ML20205E359

From kanterella
Jump to navigation Jump to search
Discusses Sequoyah NOV Response Extension.Two Weeks Extension Has Been Granted
ML20205E359
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 04/10/1997
From: Belisle G
NRC
To: Uryc B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20205B966 List:
References
FOIA-99-76 NUDOCS 9904050158
Download: ML20205E359 (1)


Text

ri O

O N

7 From:

George Belisle To:

BXU 73 runo U9 C, /2.S

[

Date:

4/10/97 4:54pm

Subject:

SEQUOYAH NOV RESPONSE EXTENTION ON 4/10 i TALKED WITH J. SMITH, SEQUOYAH LICENSING) ABOUT THE NEED FOR HIM TO HAVE A COPY OF Of REPORT 2 96-009 SO THAT HE COULD PROPERLY RESPOND TO A NOV THAT WAS WRITTEN ON 3/14 (NO INSPECTION REPORT NUMBER). BASED ON TALKS WITH A. BOLAND AND YOU, I GRANTED HIM A TWO WEEK EXTENTION AND REQUESTED THAT HE DOCUMENT OUR CONVERSATION IN CORRESPONDENCE TO US. IN OTHER DISCUSSIONS, I WAS INFORMED THAT OE/OI WOULD LET SEQUOYAH HAVE A COPY OF THE 01 REPORT AFTER IT WAS RED / '~ FED. I INFORMED SMITH OF THIS.

1 l

l Zlt OnC90%('ScyuuMt i

1 99J 4o g e 990324

~

PDR w - % ERy -76 J