MONTHYEARML20211P4961999-09-0909 September 1999 Revised Notification of 990916 Meeting with Tva.Meeting Will Be Closed to Public Due to Proprietary Info Contained in Westinghouse TR WCAP-15128 to Be Discussed ML20211H7841999-08-31031 August 1999 Notification of 990916 Meeting with Util in Rockville,Md to Discuss TVA Intent to Aply for License Amend to Use Alternate Steam Generator Repair Criteria for Stress Corrosion Cracking Evaluated in W TR WCAP-15128 ML20210F6981999-07-27027 July 1999 Discusses 990430 Request for Waiver of 10CFR170 Fees for Certain Insp Efforts Re NRR Pilot Regulatory Oversight Program.Determined That Thirteen Plants in Pilot Program Will Be Exempted from 10CFR170 Fees for Insp Efforts ML20210G9951999-07-20020 July 1999 Discusses 990628 Meeting Re New NRC Reactor Insp & Oversight Process.List of Attendees & Matl Used in Presentation Enclosed ML20196H8491999-06-28028 June 1999 Forwards June 1999 Performance Indicator (PI) Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Constitutes Second Monthly PI Data Submittal from Pilot Plant Licensees,Which Includes Data Through May 1999 ML20207A4771999-05-18018 May 1999 Notification of 990629 Meeting with Util in Rockville,Md to Discuss long-range Planning with Regard to Dry Storage of Sf at Sequoyah Site ML20206M0061999-05-12012 May 1999 Notification of 990616 Meeting with TVA in Rockville,Md to Discuss long-range Planning with Regard to SG Replacement.Draft Agenda Encl ML20210F7021999-04-30030 April 1999 Requests Waiver of Fees for Thirteen Dockets That Compromise Plant Population for NRR Pilot Regulatory Oversight Program. Purposes of Pilot Program Described in Commission Papers SECY-99-007 & SECY-99-007A ML20207M6711999-03-12012 March 1999 Forwards Operator Licensing Exam Repts 50-327/98-302 & 50-328/98-302 Administered on 980928-1001,with as Given Written Exam Encl ML20204B5541999-03-12012 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980928-1001 ML20196H1561998-12-0303 December 1998 Notification of 981215 Meeting with TVA in Rockville,Md to Discuss Current & Future Licensing Activities ML20151X3091998-09-11011 September 1998 Notification of 980930 Meeting with Util in Rockville,Md to Discuss License Amend Request for Extending Sequoyah Emergency Diesel Generator Allowed Outage Time from 3 Days to 7 Days ML20237D4351998-08-21021 August 1998 Notification of 980901 Meeting W/Util in Rockville,Md to Discuss Planned SG Insp During Sequoyah Unit 1 Cycle 7 Refueling Outage in September 1998 ML20236X7041998-06-22022 June 1998 Notification of 980714 Meeting W/Tva in Rockville,Md to Discuss Status of Current Licensing Activities Re Sequoyah Nuclear Plant.Meeting Replaces Meeting W/Tva Scheduled for 980715 ML20249B7451998-06-19019 June 1998 Notification of 980708 Meeting W/Util in Rockville,Md to Discuss NRC Review of Installation of Lead Use Assemblies Containing U-236 Into Plant Core ML20249B7391998-06-19019 June 1998 Notification of 980715 Meeting W/Util in Rockville,Md to Discuss Status of Current Licensing Activities Re Plant ML20216B7171998-05-0707 May 1998 Notification of 980514 Meeting W/Util in Rockville,Md to Discuss NRC RAI Re TS Change Request to Extend Emergency Diesel Generator Allowed Outage Time from 3 Days to 7 Days ML20236N6021998-02-25025 February 1998 Responds to 980203 Memo Requesting Assistance in Responding to Operator License Appeal.Ts Branch Concurred in Interpretation ML20203K3261998-02-19019 February 1998 Revised Notification of 980305 Meeting W/Tvs in Rockville, Md.Meeting Being Held at Request of Utility to Discuss Special Project Being Pursued W/Doe,Use of Downblended Highly Enriched U in Fuel Used at Sequoyah Nuclear Plant ML20202D1571998-02-12012 