ML20205D959

From kanterella
Jump to navigation Jump to search
Forwards Copy of OI Rept 2-96-009 Issued on 970124 Re Alleged Falsification of Firewatch Journals at Sequoyah Nuclear Plant.Concludes That Both Firewatch Personnel Failed to Patrol All Assigned Areas & Falsified Firewatch Journals
ML20205D959
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 02/11/1997
From: Uryc B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jaudon J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20205B966 List:
References
FOIA-99-76 NUDOCS 9904050015
Download: ML20205D959 (10)


Text

.

[km Afog%

UNITED STATES NUCLEAR REGULATORY COMMISSION 4

REGION !!

y E

101 MARIETTA STREET, NA., SUITE 2900 j

ATLANTA. GEORGIA 30323-0199 k*****j#

February 11, 1997 U -% ~~ b # 0 O MEMORANDUM FOR:

Johns P. Jaudon. Director Division of Reactor Safet (DRS FROM:

Bruno Uryc. Director 7

Enforcement and Inve igat' s

Coordination Staf (EIC

/,

SUBJECT:

OFFICE OF INVESTIG IONS REPORT NO. 2-96-009 -

SEQUOYAH NUCLEAR PLANT Attached is a copy of Office of Investigations (01) Report No. 2-96-009 issued on January 24. 1997. regarding the alleged falsification of firewatch journals at the Sequoyah Nuclear Plant. Based on the evidence gathered during the investigation. OI concluded that both firewatch personnel failed to patrol all their assigned areas and falsified their firewatch journals by claiming that these areas were inspected. However. 01 concluded that their actions were not intentional or willful.

Please review the OI report and associated exhibits to determine the appropriate enforcement action, if any. This review should also include a determination as to whether any new allegations were provided during the investigation process.

You are reauested to comolete your review and be orecared to cresent your conclusions at an enforcement Danel which has been scheduled for February 19.

1997.

In preparation for this panel, an Enforcement Action Worksheet should be prepared to address the appropriate course of action against the utility as well as the individuals involved in the record falsification.

If new allegations are identified these issues should be documented and forwarded to A. Ignatonis or 0. DeMiranda of my staff to be scheduled for review at an Allegation Review Panel.

DRS. Soecial Insoection Branch has the lead for this review.

Please treat this document as " Official Use Only" and appropriately destroy the documents when your work with them is completed. Your cooperation and assistance in achieving a timely review of the report is greatly appreciated.

Exhibits to the CI Report are available from any member of my staff.

Attachment:

01 Report No. 2-96-009

-cc w/ attachment:

cc w/o attachment:

J. Johnson DRP W. McNulty. 01 C Evans. ORA M. Lesser. DRP i

0. DeMiranda. EICS D., Collins. DRS

(';

A. Boland. EICS P. Fredrickson. DRS

\\\\

L

~

9904050015 990324 PDR FOIA QUNTER99-76.

.PDR 3

r l-l l

17-Feb-97 CASE CHRONOLOGY Rll-1996-A-0063 Date Received Date Asslaned Completion Data fanc.am.

1 3/13/96 i

Action 3

Other 3/43/96 1/24/97 Description O! INVESTIGATION. CLOSED - SUBSTANTIATED i

Concern 1

Aciton.

2 ARB Meeting 3/13/96 3/13/96 Description ARB CONDUCTED TO REVIEW LICENSEE IDENTIFIED FALSIFICATION OF FIREWATCH RECORDS BY 2 INDIVIDUALS. LICENSEE TERMINATED INDIVIDUAL. 01 INITIATED INVESTIGATION TO SUPPORT ENFORCEMENT ACTION UNDER 50.9. Ol INVESTIGATION PENDING l

\\

l b

'k k

(\\

I 5

r

'g AN f

-r Ol/L EICS ENFORCEMENT WORKSHEET

/:

EICS HEETING NOTES AND DOCUMENTATION OF UNDERSTANDING cf'

,_C -

2 EA MlleER:

M7-68J-ARENDEES FACILITY:. TremaaL

/wod //)/N/A/g lj

/A N/b'4C G A&!a+1 rwa >

stb 3ECT:

faba /ni N 51AlG7cU f(l(/$p 091>71)

{/),f,444/&

(

()

eff P6Axbx -

~'

PAEL o PEC a CAUCUS

[ N /4 9 a OTER o 01 BRIEF d,/M</6 66 A. bil/4Ll-

/

47 [6 INSPECTION ElO DATE:

PREPARED BY:

I /$//t M DATE: c2I6/97 TIE: JZd#7X

/

/

I.

EICS STAFF NOTES:

lA-nbv?Ja d - Anbl YD J22k / br.? w &r /?~nx fAhlk6for

/>&msul -maas ssd a &A,Ja %,%M Asdna 7/

/

4 O'

Mno v-Atch sMus{s,tm4sv<Zid t/<Aud Wit?'./]tlixk /bxc u

/

%dnats br>umR

/

/

> t%vt Aff8hxb h) 22 fi

&atamW % >u /wm m.'

