ML20203C059

From kanterella
Jump to navigation Jump to search
Discusses OI Rept 2-96-009 Re Alleged Falsification of Firewatch Journals.Both Individuals Were Subsequently Terminated
ML20203C059
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 02/12/1997
From: Satorius M
NRC OFFICE OF ENFORCEMENT (OE)
To: Goldberg J, Miraglia F, Reyes L
NRC (Affiliation Not Assigned), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II), NRC OFFICE OF THE GENERAL COUNSEL (OGC)
Shared Package
ML20203B905 List:
References
FOIA-99-76 NUDOCS 9902110168
Download: ML20203C059 (3)


Text

.

- ~ - -

U i

[

Esh g$

\\,

[

UNITED STATES j

j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20666 4 001

\\***] l February 12, 1997 MEMORANDUM T0:

Luis Reyes, Regional Administrator Region II Frank J. Miraglia, Acting Director Office of Nuclear Reactor Regulation Jack R. Goldberg, Deputy Assistant General Counsel for Enforcement Office th Ge 1

1 FROM:

Mark A. Satorius, puty Director Office of Enforcement

SUBJECT:

01 REPORT 2-96-009; RE:

SEQUOYAH, ALLEGED FALSIFICATION OF FIREWATCH JOURNALS The above captioned 0I report involves an allegation that two firewatch personnel failed to patrol their assigned areas and documented the firewatch journals as though they had completed their patrol. Although 01 did not substantiate that the employees' actions were either intentional or willful, the evidence developed substantiates that both individuals failed to patrol their assigned areas and falsified their firewatch journals.

Both individuals j

were subsequently terminated.

Because 01 did not substantiate willfulness, I do not intend to request an OGC analysis of this report or request a multi-office meeting. However, enforcement action may be warranted against the licensee as well as the individuals. Therefore, the region should be prepared to address the enforcement implications associated with the inaccurate information and failure to follow procedures during the regularly scheduled enforcement panel on February 19, 1997.

If your staff cannot support this schedule, please contact Rende Pedersen of my staff at 301-415-2742 as soon as possible.

cc:

E. Jordan, DEDO R. Zimmerman, NRR G. Caputo, 01 F. Hebdon, NRR R. Hernon, NRR LIC DI$' CLOS APPROVAL OF DIRCTOf,.0FFIC,UREJITH0 OT F M F ENFORC j

9902110168 990200 PDR FOIA QUNTE'R99-76 PDR

DISTRIBUTION:

JLieberman, OE MSatorius, OE RPedersen. OE-Day file 01 File 2-96-009 Buryc, RII i

OE (tlAk D:0E N RPedersen JLieberman 02/rL./97 02/td97 i

Doc Name: G:\\SEQUOYAH.RP NOT FOR PUBLIC DISC (0SURE WIT PPROVAL Mig 0FFRE 0,VENFORCEM i

TO: - q'.

/44 y FAX TRANSMITTAL - ONE PAGE ONLY t

e j

t 'A FROM:

//ima 1

(

)

/

1 EA REQUEST & ENFORCEMENT STRATEGY FORM Del Case:

1st Panel:

Post Board / Panel:

Re-Panet:

Post Caucus:

Re-Caucus:

Other: [

EA 'l 7 - 1if IAYS Data Entry Infomation Yoday's Date 3 h 47 Regiour T Case Yype: b n=all Entity /No D Yes Licensee P6(O Facility (Unit)/ Location bt MM80K Dec. No.

D * '2S2 / 5'53 t t Dey of I p.

M/4 M ? '

ID D.se:

D//She ?

Date 01 Ref.:

9l14f4b DI Rpt No.:

)-% 053 oz ape poter l,2 //9 /97 Conference closed 7:

Summary of 1

Feets:

FALs a C n c AT f oM of Fh P vt,Te CTIC O WC T sv Cv ruAN CE i

i har o AAE N T ATioM Inspection Apt Fo.

Keywords for 5LIVs sand NCVan ES:

O

1. EL Sopp Details:

i i

l sL Sopp Detallar SL Supp i

I

- Det.u ls:

2.

Risk Significant Case? O Yes D No:

3.

Prior Escalated Action? O No D Yes EA:

Date:

4.' Lic.ID? D No D Yes / 0 Lic. Credit O No Credit 0 Inad. Info D NA Erplain:

Corrective Action?

O Lic. Credit 0 No Credit D Inad. Info Explain:

6.

Conference Needed?

D No D Yes Explaint 7 CP? D No CP O Base CP O Double Bene CP D Ot.ber:

- s.

Diecretion or Order Needed? O No D Yes Erplein:

s.

WiLifulness involved? D No /Yes /01 Coordinatedr D Needs 01 Coordinatice 10 Program Office Represented? O No D Yeo

11. DOC Represented? D No D Yes!
11. Action? O No violatice O Re panel D Conference Letter D Choice Letter D SL IV NOV D Re-Caucus O Region Issues Esc. Action D Submit to OE for Quick Review 0 Sulmait to DE for Full Paciase Review 0 DEDO Review D Camaission D Disagreement l.

WDther O/ r, ~.M I

A I

v

, \\\\

13. n=mts,

jjf( g u j) g.jgg hm f 2>hfh1

,y 1s, gppro,eg: p--'

Date:

4 iL I t'

// \\\\

Faseds V

>Ib

% \\'

w

/

\\

4

'M' NOT FOR PUBLIC DISCLOSURE WIT +tOUI M ****/ b a... m w

I

-