February 1998 Requests That Encl Documents Be Placed on Docket for Sequoyah,Units 1 & 2 & in PDRs for Plant ML20202C5291998-02-11011 February 1998 Requests That Encl Documents Be Placed on Docket & in PDRs for Plant ML20202D1681998-02-11011 February 1998 Discusses MOV Terminal Voltage Issue,Per GL 98-10 Program at Plant.Concludes That Licensee Approach for Determining Operating Voltage for safety-related Movs,Acceptable ML20203A0311998-02-0505 February 1998 Notification of 980305 Meeting W/Tva in Rockville,Md to Discuss Special Projects Being Pursued W/Doe Including Use of Downblended Highly Enriched U in Fuel Used at Plant ML20236N5961997-12-31031 December 1997 Responds to Request for Technical Assistance (TIA 97-019) Re Interpretation of Intent of Sequoyah Nuclear Plant TS 4.10.3.2 ML20203B2651997-12-0303 December 1997 Notification of Meeting W/Tva on 971218 in Rockville,Md to Discuss Plans to Employ Electrosleeving Process to Repair Minor Cracks in Plants SG ML20202H9991997-12-0303 December 1997 Notification of 971210 Meeting W/Util in Rockville,Md to Discuss Current Licensing Activities Re Plant ML20236N4851997-10-16016 October 1997 Responds to 961016 Memo from Region II Requesting Technical Assistance (TIA 96-017) Re Interpretation of Sequoyah TS 3.2.4 on Quadrant Power Tilt Ratio ML20236N4471997-10-0101 October 1997 Responds to 961003,request from Region II for Technical Assistance Re Interpretation of Sequoyah TS 3/4.3.1, Specifically Items 10 & 11 on Table 3.3-1 ML20217D9131997-09-25025 September 1997 Notifies of 971002 Meeting W/Tva in Rockville,Md to Discuss Plans to Employ an Electrosleeving Process to Repair Minor Cracks in Plant SG ML20217P3451997-08-20020 August 1997 Notification of Licensee Meeting W/Util in Rockville,Md to Discuss Test Methods Used & Results of Plant Unit 1 SG Tube Insp Conducted in Apr 1997.Time & Meeting Room Changed ML20210K3301997-08-15015 August 1997 Notification of 970822 Meeting W/Util in Rockville,Md to Discuss Test Methods Used & Results of Plant,Unit 1 SG Tube Insp Conducted in Apr 1997 ML20205M3331997-07-28028 July 1997 Provides Final Agenda for Region II Enforcement Meeting to Be Held on 970730.OI Attendance Requested for Issue Involving Termination of Turkey Point Radwaste Operator Who Failed to Follow Procedure ML20205D9761997-07-0202 July 1997 Ack Receipt of Licensee Response to NOV (SL-IV) on Firewatches (EA 97-092).Licensee Requested That Region II Reconsider Violation as NCV ML20140F6191997-06-11011 June 1997 Forwards Documents Re Snp to Be Placed on Docket & in PDR ML20148F7201997-05-30030 May 1997 Forwards Semiannual Status Rept on Fire Protection Task Action Plan & plant-specific Thermo-Lag Correction Action Programs ML20141K7251997-05-28028 May 1997 Forwards Signed Original of Order Imposing Civil Monetary Penalty (Tva),For Transmittal to Ofc of Fr for Publication. W/O Encl ML20140F6471997-05-0707 May 1997 Forwards P Blanch Comments Re Snp Pressurizer Draindown Event for Review ML20140F6351997-05-0505 May 1997 Forwards P Blanch Comments on TVA Evaluation of 970324 Pressurizer Draindown Event.Disagrees W/Conclusion That TVA Failed to Identify Root Cause ML20138D1481997-04-29029 April 1997 Forwards Documents Re Meetings W/Tva Ig Ofc Concerning Review of TVA Nuclear Employees Concerns Resolution Program. Documents Should Be Forwarded to NRC PDR ML20138B5721997-04-25025 April 1997 Notification of 970502 Meeting W/Util in Rockville,Md to Discuss Methods & Schedule to Be Employed at Plant,Units 1 & 2 to Upgrade Fire Barriers That Contain Thermo-Lag Matl ML20140F4151997-04-25025 April 1997 Notification of 970425 Meeting W/Tva in Rockville,Md to Discuss Methods & Schedule to Be Employed at Plant