Txt-

-81}ud suA%'wAf af/M At&2 rir G w222Asa

,9

[

h J.'icatac

/m/A wZuh hv' AAW - B/hT

/nt,L ju /m6 /ahu s m h u ?2 d A fk eb (jy

-Mcd>1,e,4xovtr1[xtto2/ d^Qi

  • m mmaE gj h

g"$"4,4, ' 'uguru 4' uu-7d A-x Q

W

[

$,hg

2 ENFORCEMENT ACTION WORKSHEET EICS MEETING NOTES AND DOCUMENTATION OF UNDERSTANDING II.

Civil Penalty Assessment First non-willful SL III violation in 2 years /2 insoections? YES or NO A.

Previous-escalated cases:

B.

Identification Credit? YES - NO - N/A IGtC identified?

Licensee identified?

Revealed through an event?*

Prior opportunities?

C.

Corrective action credit? YES - NO - N/A lismediate corrective actions:

Long term corrective actions to prevent recurrence:

D.

Discretion aoolied? Yes or No: Reason why.

E.

Civil Penalty:

Recomendation for credecisional enforcement conference:

F.

f~ ! \\c

> r

r

[.A if 3

ENFORCEMENT ACTION WORKSHEET EICS HEETING NOTES AND DOCUENTATION OF UM)ERSTANDING ND1E: Caeplete the following information for each violation ISSUE:

III. h=ritation of Enforcement Pcnel/ Caucus Consensus A.

Preliminary Severity Level (Prior to Application of my Discretion, 1

From Part I)

B.

Increase Severity Level based on Aggregation?

C.

Increase Severity Level for Repeat Violations?

j (Address requiriments of 1101 0903)

O.

Increase Severity Level for Willfulness?

E.

SEVERITY LEVEL SLPPLBEE/SECTION F.

Par===idad Civil Penalty G.

Predecisional Enforcement Conference Necessary?

H.

Revision to Draft NOV Required?

I.

Formal Review by OE Required?

J.

Special Action Items / Message to Licensee / Camments dlso AA'Auad JWid O /2mf&hm A/> b)

A w in A/hkxld on)O/An wsDAx V4

/)

7 v

ufu JawkaJadau, aWm esut s m b h r/> u h A il b

l' e

i

/

/

/

\\

/ AunidL N

N' T

/

  • 9 4

9%

W-9 P:\\ FORMS.DIR\\DIFPML.FIIM / October 11, 1996 up-

' g, 1/

=.

1 1

ElCS ROUTING SHEET

.t TO:

SUBJECT:

j O THE ATCH CONTAINS AN ESCALATED ENFORCEMENT ACTION THAT MAY RELATE TO YOUR AREA.

ACTION:

REMARKS:

O OXD O AJI O LMS ATB C',4

- d [

h**

O UW D

O NOTE AND DESTROY IhlQL 0 NOTE AND RETURN I

i O COORDINATE WITH O PLEASE PROVIDE COMMENTS O PLEASE ANSWER THIS O INFORMATION O PLEASE SEE ME ON THIS O voVR ACTION REQUIRED O PER CONVERSATION l

O FILE WITH CASE NO:

]

i

/

4 APK - U N B

NOU Yc 0 nG COPY l

COPY: O A TB O LMS O AJI O OXD D LJW D CFE O E-FILE O A-FILE O Of D REQUEST STA TUS AND WHEN ACTIONIS EXPECTED TO BE COMPLETED (SEE A TCH) l I

i O YOUR ACTION REQUIRED BY:

O A1TACHMENT na mmmaxws. >. nu L:

)

I f

a k DATE:

SUBJECT:

ACTION REQUIRED:

SPECIAL INSTRUCTIONS:

COPIES TO: O ATB O OXD 0 AJI O LMS O LJW D OTHER:

NOTES:

llti' 1

s

'[.'

ORA x:404-3SI-6471 r.

~

    • Transmit Conf. Report **

Apr 8 '97 6:55 ORA

- - > 3-301-415-3431 l

te.

I 0001 4

Mode NORMAL Tirre 2'30'

)

Pages 11 Page(s)

Result 0K l

\\. /'

\\

\\ '

gi

\\

T, i

FACSIMILE TRANSMITTAL U. S. NUCLEAR REGULATORY COMMISSION REGION II ATLANTA, GEORGIA ENFORCEMENT AND INVESTIGATION COORDINATION STAFF TO:

Mt, AToTz.:<>u, s

SUBJECT:

bb Hd L k OE (301+415-3431)

C WF (301+415-2260)

U OTHER DATE: APR -8 BIR l

NO. OF PAGES_ b

+ TRANSMITTAL SHEET l

FROM:

BRUNO URYC, DIRECTOR, EICS l

OFFICE: (404) 331-5505 i

FAX: (404) 331-0426 INTERNET: BXU@NRC. GOV SENT BY:

TIME:

OM f

4 2: