Letter Sequence Other |
---|
|
|
MONTHYEARML20236N4471997-10-0101 October 1997 Responds to 961003,request from Region II for Technical Assistance Re Interpretation of Sequoyah TS 3/4.3.1, Specifically Items 10 & 11 on Table 3.3-1 Project stage: Other 1997-10-01
[Table View] |
|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20211P4961999-09-0909 September 1999 Revised Notification of 990916 Meeting with Tva.Meeting Will Be Closed to Public Due to Proprietary Info Contained in Westinghouse TR WCAP-15128 to Be Discussed ML20211H7841999-08-31031 August 1999 Notification of 990916 Meeting with Util in Rockville,Md to Discuss TVA Intent to Aply for License Amend to Use Alternate Steam Generator Repair Criteria for Stress Corrosion Cracking Evaluated in W TR WCAP-15128 ML20210F6981999-07-27027 July 1999 Discusses 990430 Request for Waiver of 10CFR170 Fees for Certain Insp Efforts Re NRR Pilot Regulatory Oversight Program.Determined That Thirteen Plants in Pilot Program Will Be Exempted from 10CFR170 Fees for Insp Efforts ML20210G9951999-07-20020 July 1999 Discusses 990628 Meeting Re New NRC Reactor Insp & Oversight Process.List of Attendees & Matl Used in Presentation Enclosed ML20196H8491999-06-28028 June 1999 Forwards June 1999 Performance Indicator (PI) Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Constitutes Second Monthly PI Data Submittal from Pilot Plant Licensees,Which Includes Data Through May 1999 ML20207A4771999-05-18018 May 1999 Notification of 990629 Meeting with Util in Rockville,Md to Discuss long-range Planning with Regard to Dry Storage of Sf at Sequoyah Site ML20206M0061999-05-12012 May 1999 Notification of 990616 Meeting with TVA in Rockville,Md to Discuss long-range Planning with Regard to SG Replacement.Draft Agenda Encl ML20210F7021999-04-30030 April 1999 Requests Waiver of Fees for Thirteen Dockets That Compromise Plant Population for NRR Pilot Regulatory Oversight Program. Purposes of Pilot Program Described in Commission Papers SECY-99-007 & SECY-99-007A ML20207M6711999-03-12012 March 1999 Forwards Operator Licensing Exam Repts 50-327/98-302 & 50-328/98-302 Administered on 980928-1001,with as Given Written Exam Encl ML20204B5541999-03-12012 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980928-1001 ML20196H1561998-12-0303 December 1998 Notification of 981215 Meeting with TVA in Rockville,Md to Discuss Current & Future Licensing Activities ML20151X3091998-09-11011 September 1998 Notification of 980930 Meeting with Util in Rockville,Md to Discuss License Amend Request for Extending Sequoyah Emergency Diesel Generator Allowed Outage Time from 3 Days to 7 Days ML20237D4351998-08-21021 August 1998 Notification of 980901 Meeting W/Util in Rockville,Md to Discuss Planned SG Insp During Sequoyah Unit 1 Cycle 7 Refueling Outage in September 1998 ML20236X7041998-06-22022 June 1998 Notification of 980714 Meeting W/Tva in Rockville,Md to Discuss Status of Current Licensing Activities Re Sequoyah Nuclear Plant.Meeting Replaces Meeting W/Tva Scheduled for 980715 ML20249B7451998-06-19019 June 1998 Notification of 980708 Meeting W/Util in Rockville,Md to Discuss NRC Review of Installation of Lead Use Assemblies Containing U-236 Into Plant Core ML20249B7391998-06-19019 June 1998 Notification of 980715 Meeting W/Util in Rockville,Md to Discuss Status of Current Licensing Activities Re Plant ML20216B7171998-05-0707 May 1998 Notification of 980514 Meeting W/Util in Rockville,Md to Discuss NRC RAI Re TS Change Request to Extend Emergency Diesel Generator Allowed Outage Time from 3 Days to 7 Days ML20236N6021998-02-25025 February 1998 Responds to 980203 Memo Requesting Assistance in Responding to Operator License Appeal.Ts Branch Concurred in Interpretation ML20203K3261998-02-19019 February 1998 Revised Notification of 980305 Meeting W/Tvs in Rockville, Md.Meeting Being Held at Request of Utility to Discuss Special Project Being Pursued W/Doe,Use of Downblended Highly Enriched U in Fuel Used at Sequoyah Nuclear Plant ML20202D1571998-02-12012 February 1998 Requests That Encl Documents Be Placed on Docket for Sequoyah,Units 1 & 2 & in PDRs for Plant ML20202C5291998-02-11011 February 1998 Requests That Encl Documents Be Placed on Docket & in PDRs for Plant ML20202D1681998-02-11011 February 1998 Discusses MOV Terminal Voltage Issue,Per GL 98-10 Program at Plant.Concludes That Licensee Approach for Determining Operating Voltage for safety-related Movs,Acceptable ML20203A0311998-02-0505 February 1998 Notification of 980305 Meeting W/Tva in Rockville,Md to Discuss Special Projects Being Pursued W/Doe Including Use of Downblended Highly Enriched U in Fuel Used at Plant ML20236N5961997-12-31031 December 1997 Responds to Request for Technical Assistance (TIA 97-019) Re Interpretation of Intent of Sequoyah Nuclear Plant TS 4.10.3.2 ML20203B2651997-12-0303 December 1997 Notification of Meeting W/Tva on 971218 in Rockville,Md to Discuss Plans to Employ Electrosleeving Process to Repair Minor Cracks in Plants SG ML20202H9991997-12-0303 December 1997 Notification of 971210 Meeting W/Util in Rockville,Md to Discuss Current Licensing Activities Re Plant ML20236N4851997-10-16016 October 1997 Responds to 961016 Memo from Region II Requesting Technical Assistance (TIA 96-017) Re Interpretation of Sequoyah TS 3.2.4 on Quadrant Power Tilt Ratio ML20236N4471997-10-0101 October 1997 Responds to 961003,request from Region II for Technical Assistance Re Interpretation of Sequoyah TS 3/4.3.1, Specifically Items 10 & 11 on Table 3.3-1 ML20217D9131997-09-25025 September 1997 Notifies of 971002 Meeting W/Tva in Rockville,Md to Discuss Plans to Employ an Electrosleeving Process to Repair Minor Cracks in Plant SG ML20217P3451997-08-20020 August 1997 Notification of Licensee Meeting W/Util in Rockville,Md to Discuss Test Methods Used & Results of Plant Unit 1 SG Tube Insp Conducted in Apr 1997.Time & Meeting Room Changed ML20210K3301997-08-15015 August 1997 Notification of 970822 Meeting W/Util in Rockville,Md to Discuss Test Methods Used & Results of Plant,Unit 1 SG Tube Insp Conducted in Apr 1997 ML20205M3331997-07-28028 July 1997 Provides Final Agenda for Region II Enforcement Meeting to Be Held on 970730.OI Attendance Requested for Issue Involving Termination of Turkey Point Radwaste Operator Who Failed to Follow Procedure ML20205D9761997-07-0202 July 1997 Ack Receipt of Licensee Response to NOV (SL-IV) on Firewatches (EA 97-092).Licensee Requested That Region II Reconsider Violation as NCV ML20140F6191997-06-11011 June 1997 Forwards Documents Re Snp to Be Placed on Docket & in PDR ML20148F7201997-05-30030 May 1997 Forwards Semiannual Status Rept on Fire Protection Task Action Plan & plant-specific Thermo-Lag Correction Action Programs ML20141K7251997-05-28028 May 1997 Forwards Signed Original of Order Imposing Civil Monetary Penalty (Tva),For Transmittal to Ofc of Fr for Publication. W/O Encl ML20140F6471997-05-0707 May 1997 Forwards P Blanch Comments Re Snp Pressurizer Draindown Event for Review ML20140F6351997-05-0505 May 1997 Forwards P Blanch Comments on TVA Evaluation of 970324 Pressurizer Draindown Event.Disagrees W/Conclusion That TVA Failed to Identify Root Cause ML20138D1481997-04-29029 April 1997 Forwards Documents Re Meetings W/Tva Ig Ofc Concerning Review of TVA Nuclear Employees Concerns Resolution Program. Documents Should Be Forwarded to NRC PDR ML20138B5721997-04-25025 April 1997 Notification of 970502 Meeting W/Util in Rockville,Md to Discuss Methods & Schedule to Be Employed at Plant,Units 1 & 2 to Upgrade Fire Barriers That Contain Thermo-Lag Matl ML20140F4151997-04-25025 April 1997 Notification of 970425 Meeting W/Tva in Rockville,Md to Discuss Methods & Schedule to Be Employed at Plant to Upgrade Fire Barriers That Contain Thermo-Lag Matl.Meeting Cancelled ML20205M1931997-04-14014 April 1997 Informs That Lieberman Offers No Objection to Releasing TVA OI Report 2-96-009 to Licensee & PDR Provided That Report Released in Accordance with Guidance in Section 8.2.4 of Investigative Procedures Manual ML20205E3591997-04-10010 April 1997 Discusses Sequoyah NOV Response Extension.Two Weeks Extension Has Been Granted ML20137F7941997-03-28028 March 1997 Requests Technical Assistance Re Design of AFW Control Sys at Plant ML20137C1841997-03-20020 March 1997 Notification of Upcoming Meeting W/Tva on 970321 in Rockville,Md to Discuss Status of Currently Ongoing Applications for Amend of TS for Plant ML20137A6441997-03-19019 March 1997 Forwards Signed Original of Order Imposing Civil Monetary Penalty (Tva),For Transmittal to Ofc of Fr for Publication ML20135A6471997-02-25025 February 1997 Notification of 970227 Meeting W/Util in Rockville,Md to Discuss Response to NRC Request for Info Re Plant Amend Request 96-01 ML20203C0591997-02-12012 February 1997 Discusses OI Rept 2-96-009 Re Alleged Falsification of Firewatch Journals.Both Individuals Were Subsequently Terminated ML20205D9591997-02-11011 February 1997 Forwards Copy of OI Rept 2-96-009 Issued on 970124 Re Alleged Falsification of Firewatch Journals at Sequoyah Nuclear Plant.Concludes That Both Firewatch Personnel Failed to Patrol All Assigned Areas & Falsified Firewatch Journals ML20133E8681997-01-0909 January 1997 Notification of 970116 Meeting W/Framatome Cogema Fuels in Rockville,Md to Discuss Use of Bwu Critical Heat Flux Correlation at Sequoyah 1999-09-09
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211P4961999-09-0909 September 1999 Revised Notification of 990916 Meeting with Tva.Meeting Will Be Closed to Public Due to Proprietary Info Contained in Westinghouse TR WCAP-15128 to Be Discussed ML20211H7841999-08-31031 August 1999 Notification of 990916 Meeting with Util in Rockville,Md to Discuss TVA Intent to Aply for License Amend to Use Alternate Steam Generator Repair Criteria for Stress Corrosion Cracking Evaluated in W TR WCAP-15128 ML20210F6981999-07-27027 July 1999 Discusses 990430 Request for Waiver of 10CFR170 Fees for Certain Insp Efforts Re NRR Pilot Regulatory Oversight Program.Determined That Thirteen Plants in Pilot Program Will Be Exempted from 10CFR170 Fees for Insp Efforts ML20210G9951999-07-20020 July 1999 Discusses 990628 Meeting Re New NRC Reactor Insp & Oversight Process.List of Attendees & Matl Used in Presentation Enclosed ML20196H8491999-06-28028 June 1999 Forwards June 1999 Performance Indicator (PI) Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Constitutes Second Monthly PI Data Submittal from Pilot Plant Licensees,Which Includes Data Through May 1999 ML20207A4771999-05-18018 May 1999 Notification of 990629 Meeting with Util in Rockville,Md to Discuss long-range Planning with Regard to Dry Storage of Sf at Sequoyah Site ML20206M0061999-05-12012 May 1999 Notification of 990616 Meeting with TVA in Rockville,Md to Discuss long-range Planning with Regard to SG Replacement.Draft Agenda Encl ML20210F7021999-04-30030 April 1999 Requests Waiver of Fees for Thirteen Dockets That Compromise Plant Population for NRR Pilot Regulatory Oversight Program. Purposes of Pilot Program Described in Commission Papers SECY-99-007 & SECY-99-007A ML20204B5541999-03-12012 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980928-1001 ML20207M6711999-03-12012 March 1999 Forwards Operator Licensing Exam Repts 50-327/98-302 & 50-328/98-302 Administered on 980928-1001,with as Given Written Exam Encl ML20196H1561998-12-0303 December 1998 Notification of 981215 Meeting with TVA in Rockville,Md to Discuss Current & Future Licensing Activities ML20151X3091998-09-11011 September 1998 Notification of 980930 Meeting with Util in Rockville,Md to Discuss License Amend Request for Extending Sequoyah Emergency Diesel Generator Allowed Outage Time from 3 Days to 7 Days ML20237D4351998-08-21021 August 1998 Notification of 980901 Meeting W/Util in Rockville,Md to Discuss Planned SG Insp During Sequoyah Unit 1 Cycle 7 Refueling Outage in September 1998 ML20236X7041998-06-22022 June 1998 Notification of 980714 Meeting W/Tva in Rockville,Md to Discuss Status of Current Licensing Activities Re Sequoyah Nuclear Plant.Meeting Replaces Meeting W/Tva Scheduled for 980715 ML20249B7451998-06-19019 June 1998 Notification of 980708 Meeting W/Util in Rockville,Md to Discuss NRC Review of Installation of Lead Use Assemblies Containing U-236 Into Plant Core ML20249B7391998-06-19019 June 1998 Notification of 980715 Meeting W/Util in Rockville,Md to Discuss Status of Current Licensing Activities Re Plant ML20216B7171998-05-0707 May 1998 Notification of 980514 Meeting W/Util in Rockville,Md to Discuss NRC RAI Re TS Change Request to Extend Emergency Diesel Generator Allowed Outage Time from 3 Days to 7 Days ML20236N6021998-02-25025 February 1998 Responds to 980203 Memo Requesting Assistance in Responding to Operator License Appeal.Ts Branch Concurred in Interpretation ML20203K3261998-02-19019 February 1998 Revised Notification of 980305 Meeting W/Tvs in Rockville, Md.Meeting Being Held at Request of Utility to Discuss Special Project Being Pursued W/Doe,Use of Downblended Highly Enriched U in Fuel Used at Sequoyah Nuclear Plant ML20202D1571998-02-12012 February 1998 Requests That Encl Documents Be Placed on Docket for Sequoyah,Units 1 & 2 & in PDRs for Plant ML20202C5291998-02-11011 February 1998 Requests That Encl Documents Be Placed on Docket & in PDRs for Plant ML20202D1681998-02-11011 February 1998 Discusses MOV Terminal Voltage Issue,Per GL 98-10 Program at Plant.Concludes That Licensee Approach for Determining Operating Voltage for safety-related Movs,Acceptable ML20203A0311998-02-0505 February 1998 Notification of 980305 Meeting W/Tva in Rockville,Md to Discuss Special Projects Being Pursued W/Doe Including Use of Downblended Highly Enriched U in Fuel Used at Plant ML20236N5961997-12-31031 December 1997 Responds to Request for Technical Assistance (TIA 97-019) Re Interpretation of Intent of Sequoyah Nuclear Plant TS 4.10.3.2 ML20202H9991997-12-0303 December 1997 Notification of 971210 Meeting W/Util in Rockville,Md to Discuss Current Licensing Activities Re Plant ML20203B2651997-12-0303 December 1997 Notification of Meeting W/Tva on 971218 in Rockville,Md to Discuss Plans to Employ Electrosleeving Process to Repair Minor Cracks in Plants SG ML20236N4851997-10-16016 October 1997 Responds to 961016 Memo from Region II Requesting Technical Assistance (TIA 96-017) Re Interpretation of Sequoyah TS 3.2.4 on Quadrant Power Tilt Ratio ML20236N4471997-10-0101 October 1997 Responds to 961003,request from Region II for Technical Assistance Re Interpretation of Sequoyah TS 3/4.3.1, Specifically Items 10 & 11 on Table 3.3-1 ML20217D9131997-09-25025 September 1997 Notifies of 971002 Meeting W/Tva in Rockville,Md to Discuss Plans to Employ an Electrosleeving Process to Repair Minor Cracks in Plant SG ML20217P3451997-08-20020 August 1997 Notification of Licensee Meeting W/Util in Rockville,Md to Discuss Test Methods Used & Results of Plant Unit 1 SG Tube Insp Conducted in Apr 1997.Time & Meeting Room Changed ML20210K3301997-08-15015 August 1997 Notification of 970822 Meeting W/Util in Rockville,Md to Discuss Test Methods Used & Results of Plant,Unit 1 SG Tube Insp Conducted in Apr 1997 ML20205M3331997-07-28028 July 1997 Provides Final Agenda for Region II Enforcement Meeting to Be Held on 970730.OI Attendance Requested for Issue Involving Termination of Turkey Point Radwaste Operator Who Failed to Follow Procedure ML20205D9761997-07-0202 July 1997 Ack Receipt of Licensee Response to NOV (SL-IV) on Firewatches (EA 97-092).Licensee Requested That Region II Reconsider Violation as NCV ML20140F6191997-06-11011 June 1997 Forwards Documents Re Snp to Be Placed on Docket & in PDR ML20148F7201997-05-30030 May 1997 Forwards Semiannual Status Rept on Fire Protection Task Action Plan & plant-specific Thermo-Lag Correction Action Programs ML20141K7251997-05-28028 May 1997 Forwards Signed Original of Order Imposing Civil Monetary Penalty (Tva),For Transmittal to Ofc of Fr for Publication. W/O Encl ML20140F6471997-05-0707 May 1997 Forwards P Blanch Comments Re Snp Pressurizer Draindown Event for Review ML20140F6351997-05-0505 May 1997 Forwards P Blanch Comments on TVA Evaluation of 970324 Pressurizer Draindown Event.Disagrees W/Conclusion That TVA Failed to Identify Root Cause ML20138D1481997-04-29029 April 1997 Forwards Documents Re Meetings W/Tva Ig Ofc Concerning Review of TVA Nuclear Employees Concerns Resolution Program. Documents Should Be Forwarded to NRC PDR ML20140F4151997-04-25025 April 1997 Notification of 970425 Meeting W/Tva in Rockville,Md to Discuss Methods & Schedule to Be Employed at Plant to Upgrade Fire Barriers That Contain Thermo-Lag Matl.Meeting Cancelled ML20138B5721997-04-25025 April 1997 Notification of 970502 Meeting W/Util in Rockville,Md to Discuss Methods & Schedule to Be Employed at Plant,Units 1 & 2 to Upgrade Fire Barriers That Contain Thermo-Lag Matl ML20205M1931997-04-14014 April 1997 Informs That Lieberman Offers No Objection to Releasing TVA OI Report 2-96-009 to Licensee & PDR Provided That Report Released in Accordance with Guidance in Section 8.2.4 of Investigative Procedures Manual ML20205E3591997-04-10010 April 1997 Discusses Sequoyah NOV Response Extension.Two Weeks Extension Has Been Granted ML20137F7941997-03-28028 March 1997 Requests Technical Assistance Re Design of AFW Control Sys at Plant ML20137C1841997-03-20020 March 1997 Notification of Upcoming Meeting W/Tva on 970321 in Rockville,Md to Discuss Status of Currently Ongoing Applications for Amend of TS for Plant ML20137A6441997-03-19019 March 1997 Forwards Signed Original of Order Imposing Civil Monetary Penalty (Tva),For Transmittal to Ofc of Fr for Publication ML20135A6471997-02-25025 February 1997 Notification of 970227 Meeting W/Util in Rockville,Md to Discuss Response to NRC Request for Info Re Plant Amend Request 96-01 ML20203C0591997-02-12012 February 1997 Discusses OI Rept 2-96-009 Re Alleged Falsification of Firewatch Journals.Both Individuals Were Subsequently Terminated ML20205D9591997-02-11011 February 1997 Forwards Copy of OI Rept 2-96-009 Issued on 970124 Re Alleged Falsification of Firewatch Journals at Sequoyah Nuclear Plant.Concludes That Both Firewatch Personnel Failed to Patrol All Assigned Areas & Falsified Firewatch Journals ML20133E8681997-01-0909 January 1997 Notification of 970116 Meeting W/Framatome Cogema Fuels in Rockville,Md to Discuss Use of Bwu Critical Heat Flux Correlation at Sequoyah 1999-09-09
[Table view] |
Text
. _-_ ___ _ _ _ _ _ - _ _ _ _ .
t '
s 331 p""% UNITED STATES a ,
NUCLEAR REGULATORY COMMISSION WAsNING7oN. D.C. Sette et M October 1,1997
\e...* I l
MEMORANDUM TO: Jon R. Johnson, Director Division of Reactor Projects 4 Region ll l
1 FROM: Frederick J. Hebdon, Director Project Directorate ll 3 J Division of Reactor Projects -t/Il Office of Nuclear Reactor Regulation J,l l
SUBJECT:
NRR RESPONSE TO TIA 9618 SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 -INTERPRETATION OF TECHNICAL SPECIFICATION 3/4.3.1 ON PRESSURIZER PRESSURE TRANSMITTERS (TAC NO. M97293)
By memorandum dated October 3,1996, Region 11 requested technical assistance regarding interpretation of Sequoyah Technical Specification (TS) 3/4.3.1,* Reactor Trip Systein Instrumentation,'specifically items 10 and 11 (pressurizer pressure) on Table 3.3-1 (same title). The table requires at least three of four channels to be operable during Modes 1 and 2.
Action 6 in the Action column of the table requires the following:
With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:
- s. The inoperable channelis placed in the tripped condition within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />,
- b. The Minimum Channels OPERABLE requirement is met [i.e.,3 channels); however, the inoperable channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing of other channels per Specification 4.3.1.1.1.
At Sequoyah, as with other plants designed by Westinghouse, there are only three sets of penetrations in the pressurizer vessel for the purpose of measuring pressurizer level and pressure. Two pressurizer pressure transmitters (PT48 334 and PT48-342C) share a common reference leg, normally kept full by a condensate pot, with the safety related pressurizer jtMal transmitter (LT48-335) and the non-safety-related cold-calibrated pressurizer level transmitter (LT48 321). See Attachment. The other two pressure and level transmitters
, have their own penetrations, sharing a common reference leg. Because of drihing indicated on pressurizer level transmitter 1 LT48 335 on Unit 1, the licensee elected to place one of the two r pressure instruments that share a common reference leg in bypass and the other pressure instrument in trip in order to refill (backfill) the common reference leg. The backfill operation l j was performed with the plant in Mode 1 and was completed within the 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> specified in the ,
TS. The licensee considered the tripped channel to be operable and the bypassed channel to be inoperable. NRR does not disagree with the licensee's determination.
- .on illll!!!!!Il!ljll!!,f Oilll NP:C RLE CENTER CGPY 9907150130 980624 /
PDR
(*5RSJ9,8155 FOIA 7 PDR /dd
. J. J:hnson -
l The TIA asks 'Does TS 3.3.1 allow the simultaneous bypassing of one PZR pressure channel and tripping of another PZR pressure channel to perform a corrective maintenance activity i rather than a testing activity?" l NRR has completed its review of this issue a. J has developed the following position with l regard to interpretation of the subject Technical Specification. Although perhaps acceptable l from a reactor safety standpoint, the licensee's action wi s not in comoliance with the Technical Specification as written. Action 6 in Table 3.3-1 specifically allows one channelin bypass when a second channelis inoperable Dnly while performing surveillance testing per Specification
- 4.3.1.1.1, which in turn refers to Table 4.3-1. This table covers only channel checks, channel l l
calibrations, and channel functional tests, not refilling reference legs, which NRR agrees is corrective maintenance. The licensee would be required to submit, and receive approval of, a Technical Specification amendment to make their actions acceptable. Another questionable l
, aspect of the licensee's rationale is that it is not clear how one channel of pressurizer pressure cou!d be declared inoperable due to the backfilling operation but not the other (i. e., the one that was placed in trip). The backfill operation would affect both channels in the same manner.
If you have any questions regarding the above determination, please contact the Sequoyah Project Manager, Ron Heman, at (301) 415 2010. i Docket No. 50-327 and 50-328 original by F.Hebdon l
Attachment:
Instrument Diagram cc w/attachmer.t; R. Crienjak, Region I W. L. Axelson, Region lli J. Dyer, Region IV Distribution:
Docket File SQN Reading l BBoger JRoe AChaffee MBoylo (e-mail only MLB4) l SBloom (e-mail only SDB1) MOprendek, Region i TLiu, DRPE MShannon, Ril DOCUMENT NAME: P\97293.TIA To receive a ecy, of tnis document. indk:ste in the box C= Copy w/o attachment /endosure E= Copy with riachment/endosure N = No copy
- See previous concurrence OFFICE PM:PD2 3, 5 1.A:PD2-3 i BC:TSB BQ:HICS 6 D:PD2 0 C DD:hE kDRPg NAME RHeman BClayto WBeckner* J l h el FHebb JZwolinski BB r DATE 9/ 7 9/ 'h/97 9/4/97 l 9/f/97 9/l3 /97 g/ I/97 /97\
OFFICIAL RECORD COPY
i i '
J. Johnson The TIA asks 'Does TS 3.3.1 allow the simultaneous bypassing of one PZR pressure channel
- and tripping of another PZR pressure channel to perform a corrective maintenance activity rather than a testing activity?'
NRR has completed its review of this issue and has developed the following position with regard to interpretation of the subject Technical Specifici!M. Although perhaps acceptable from a reactor safety standpoint, the licensee's action was not in comoliance with the Technical Snecificatien as written. Action 6 in Table 3.3-1 specifically allows one channelin bypass when a second channelis inoperable only while performing surveillance testing per Specification 4.3.1.1.1, which in tum refars to Table 4.3-1. This table covers only channel checks, channel calibrations, and channel functional tests, not refilling reference legs, which NRR agrees is corrective maintenance. The licensee would be required to submit, and receive approval of, a Technical Specification amendment to make their actions acceptabloc Another questionable aspect of the licensee's rationale is that it is not clear how one channel of pressurizer pressure .
could be declared inoperable due to the backfilling operation but not the other (i. e., the one that I was placed in trip). The backfill operation would affect both channels in the same manner.
l If you have any questions regarding the above determination, please contact the Sequoyah Project Manager, Ron Heman, at (301) 415-2010. l l
Docket No. 50 327 and 50 328
Attachment:
Instrument Diagram ,
cc w/ attachment: R. Crienjak, Region I W. L. Axelson, Region 111 J. Dyer, Region IV i
l
9 SQN BACKFILLING SENSfMG LINES ON SnitM os 1-PI-IFV-068-443.0 PRESSURIZER PRESSURE AND LEVEL Rev. 0 1 TRANSMITTERS PROTECTION SET II Page 1 of 1
=
s es
. -r 2 asa gpi o
,,,, ,,,, Q ' u'v ";"
s = 0< )V '
g 1.!!!V.4444 3 8 E I.DUY4&d43D A R 3.DMY.46 441DB r/ I y es ( -
h'Y 3 64 444 A TD Wfg1 PRESSURIZER k K
CAAwS g wau ff.
7%
.c. A y K
l.!!!V.48 4449 113tv 48 443C 3.tsty.s4 443D l y,V g88 3.!!!V.46 443F 4 tQty.u-444C E K
l.PT 48 334 3.PT 6g j l l.Lt.64 334
.e L H
.j
, 8.LT.48333
- 8. DRIV 44 { l.DUY44 {
{ l. DRIV 464440A 4.uiv..i .444 s .u- .as.44:= -
- 3. .'
l.ORIV48444DB L- 2 H l
as 1
- l. DRIV 66444DC [ 1 DR!v48J43DF { gm 5759R/ MIG / jap e
_ _ _ _ . _.