to Upgrade Fire Barriers That Contain Thermo-Lag Matl.Meeting Cancelled ML20205M1931997-04-14014 April 1997 Informs That Lieberman Offers No Objection to Releasing TVA OI Report 2-96-009 to Licensee & PDR Provided That Report Released in Accordance with Guidance in Section 8.2.4 of Investigative Procedures Manual ML20205E3591997-04-10010 April 1997 Discusses Sequoyah NOV Response Extension.Two Weeks Extension Has Been Granted ML20137F7941997-03-28028 March 1997 Requests Technical Assistance Re Design of AFW Control Sys at Plant ML20137C1841997-03-20020 March 1997 Notification of Upcoming Meeting W/Tva on 970321 in Rockville,Md to Discuss Status of Currently Ongoing Applications for Amend of TS for Plant ML20137A6441997-03-19019 March 1997 Forwards Signed Original of Order Imposing Civil Monetary Penalty (Tva),For Transmittal to Ofc of Fr for Publication ML20135A6471997-02-25025 February 1997 Notification of 970227 Meeting W/Util in Rockville,Md to Discuss Response to NRC Request for Info Re Plant Amend Request 96-01 ML20203C0591997-02-12012 February 1997 Discusses OI Rept 2-96-009 Re Alleged Falsification of Firewatch Journals.Both Individuals Were Subsequently Terminated ML20205D9591997-02-11011 February 1997 Forwards Copy of OI Rept 2-96-009 Issued on 970124 Re Alleged Falsification of Firewatch Journals at Sequoyah Nuclear Plant.Concludes That Both Firewatch Personnel Failed to Patrol All Assigned Areas & Falsified Firewatch Journals ML20133E8681997-01-0909 January 1997 Notification of 970116 Meeting W/Framatome Cogema Fuels in Rockville,Md to Discuss Use of Bwu Critical Heat Flux Correlation at Sequoyah 1999-09-09
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211P4961999-09-0909 September 1999 Revised Notification of 990916 Meeting with Tva.Meeting Will Be Closed to Public Due to Proprietary Info Contained in Westinghouse TR WCAP-15128 to Be Discussed ML20211H7841999-08-31031 August 1999 Notification of 990916 Meeting with Util in Rockville,Md to Discuss TVA Intent to Aply for License Amend to Use Alternate Steam Generator Repair Criteria for Stress Corrosion Cracking Evaluated in W TR WCAP-15128 ML20210F6981999-07-27027 July 1999 Discusses 990430 Request for Waiver of 10CFR170 Fees for Certain Insp Efforts Re NRR Pilot Regulatory Oversight Program.Determined That Thirteen Plants in Pilot Program Will Be Exempted from 10CFR170 Fees for Insp Efforts ML20210G9951999-07-20020 July 1999 Discusses 990628 Meeting Re New NRC Reactor Insp & Oversight Process.List of Attendees & Matl Used in Presentation Enclosed ML20196H8491999-06-28028 June 1999 Forwards June 1999 Performance Indicator (PI) Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Constitutes Second Monthly PI Data Submittal from Pilot Plant Licensees,Which Includes Data Through May 1999 ML20207A4771999-05-18018 May 1999 Notification of 990629 Meeting with Util in Rockville,Md to Discuss long-range Planning with Regard to Dry Storage of Sf at Sequoyah Site ML20206M0061999-05-12012 May 1999 Notification of 990616 Meeting with TVA in Rockville,Md to Discuss long-range Planning with Regard to SG Replacement.Draft Agenda Encl ML20210F7021999-04-30030 April 1999 Requests Waiver of Fees for Thirteen Dockets That Compromise Plant Population for NRR Pilot Regulatory Oversight Program. Purposes of Pilot Program Described in Commission Papers SECY-99-007 & SECY-99-007A ML20204B5541999-03-12012 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980928-1001 ML20207M6711999-03-12012 March 1999 Forwards Operator Licensing Exam Repts 50-327/98-302 & 50-328/98-302 Administered on 980928-1001,with as Given Written Exam Encl ML20196H1561998-12-0303 December 1998 Notification of 981215 Meeting