ML20217P345
| ML20217P345 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 08/20/1997 |
| From: | Hernan R NRC (Affiliation Not Assigned) |
| To: | Hebdon F NRC (Affiliation Not Assigned) |
| References | |
| NUDOCS 9708270327 | |
| Download: ML20217P345 (4) | |
Text
,
August 20,1997 o
NOTE CHANGE IN_ TIME AND MEETING ROOM MEMORANDUM TO:
Frederick J. Hebdon, Director Project Directorate 113 Division of Reactor Projects - 1/11, NRR FROM:
Ronald W Hernan, Senior Project Manager Original signed by:
' Project Directorate 11-3 Division of Reactor Projects l/ll, NRR
SUBJECT:
FORTHCOMING MEETING WITH TENNESSEE VALLEY AUTHORITY SEQUOYAH UNIT 1 STEAM GENERATOR INSPECTION RESULTS DATE & TIME:
Friday, August 22,1997 9:00 am 11:00 am LOCATION:
U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, Maryland 20852 Conference Room O 6 B 11 PURPOSE:
This meeting is being held at the staffe N guest to discuss the test methods used and results of the Sequoyah Unit i steam generator tube inspections conducted in April 1997.
PARTICIPANTS *:
HRG D/A R. Hernan, NRR P. Salas E. Sullivan, NRR J. Smith J. Tsao, NRR H. Cothron P. Rush D. Goetcheus C. Webber J. Valente l
Docket Nos. 50-327 and 50-328 cc: See next page
.h h j,- ;
D j
CONTACT:
Ronald W. Hernan, CD1) 415 2010
- Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the Public" 59 fadatal Reaister 48340,9/20/94.Rockville, Maryland 20852 Distribution: See next page DOCbMENT NAME: G:tSQNtMTGNOT-8.22 To get a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure
N" = No copy OFFICE PDil 3/PM, PDil 3/LA ce PDil 3/D /A,
NAME RHernan M(F BClayton / hat /
FHebdort /b
/
DATE 6 Ol/97 f/N97 9 497 '
r@
a ccicias ocenon enov M*"588H E88f8!7
! I! l! I!. !.:lill E Elf.CEidiB MPV et
p* 88 g g,
[
k UNITED STATES s
,}
NUCLEAR REGULATORY COMMISSION o
W AsHINGToN, D.C. 3064H001
/
August 20,1997 NOTE CHANGE IN TIME AND MEETING ROOM MEMORANDUM TO:
Frederick J. Hebdon, Director Project Directorate ll 3 Division of Reactor Projects 1/11, NRR FROM:
Ronald W. Hernan, Senior Project Manager ginal signed ty:
Project Directorate 113
,d)/ hr - {Mp Division of Reactor Projects l/11, NRR
SUBJECT:
FORTHCOMING MEETING WITH TENNESSEE VALLEY AUTHORITY - SEQUOYAH UNIT 1 STEAM GENERATOR INSPECTION RESULTS DATE & TIME:
Friday, August 22,1997 9:00 am 11:00 am LOCATION:
U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, Maryland 20852 Conference Room O 6 B 11 PURPCSE:
This meeting is being held at the staff's request to discuss the test methods used and results of the Sequoyah Unit i steam generator tube inspections conducted in April 1997.
PARTICIPANTS *:
NEC L%
R. Hernan, NRR P. Salas E. Sullivan, NRR J. Smith J. Tsao, NRR H, Cothron P. Rush D. Goetcheus C. Webber J. Valente Docket Nos. 50-327 and 50-328 cc: See next page CONTACT:
Ronald W. Hernan 301-415-2010
' Meetings between NRC technical staff and applicants or licensees are open for interested c
members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the Public" 59 EndatalEnglaint 48340,9/20/94.
j
n d
SEQUOYAH NUCLEAR PLANT Cc:
Mr. Oliver D. Kingsley. Jr.
Mr. Pedro Salas Manager President. TVA Nuclear and Licensing and Industry Affairs Chief Nuclear Officer Sequoyah Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority 6A Lookout Place P.O. Box 2000
_1101 Market Street Soddy Daisy. TN 37379 Chattanooga, TN 37402 2801 Mr. J. T. Herron Plant Manager Mr. O. J. Zeringue. Sr. Vice President Sequoyah Nuclear Plant Nuclear Operations Tennessee Valley Authority Tennessee Valley Authority P.O. Box 2000 6A Lookout Place Soddy Daisy. TN 37379 1101 Market Street Chattanooga. TN 37402-2801 I.egional Administrator U.S. Nuclear Regulatory Comission Mr. Jack-A. Bailey Region 11 Vice President 61 Forsyth Street. SW.
Engineering & Technical Services Suite 23T85
--Tennessee valley Authority _
Atlanta, GA 30303 3415 6A Lookout Place
-1101 Market Street Mr. Melvin C. Shannon Chattanooga. TN 37402 2801 Senior Resident inspector Sequoyah Nuclear Plant Mr. Masoud Bajestani U.S. Nuclear Regulatory Commission Site Vice President-2600 Igou Ferry Road Sequoyah Nuclear Plant Soddy Daisy. TN 37379 Tennessee Valley Authority P.O. Box 2000 Mr. Michael H. Mobley Director Soddy Daisy. TN 37379 Division of Radiological Health 3rd Floor. L and C A.nnex.
General Counsel 401 Church Street Tennessee Valley Authority Nashville TN 37243 1532 ET 10H.
400 West Summit Hill Drive County Executive Knoxville TN 37902 Hamilton County Courthouse Chattanooga. TN 37402-2801 l
Mr. Raul R. Baron. General Manager Nuclear Assurance Tennessee Valley Authority 4J Blue Ridge 1101 Market Street Chattanooga. TN 37402-2801 Mr.-Mark J. Burzynski. Manager Nuclear Licensing Tennessee Valley Authority 4J Blue Ridge 1101 Market Street Chattanooga._TN 37402 2801
t Meeting Notics Distnbutiorr E Mail S. Collins /F. Miraglia (FJM)
T Martin (TTM)
R. Zimmerman (RPZ)
B. Boger(BAB2)
F. Hebdon (FJH)
R. Heman (RWH)
' B. Clayton (BAC2)
D. Ross (e mail to SLM3)
G. Holahan (GMH)
M. Clark (MMC)-
J. Strosnider(JRS2)
E. Sullivan (EJS)
J. Tsao (JCT)
P. Rush (PJR1)
J. Johnson, Ril DRP (JRJ)
N. Dudley(NFD)
K. Clark (KNC2)
S. Dembek(SXD)
PMNS (meeting announcement coordinator)
Hard Conv Docket Fne!
PUBLIC SQN Rdg.'
OGC.
ACRS Receptionist, OWFN and TWFN cc: Licensee & Service List 1
a