Responds to 961003,request from Region II for Technical Assistance Re Interpretation of Sequoyah TS 3/4.3.1, Specifically Items 10 & 11 on Table 3.3-1
ML20236N447
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 10/01/1997
From: Hebdon F
NRC (Affiliation Not Assigned)
To: Jerrica Johnson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20236J990 List: ... further results
References
FOIA-98-155 TAC-M97293, NUDOCS 9807150130
Download: ML20236N447 (4)


Text

. _-_ ___ _ _ _ _ _ - _ _ _ _ .

t '

s 331 p""% UNITED STATES a ,

NUCLEAR REGULATORY COMMISSION WAsNING7oN. D.C. Sette et M October 1,1997

\e...* I l

MEMORANDUM TO: Jon R. Johnson, Director Division of Reactor Projects 4 Region ll l

1 FROM: Frederick J. Hebdon, Director Project Directorate ll 3 J Division of Reactor Projects -t/Il Office of Nuclear Reactor Regulation J,l l

SUBJECT:

NRR RESPONSE TO TIA 9618 SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 -INTERPRETATION OF TECHNICAL SPECIFICATION 3/4.3.1 ON PRESSURIZER PRESSURE TRANSMITTERS (TAC NO. M97293)

By memorandum dated October 3,1996, Region 11 requested technical assistance regarding interpretation of Sequoyah Technical Specification (TS) 3/4.3.1,* Reactor Trip Systein Instrumentation,'specifically items 10 and 11 (pressurizer pressure) on Table 3.3-1 (same title). The table requires at least three of four channels to be operable during Modes 1 and 2.

Action 6 in the Action column of the table requires the following:

With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:

s. The inoperable channelis placed in the tripped condition within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />,
b. The Minimum Channels OPERABLE requirement is met [i.e.,3 channels); however, the inoperable channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing of other channels per Specification 4.3.1.1.1.

At Sequoyah, as with other plants designed by Westinghouse, there are only three sets of penetrations in the pressurizer vessel for the purpose of measuring pressurizer level and pressure. Two pressurizer pressure transmitters (PT48 334 and PT48-342C) share a common reference leg, normally kept full by a condensate pot, with the safety related pressurizer jtMal transmitter (LT48-335) and the non-safety-related cold-calibrated pressurizer level transmitter (LT48 321). See Attachment. The other two pressure and level transmitters

, have their own penetrations, sharing a common reference leg. Because of drihing indicated on pressurizer level transmitter 1 LT48 335 on Unit 1, the licensee elected to place one of the two r pressure instruments that share a common reference leg in bypass and the other pressure instrument in trip in order to refill (backfill) the common reference leg. The backfill operation l j was performed with the plant in Mode 1 and was completed within the 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> specified in the ,

TS. The licensee considered the tripped channel to be operable and the bypassed channel to be inoperable. NRR does not disagree with the licensee's determination.

.on illll!!!!!Il!ljll!!,f Oilll NP:C RLE CENTER CGPY 9907150130 980624 /

PDR

(*5RSJ9,8155 FOIA 7 PDR /dd

. J. J:hnson -

l The TIA asks 'Does TS 3.3.1 allow the simultaneous bypassing of one PZR pressure channel and tripping of another PZR pressure channel to perform a corrective maintenance activity i rather than a testing activity?" l NRR has completed its review of this issue a. J has developed the following position with l regard to interpretation of the subject Technical Specification. Although perhaps acceptable l from a reactor safety standpoint, the licensee's action wi s not in comoliance with the Technical Specification as written. Action 6 in Table 3.3-1 specifically allows one channelin bypass when a second channelis inoperable Dnly while performing surveillance testing per Specification

4.3.1.1.1, which in turn refers to Table 4.3-1. This table covers only channel checks, channel l l

calibrations, and channel functional tests, not refilling reference legs, which NRR agrees is corrective maintenance. The licensee would be required to submit, and receive approval of, a Technical Specification amendment to make their actions acceptable. Another questionable l

, aspect of the licensee's rationale is that it is not clear how one channel of pressurizer pressure cou!d be declared inoperable due to the backfilling operation but not the other (i. e., the one that was placed in trip). The backfill operation would affect both channels in the same manner.