with TVA in Rockville,Md to Discuss Current & Future Licensing Activities ML20151X3091998-09-11011 September 1998 Notification of 980930 Meeting with Util in Rockville,Md to Discuss License Amend Request for Extending Sequoyah Emergency Diesel Generator Allowed Outage Time from 3 Days to 7 Days ML20237D4351998-08-21021 August 1998 Notification of 980901 Meeting W/Util in Rockville,Md to Discuss Planned SG Insp During Sequoyah Unit 1 Cycle 7 Refueling Outage in September 1998 ML20236X7041998-06-22022 June 1998 Notification of 980714 Meeting W/Tva in Rockville,Md to Discuss Status of Current Licensing Activities Re Sequoyah Nuclear Plant.Meeting Replaces Meeting W/Tva Scheduled for 980715 ML20249B7451998-06-19019 June 1998 Notification of 980708 Meeting W/Util in Rockville,Md to Discuss NRC Review of Installation of Lead Use Assemblies Containing U-236 Into Plant Core ML20249B7391998-06-19019 June 1998 Notification of 980715 Meeting W/Util in Rockville,Md to Discuss Status of Current Licensing Activities Re Plant ML20216B7171998-05-0707 May 1998 Notification of 980514 Meeting W/Util in Rockville,Md to Discuss NRC RAI Re TS Change Request to Extend Emergency Diesel Generator Allowed Outage Time from 3 Days to 7 Days ML20236N6021998-02-25025 February 1998 Responds to 980203 Memo Requesting Assistance in Responding to Operator License Appeal.Ts Branch Concurred in Interpretation ML20203K3261998-02-19019 February 1998 Revised Notification of 980305 Meeting W/Tvs in Rockville, Md.Meeting Being Held at Request of Utility to Discuss Special Project Being Pursued W/Doe,Use of Downblended Highly Enriched U in Fuel Used at Sequoyah Nuclear Plant ML20202D1571998-02-12012 February 1998 Requests That Encl Documents Be Placed on Docket for Sequoyah,Units 1 & 2 & in PDRs for Plant ML20202C5291998-02-11011 February 1998 Requests That Encl Documents Be Placed on Docket & in PDRs for Plant ML20202D1681998-02-11011 February 1998 Discusses MOV Terminal Voltage Issue,Per GL 98-10 Program at Plant.Concludes That Licensee Approach for Determining Operating Voltage for safety-related Movs,Acceptable ML20203A0311998-02-0505 February 1998 Notification of 980305 Meeting W/Tva in Rockville,Md to Discuss Special Projects Being Pursued W/Doe Including Use of Downblended Highly Enriched U in Fuel Used at Plant ML20236N5961997-12-31031 December 1997 Responds to Request for Technical Assistance (TIA 97-019) Re Interpretation of Intent of Sequoyah Nuclear Plant TS 4.10.3.2 ML20202H9991997-12-0303 December 1997 Notification of 971210 Meeting W/Util in Rockville,Md to Discuss Current Licensing Activities Re Plant ML20203B2651997-12-0303 December 1997 Notification of Meeting W/Tva on 971218 in Rockville,Md to Discuss Plans to Employ Electrosleeving Process to Repair Minor Cracks in Plants SG ML20236N4851997-10-16016 October 1997 Responds to 961016 Memo from Region II Requesting Technical Assistance (TIA 96-017) Re Interpretation of Sequoyah TS 3.2.4 on Quadrant Power Tilt Ratio ML20236N4471997-10-0101 October 1997 Responds to 961003,request from Region II for Technical Assistance Re Interpretation of Sequoyah TS 3/4.3.1, Specifically Items 10 & 11 on Table 3.3-1 ML20217D9131997-09-25025 September 1997 Notifies of 971002 Meeting W/Tva in Rockville,Md to Discuss Plans to Employ an Electrosleeving Process to Repair Minor Cracks in Plant SG ML20217P3451997-08-20020 August 1997 Notification of Licensee Meeting W/Util in Rockville,Md to Discuss Test Methods Used & Results of Plant Unit 1 SG Tube Insp Conducted in Apr 1997.Time & Meeting Room Changed ML20210K3301997-08-15015 August 1997 Notification of 970822 Meeting W/Util in Rockville,Md to Discuss Test Methods Used & Results of Plant,Unit 1 SG Tube Insp Conducted in Apr 1997 ML20205M3331997-07-28028 July 1997 Provides Final Agenda for Region II Enforcement Meeting to Be Held on 970730.OI Attendance Requested for Issue Involving Termination of Turkey Point Radwaste Operator Who Failed to Follow Procedure ML20205D9761997-07-0202 July 1997 Ack Receipt of Licensee Response to NOV (SL-IV) on Firewatches (EA 97-092).Licensee Requested That Region II Reconsider Violation as NCV ML20140F6191997-06-11011 June 1997 Forwards Documents Re Snp to Be Placed on Docket & in PDR ML20148F7201997-05-30030 May 1997 Forwards Semiannual Status Rept on Fire Protection Task Action Plan & plant-specific Thermo-Lag Correction Action Programs ML20141K7251997-05-28028 May 1997 Forwards Signed Original of Order Imposing Civil Monetary Penalty (Tva),For Transmittal to Ofc of Fr for Publication. W/O Encl ML20140F6471997-05-0707 May 1997 Forwards P Blanch Comments Re Snp Pressurizer Draindown Event for Review ML20140F6351997-05-0505 May 1997 Forwards P Blanch Comments on TVA Evaluation of 970324 Pressurizer Draindown Event.Disagrees W/Conclusion That TVA Failed to Identify Root Cause ML20138D1481997-04-29029 April 1997 Forwards Documents Re Meetings W/Tva Ig Ofc Concerning Review of TVA Nuclear Employees Concerns Resolution Program. Documents Should Be Forwarded to NRC PDR ML20140F4151997-04-25025 April 1997 Notification of 970425 Meeting W/Tva in Rockville,Md to Discuss Methods & Schedule to Be Employed at Plant to Upgrade Fire Barriers That Contain Thermo-Lag Matl.Meeting Cancelled ML20138B5721997-04-25025 April 1997 Notification of 970502 Meeting W/Util in Rockville,Md to Discuss Methods & Schedule to Be Employed at Plant,Units 1 & 2 to Upgrade Fire Barriers That Contain Thermo-Lag Matl ML20205M1931997-04-14014 April 1997 Informs That Lieberman Offers No Objection to Releasing TVA OI Report 2-96-009 to Licensee & PDR Provided That Report Released in Accordance with Guidance in Section 8.2.4 of Investigative Procedures Manual ML20205E3591997-04-10010 April 1997 Discusses Sequoyah NOV Response Extension.Two Weeks Extension Has Been Granted ML20137F7941997-03-28028 March 1997 Requests Technical Assistance Re Design of AFW Control Sys at Plant ML20137C1841997-03-20020 March 1997 Notification of Upcoming Meeting W/Tva on 970321 in Rockville,Md to Discuss Status of Currently Ongoing Applications for Amend of TS for Plant ML20137A6441997-03-19019 March 1997 Forwards Signed Original of Order Imposing Civil Monetary Penalty (Tva),For Transmittal to Ofc of Fr for Publication ML20135A6471997-02-25025 February 1997 Notification of 970227 Meeting W/Util in Rockville,Md to Discuss Response to NRC Request for Info Re Plant Amend Request 96-01 ML20203C0591997-02-12012 February 1997 Discusses OI Rept 2-96-009 Re Alleged Falsification of Firewatch Journals.Both Individuals Were Subsequently Terminated ML20205D9591997-02-11011 February 1997 Forwards Copy of OI Rept 2-96-009 Issued on 970124 Re Alleged Falsification of Firewatch Journals at Sequoyah Nuclear Plant.Concludes That Both Firewatch Personnel Failed to Patrol All Assigned Areas & Falsified Firewatch Journals ML20133E8681997-01-0909 January 1997 Notification of 970116 Meeting W/Framatome Cogema Fuels in Rockville,Md to Discuss Use of Bwu Critical Heat Flux Correlation at Sequoyah 1999-09-09
[Table view] |
Text
/
Ftoruary 11, 1998
-NOTE TO: Jim McKnightj Document Control, IRM MS 0-5-D-24 FROMi- Ron Hernan,xDRPE SUBJECT' Docketing of documents received regarding Sequoyah Nuclear Plant Please place the enclosed documents-on the docket for_Sequoyah Units 1 and 2 (Docket Nos._50-327 and 50-328) as=well as in the Public Document Rooms for Sequoyah'. ,
Thank You.
