ML20210K330
| ML20210K330 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 08/15/1997 |
| From: | Hernan R NRC (Affiliation Not Assigned) |
| To: | Hebdon F NRC (Affiliation Not Assigned) |
| References | |
| NUDOCS 9708190228 | |
| Download: ML20210K330 (4) | |
Text
_ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _
Augu:t 15,1997.
- MEMORANDUM TO:
Frederick J. Hebdon, Director Project Directorate ll-3 Division of Reactor Projects - 1/11, NRR -
FROM:
. Ronald W. Hernan, Senior Project Manager Project Directorate ll-3 Division of Reactor Projects - 1/11, NRR f
t.
SUBJECT:
FORTHCOMING MEETING WITH TENNESSEE VALLEY AUTHORITY - SEQUOYAH UNIT 1 STEAM GENERATOR INSPECTION RESULTS DATE & TIME:
FridSy, August 22,'1997 l
~
^
10:00 am - 12:00 am 2
a r
y LOCATION:
U. S. N'uclear Regulatory Commission gy
.One White Flint North
'11555 Rockville Pike-Rockville, Maryland 208G2 ^
i Conference Room O 8-B-11 j
PURPOSE:
0 This meeting is being held at the staff's request to discuss the test methods used and results of the Sequoyah Unit 1 steam generator
' tilbe inspections conducted in April 1997.
PARTICIPANTS *:
NHC IVA R. Hernan, NRR P. Salas E. Sullivan, NRR J. Smith J. Tsao, NRR H. Cothron P. Rush D. Goetcheus l
C. Webber J. Valente Docket Nos. 50-327 and 50-328 "hTl cc: See next page O
CONTACT:
Ronald W. Hernan 301-415-2010
- Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the Public" 59 Federal Reoister 48340, 9/20/94.Rockville, Maryland 20852 Distribution: See next page ll ll ll ll lllll lll DOCUMENT NAME: G:tSQN\\MTGNOT-8.22 TO GET a copy of this document, indicato in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy 0FFICE-PDII-3/PM, il PDII-3/LA PDII-3/D l c.
I NAME RHernan J/j g BC1ayton.4 g u FHebdon cf._/,
DATE 8 //5 /97 y//f/97 7 /m/97 9708190228 970815 gDR ADOCK 050003 7 0FFICIAL RECORD COPY ggg{%
SEQUOYAH NUCLEAR PLANT CC:
Mr. Oliver D.
Kingsley, Jr.
Mr. Pedro Salas, Manager President, TVA Nuclear and Licensing and Industry Affairs Chief Nuclear Officer Sequoyah Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority 6A Lookout Place P.O. Box 2000 1101 Market Street Soddy Daisy, TN 37379 Chattanooga, TN 37402-2801 Mr. J. T. Herron Mr. O.
J. Zeringue Plant Manager Senior Vice President Sequoyah Nuclear Plant Nuclear Operations Tennessee Valley Authority Tennessee Valley Authority P.O.
Box 2000 6A Lookout Place Soddy Daisy, TN 37379 1101 Market Street Chattanooga, TN 37402-2801 Regional Administrator U.S.
NRC Mr. Jack A.
Bailey Region II Vice President 61 Forsyth Street, SW.
Engineering & Technical Services Suite 23T85 Tennessee Valley Authority Atlanta, GA 30303-3415 6A Lookout Place 1101 Market Street Mr. Melvin C. Shannon Chattanooga, TN 37402-2801 Senior Resident Inspector Sequoyah Nuclear Plant Mr. Masoud Bajestani U.S.
NRC Site Vice President 2600 Igou Ferry Road Sequoyah Nuclear Plant Soddy Daisy, TN 37379 Tennessee Valley Authority P.O.
Box 2000 Mr. Michael H. Mobley Director Soddy Daisy, TN 37379 Division of Radiological Health General Counsel 3rd Floor, L and C Annex Tennessee Valley Authority 401 Church Street ET 10H Nashville, TN 37243-1532 400 West Summit Hill Drive Knoxville, TN 37902 County Executive Hamilton County Courthouse Mr. Raul R. Baron Chattanooga, TN 37402-2801 General Manager Nuclear Assurance Tennessee Valley Authority 4J Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801 Mr. Mark J, Burzynski, Manager Nuclear Licensing Tennessee Valley Authority 4J Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801
,_..,r
_ August 15,1997-
- p --
3
' MEMORANDUM TO:
Frederick J. Hebdon, Director Project Directorate ll Division of Reactor Projects - 1/11, NRR FROM:
- Ronald W. Heman, Senior Project Manager Project Directorate ll-3
- Division of Reactor Projects - 1/II, NRR
SUBJECT:
FORTHCOMING MEETING WITH TENNESSEE VALLEY AUTHORITY - SEQUOYAH UNIT 1 STEAM GENERATOR l
lNSPECTION RESULTS DATE & TIME:
Friday, August 22,1997
- 10:00 am - 12:00 am i
' LOCATION:
U. S. Nuclear Regulatory Commission l
One White Flint North 11555 Rockville Pike l
Rockville, Maryland 20852 Conference Room O 8-B-11 PURPOSE:
This meeting is being held at the staff's request to discuss.the test methods used and results of the Sequoyah Unit 1 steam generator tube inspections conducted in April 1997.
PARTICIPANTS *:
tEC D/A R. Heman, NRR P. Salas E. Sullivan, NRR
'J. Smith J. Tsao, NRR H. Cothron P. Rush D. Goetcheus C. Webber J. Valente -
Docket Nos. 50-327 and 50-328 cc:. See next page -
CONTACT:
Ronald W. Heman
-301-415-2010
- Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the Public" 59 Federal Register 48340, 9/20/94.Rockville, Maryland 20852 Distribution: See next page
- DOCUMENT NAME: G:\\SQNiMTGNOT-8.22 TO GET a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy 0FFICE PDII-3/PM,
-l PDII-3/LA l
PDII-3/D l c.
l 3
NAME RHernan MF BClayton m r u FHebdon c{l.
DATE 8 //S /97 9 / /f/97 7 /w/97 0FFICIAL RECORD COPY
,4'.
Meetina Notica Distribution:
i
' E. Mail 4
. S. Collins /F. Miraglia (FJM)
- T. ' Martin (TTM).
R. Zimmerman (RPZ) l B. Boger(GAB 2) _
F. Hebdon (FJH)
R. Heman (RWH).
B. Clayton (BAC2)
D. Ross (e-mail to SLM3) l OPA (e-mail to OPA)
L G. Holahan (GMH)
M. Clark (MMC)
J. Strosnider(JRS2)
E. Sullivan J. Tsao P. Rush J. Johnson, Ril DRP (JRJ)
N. Dudley.
K. Clark (KNC2)
S. Dembek PMNS (meeting announcement coordinator)
Hard Conv Docket File.-
PUBLIC '
SQN Rdg.
OGC ACRS Receptionist, OWFN and TWFN cc: Licensee & Service List
- - -