If you have any questions regarding the above determination, please contact the Sequoyah Project Manager, Ron Heman, at (301) 415 2010. i Docket No. 50-327 and 50-328 original by F.Hebdon l

Attachment:

Instrument Diagram cc w/attachmer.t; R. Crienjak, Region I W. L. Axelson, Region lli J. Dyer, Region IV Distribution:

Docket File SQN Reading l BBoger JRoe AChaffee MBoylo (e-mail only MLB4) l SBloom (e-mail only SDB1) MOprendek, Region i TLiu, DRPE MShannon, Ril DOCUMENT NAME: P\97293.TIA To receive a ecy, of tnis document. indk:ste in the box C= Copy w/o attachment /endosure E= Copy with riachment/endosure N = No copy

  • See previous concurrence OFFICE PM:PD2 3, 5 1.A:PD2-3 i BC:TSB BQ:HICS 6 D:PD2 0 C DD:hE kDRPg NAME RHeman BClayto WBeckner* J l h el FHebb JZwolinski BB r DATE 9/ 7 9/ 'h/97 9/4/97 l 9/f/97 9/l3 /97 g/ I/97 /97\

OFFICIAL RECORD COPY

i i '

J. Johnson The TIA asks 'Does TS 3.3.1 allow the simultaneous bypassing of one PZR pressure channel

and tripping of another PZR pressure channel to perform a corrective maintenance activity rather than a testing activity?'

NRR has completed its review of this issue and has developed the following position with regard to interpretation of the subject Technical Specifici!M. Although perhaps acceptable from a reactor safety standpoint, the licensee's action was not in comoliance with the Technical Snecificatien as written. Action 6 in Table 3.3-1 specifically allows one channelin bypass when a second channelis inoperable only while performing surveillance testing per Specification 4.3.1.1.1, which in tum refars to Table 4.3-1. This table covers only channel checks, channel calibrations, and channel functional tests, not refilling reference legs, which NRR agrees is corrective maintenance. The licensee would be required to submit, and receive approval of, a Technical Specification amendment to make their actions acceptabloc Another questionable aspect of the licensee's rationale is that it is not clear how one channel of pressurizer pressure .

could be declared inoperable due to the backfilling operation but not the other (i. e., the one that I was placed in trip). The backfill operation would affect both channels in the same manner.

l If you have any questions regarding the above determination, please contact the Sequoyah Project Manager, Ron Heman, at (301) 415-2010. l l

Docket No. 50 327 and 50 328

Attachment:

Instrument Diagram ,

cc w/ attachment: R. Crienjak, Region I W. L. Axelson, Region 111 J. Dyer, Region IV i

l

9 SQN BACKFILLING SENSfMG LINES ON SnitM os 1-PI-IFV-068-443.0 PRESSURIZER PRESSURE AND LEVEL Rev. 0 1 TRANSMITTERS PROTECTION SET II Page 1 of 1

=

s es

. -r 2 asa gpi o

  • "~ cmocaAta mS 33 , , sg

,,,, ,,,, Q ' u'v ";"

s = 0< )V '

g 1.!!!V.4444 3 8 E I.DUY4&d43D A R 3.DMY.46 441DB r/ I y es ( -

h'Y 3 64 444 A TD Wfg1 PRESSURIZER k K

CAAwS g wau ff.

7%

.c. A y K

l.!!!V.48 4449 113tv 48 443C 3.tsty.s4 443D l y,V g88 3.!!!V.46 443F 4 tQty.u-444C E K

l.PT 48 334 3.PT 6g j l l.Lt.64 334

.e L H

.j

, 8.LT.48333

8. DRIV 44 { l.DUY44 {

{ l. DRIV 464440A 4.uiv..i .444 s .u- .as.44:= -

3. .'

l.ORIV48444DB L- 2 H l

as 1

l. DRIV 66444DC [ 1 DR!v48J43DF { gm 5759R/ MIG / jap e

_ _ _ _ . _.