h&- -
Ron Hernan 415-2010 llll11ll)l,1ll1ll av Ge
[yos Ad
, y gnge 1 '- <j l i .
otAN 9902120271 990211 DR ADOCK 050003 7
RQG7L50-317 r 60-3M l& f4 W
[ ..
9
.. 3 l
SEuu0AHd/CEM R W Jt!STIFICATION OF OPERATING VOLTAGES USED IN CIA 910 EVALUATIOMS
%e appeonch that k used by WA la calculedas the mininuup expoeted voltage at the terminals of motor opeented valves (MOV) in GL 49 10 program is as fotbws:
If a MOV le requime to opwate la ausomatie made at onest of an design basis event, the MOV ,'k 4s tenninal vokage is evalmated to ensure that adequase voltage is available when the MOV b required to opwsw ator the S! phase A or B signal. Durlag tie time pened the 161ky othhc power supply is commervativdy assamed to instantaneously drop from its normal opersing voltage of 1651,1ky to 153kv (due to postulated worst onec transedesion eystem contingency) in conjunction with the block starting of all safety tclated loads actushd by the 11 phase A or B alsnal. As a reeuk tbc 6.9hv Shutdown Board vokage will drop to below the degraded voltage seapoint a(6456 vehs to approximately 3850 vohs. %n autrenatic ined tap changers (LTC) on the Common Station Service Transibaners (CSST) will start, afbr a 2 seoemd time delay, boosting the vokaps approaimately 1.25% each second untilthe volta 4e rooovers to within the LTC vokese range of 6997 7107 vahs. The voltage win recowr sufEoiently to reset the dageded vohnge relay S 4 M (6595 voks) wkhis 6 seconds.
For - -- *H (d n .c.r.1 operation) MOV's (such as far FCV 68 332, .333) that may aced to start and operate annt the accident starting transisat is over, the sesady eiste vohage attained due to the autommeic LTC action is utdised to ensure that adequate voltage is available.
De lowest resuhia6 vohns, on any 6.9 Shutdown Board is approaimately 6900 voks which still
{ dtN assuaws ibe 161kv oississ power source at 153ky and results la the CSST 1.TC at its maahnum boost whnge tap of 10%. %e resulting 480v Reactor MOV Board voltages reage from 477 480,7 volts which results in a mininsam terrainal voltage of 429 voks (93% of MOV rating) at any of the FCV 65-332, 333 MOV's.
The approach TVA has taken is consiseest with IEEE 741 1997, "!EEE Standard Criteria fbr the Protnotion of Class IE Power Systems and Equipment la Nuolear Power Generating Stations" Annas A, *11lustration of concepte ===adaW with degraded vehage pecesction", IEEE 741 states
.g mar, =_ ; . - ' he ev-t -*=d.._a or 52 .a the H -7: t m.a nmi power anpply vahama If analysis deternduce that the bue vokage drope into the degraded vohage relay operattag range during a snomastary voltage dip, the vokage must recover above the reset value within the time delay period ' Additionally, analvana magv eq$.ly the eftman af unhage
