technical Assistance (TIA 97-019) Re Interpretation of Intent of Sequoyah Nuclear Plant TS 4.10.3.2 | Enforcement Discretion |
ML20202H999 | 3 December 1997 | Notification of 971210 Meeting W/Util in Rockville,Md to Discuss Current Licensing Activities Re Plant | |
ML20203B265 | 3 December 1997 | Notification of Meeting W/Tva on 971218 in Rockville,Md to Discuss Plans to Employ Electrosleeving Process to Repair Minor Cracks in Plants SG | |
ML20236N485 | 16 October 1997 | Responds to 961016 Memo from Region II Requesting Technical Assistance (TIA 96-017) Re Interpretation of Sequoyah TS 3.2.4 on Quadrant Power Tilt Ratio | |
ML20236N447 | 1 October 1997 | Responds to 961003,request from Region II for Technical Assistance Re Interpretation of Sequoyah TS 3/4.3.1, Specifically Items 10 & 11 on Table 3.3-1 | |
ML20217D913 | 25 September 1997 | Notifies of 971002 Meeting W/Tva in Rockville,Md to Discuss Plans to Employ an Electrosleeving Process to Repair Minor Cracks in Plant SG | |
ML20217P345 | 20 August 1997 | Notification of Licensee Meeting W/Util in Rockville,Md to Discuss Test Methods Used & Results of Plant Unit 1 SG Tube Insp Conducted in Apr 1997.Time & Meeting Room Changed | |
ML20210K330 | 15 August 1997 | Notification of 970822 Meeting W/Util in Rockville,Md to Discuss Test Methods Used & Results of Plant,Unit 1 SG Tube Insp Conducted in Apr 1997 | |
ML20205M333 | 28 July 1997 | Provides Final Agenda for Region II Enforcement Meeting to Be Held on 970730.OI Attendance Requested for Issue Involving Termination of Turkey Point Radwaste Operator Who Failed to Follow Procedure | Fire Watch Hourly Fire Watch |
ML20205D976 | 2 July 1997 | Ack Receipt of Licensee Response to NOV (SL-IV) on Firewatches (EA 97-092).Licensee Requested That Region II Reconsider Violation as NCV | |
ML20140F619 | 11 June 1997 | Forwards Documents Re Snp to Be Placed on Docket & in PDR | |
ML20148F720 | 30 May 1997 | Forwards Semiannual Status Rept on Fire Protection Task Action Plan & plant-specific Thermo-Lag Correction Action Programs | Safe Shutdown Fire Barrier Exemption Request Fire Protection Program |
ML20141K725 | 28 May 1997 | Forwards Signed Original of Order Imposing Civil Monetary Penalty (Tva),For Transmittal to Ofc of Fr for Publication. W/O Encl | |
ML20140F647 | 7 May 1997 | Forwards P Blanch Comments Re Snp Pressurizer Draindown Event for Review | |
ML20140F635 | 5 May 1997 | Forwards P Blanch Comments on TVA Evaluation of 970324 Pressurizer Draindown Event.Disagrees W/Conclusion That TVA Failed to Identify Root Cause | |
ML20138D148 | 29 April 1997 | Forwards Documents Re Meetings W/Tva Ig Ofc Concerning Review of TVA Nuclear Employees Concerns Resolution Program. Documents Should Be Forwarded to NRC PDR | |
ML20140F415 | 25 April 1997 | Notification of 970425 Meeting W/Tva in Rockville,Md to Discuss Methods & Schedule to Be Employed at Plant to Upgrade Fire Barriers That Contain Thermo-Lag Matl.Meeting Cancelled | Fire Barrier |
ML20138B572 | 25 April 1997 | Notification of 970502 Meeting W/Util in Rockville,Md to Discuss Methods & Schedule to Be Employed at Plant,Units 1 & 2 to Upgrade Fire Barriers That Contain Thermo-Lag Matl | Fire Barrier |
ML20205M193 | 14 April 1997 | Informs That Lieberman Offers No Objection to Releasing TVA OI Report 2-96-009 to Licensee & PDR Provided That Report Released in Accordance with Guidance in Section 8.2.4 of Investigative Procedures Manual | |
ML20205E359 | 10 April 1997 | Discusses Sequoyah NOV Response Extension.Two Weeks Extension Has Been Granted | |
ML20137F794 | 28 March 1997 | Requests Technical Assistance Re Design of AFW Control Sys at Plant | Shutdown Margin |
ML20137C184 | 20 March 1997 | Notification of Upcoming Meeting W/Tva on 970321 in Rockville,Md to Discuss Status of Currently Ongoing Applications for Amend of TS for Plant | |
ML20137A644 | 19 March 1997 | Forwards Signed Original of Order Imposing Civil Monetary Penalty (Tva),For Transmittal to Ofc of Fr for Publication | |
ML20135A647 | 25 February 1997 | Notification of 970227 Meeting W/Util in Rockville,Md to Discuss Response to NRC Request for Info Re Plant Amend Request 96-01 | |
ML20203C059 | 12 February 1997 | Discusses OI Rept 2-96-009 Re Alleged Falsification of Firewatch Journals.Both Individuals Were Subsequently Terminated | |
ML20205D959 | 11 February 1997 | Forwards Copy of OI Rept 2-96-009 Issued on 970124 Re Alleged Falsification of Firewatch Journals at Sequoyah Nuclear Plant.Concludes That Both Firewatch Personnel Failed to Patrol All Assigned Areas & Falsified Firewatch Journals | |
ML20133E868 | 9 January 1997 | Notification of 970116 Meeting W/Framatome Cogema Fuels in Rockville,Md to Discuss Use of Bwu Critical Heat Flux Correlation at Sequoyah |