___.__m .
_a, ,, . _w g ._ ; __
,ad M switched capacitor banks, anchubag their asociated tane delays, to ensure bus voltags recovery following empoeted voltage trenaisess". WA has evaluated at marties moeors at an oNbite power supply voltage of 153ky, which in a hounding mininuun preferred power supply voltasc, and is based on Transmission System Studies (TSS) performed by Transeussion/I'lann6ng Symems, which how been conewvatively perfbemed in nooordnace with the Adlewing oriteria:
- Minimum grid vahase is -1lhi baal ou the worst case ~= hela = of gas Postulated denip basis event plus gas unrelated simultanonue ' ',, g to determine the availability, capacity, and capabihty of the offsite power sources to the nuclear units. The design basis event will always cosaist of an accident in one unit and simahaneous orderly shutdown (not unit trip) of all other units. %is is beesuse the accidest caec will always have the strictest vokaas requiromants in the plant vokage analyses (espealally on the low voltage system). De 1'ro, .. r=, e n r. m n ..m.,n ...... . . . . . ,,,m.......
20*d SalTILPI **** 009-51 X0.*JNdd ** *
]
o CO*d T101
/.
o l
fe'd Nici I
contingsney will be the ces sissle lhilure (or loss) of that part of the transmise6en rystem which gives the worst <. ass results. The selection of contingencies to be conthbred in the l TSS's are in accordance with the suklelines presented in the North Asnerican Electrio i Reliability Council (NERC) standard en Transmission Mahming. t t
e All other transmission system compancate should be opersing nonnally. !
l I it should be noted that the 15hv assumption is wry conservative and wouhl take a pen andstina wentcanc gg, AA a. - '7 v .daia nmc d;w
" ua* -e'=in Unit 2 nlus a ""-
orthe ca= unit to drop to that level, g,g;-l a r; - a7 f .ao.
for a design basis svest plus a simmitaneous worst emme unnsmission systeen caeningency with a i
other ties normal /elooed, the 161kv system voltage would only drop to approximately 1.Hky.
The approach taken by TYA meets the guideliams of the OL #9 10 Action E Question 36, which I
state that " ,licaneses to use the voltage that will be pnsent at the MOV when esterminag its ability of operano under design baens conditions. This actual voltage appled to the MOV at the tims of operataos is onen less than the nominal voltage ratlag t(the MOV. Any volange less than l the nominal ratles is refbreed to se degraded voltage". For the casc of FCV.44 332, .333 the worst same calculated voltage present at tbc MOV at the thne of opastion is approximately 429 volts, which by the GL 89 10 unemsat abow, is at a degraded voltase of 429 volts which is less than l'
the MOV rating of 460 voks. The OL 8910 document does not require showing that the MOV will operses at the degunded vokage soley setpoint, but at the vokage that will be preesset et the tim of operation, whach is the method TVA used.
TVA analyses consavatively used a greatly reduced offsite power supply voltase oil 53kv (which i is only possible due to a pse<xistieg transmission contingency plus a simuhaneous transedesion contingensise all at the same tbne with an sooident in Unk 2 and an orderly shutdown of the other unit). Therefore it is mot sequked to assume additional failures inthe offsiw power alreaks, such as fhilure of tbs LTC's. It should be pointed out that, NRC lospection Report $0 327/94 28 and 30 328/94-28 in 1994 docunwnted a review wiuch found acceptable the methodology for determining the mininuun empeoted offsste vokapa. 7he only OL 89 10 guidshne is to be able to show the capability to start anotors at or below the lowest sxpected pt ftrred power supply wetage.
TVA has eeneervatively met these guidelines fbr the Gl. 89 10 MOV's.
Preparedby: G.L, Nicely 2/9/1994 kW Reviewed b %
' wa -v ww,3. me cie. e ess.t m. ass m.m.. -cnc. 996T/SE/0T t0'd S01114P1 **** 009-51 Xeddred **** OT:PO i
- seone ,
- 480 V RX MOV BD 1B1-B d
VOLTAGE PROFILE FOR SI-PH B
" ~ i 500 i. i
'i .
480y = - '
i t ,
/
460 \ ' / :
\ .
/
440 .
\ .
,r A- ~
g . , ,
/ + - -
420 \ / .
~
\ .
. J' i 400 \
~
5 ~
~
\
Er J .
!. 380 I I I
! i e
i i - - _ .