ML20216B717

From kanterella
Jump to navigation Jump to search
Notification of 980514 Meeting W/Util in Rockville,Md to Discuss NRC RAI Re TS Change Request to Extend Emergency Diesel Generator Allowed Outage Time from 3 Days to 7 Days
ML20216B717
Person / Time
Site: Sequoyah  
Issue date: 05/07/1998
From: Hernan R
NRC (Affiliation Not Assigned)
To: Hebdon F
NRC (Affiliation Not Assigned)
References
NUDOCS 9805180366
Download: ML20216B717 (4)


Text

May 7,1998 a

' MEMORANDUM TO:

Frt:darick J. Habdon, Director Project Directomte ll-3 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation FROM:

Ronald W. Hernan, Senior Project Manager (Original signed by)

Project Directorate ll-3 Division of Reactor Projects - l/II Office of Nuclear Reactor Regulation

SUBJECT:

FORTiiCOMING MEETING WITH TENNESSEE VALLEY AUTHORITY

- EXTENSION OF EMERGENCY DIESEL GENERATOR ALLOWED OUTAGE TIME TO 7 DAYS DATE & TIME:

Thursday, May 14,1998 9:30 a.m. - 11:30 a.m.

LOCATION:

U. S. Nuclear Regulatory Commission One White Flint North Room O-3-B-4 11555 Rockville Pike, Rockville, Maryland PURPOSE:

This meeting is being held at the request of TVA to discuss the NRC request for additional information regarding the Technical Specification change request to extend the emergency diesel generator allowed outage time from 3 days to 7 days.

PARTICIPANTS *:

NEG IYA R. Hernan M. Caruso J. Smith. et. al F. Hebdon 1.Jung J. Calvo A. El-Bassioni A. Gill O. Chopra Docket Nos. 50-327 and 50-328 kh ((}'

cc: See next page CONTACT: Ronald W. Hernan, NRR s

301-415-2010 8 E

.g L

  • Meetings between NRC technical staff and applicants or licensees are open for interested

)

ig members of the public, petitioners, intervenors, or other parties to attend as observers 5:o pursuant to " Commission Policy Statement on Staff Meetings Or,en to the Public" m:

59 Federal Reaister 48340, 9/20/94.

. g DOCUMENT NAM.E

\\SQN\\MEETNOTS.14 i

  • ' ~

L]

)

w TO GET a copy of this document. indicate in the box: "C* = Copy without attachment / enclosure

.,j 10

  • E* = Copy with attachment / enclosure
  • N" = No copy r#

fE EL OFFICE PDil-3/PMA

) l PDil-3/LA l

PDil-3/PD

)

C.

NAME RHernan $tW' BClaytongl4AV FHebdon W DATE 5/7 /98 5/ ? /98 5/ *) /98 OFFICIAL RECORD COPY

l l

6.

May 7, 1998 Meeting Notice Distribution E-Mail (w/ attachment)

S. Collins /F Miraglia (FJM)

B. Boger (BAB2)

J. Zwolinski(JAZ)

F. Hebdon (FJH)

R. Hernan (RWH)

B. Clayton (BAC2)

D. Ross (e-mail to SLM3)

M. Caruso (MAC)

1. Jung (IXJ)

J. Calvo (JAC7)

A. El-Bassioni (AAE)

A. Gill (ASG)

O. Chopra (OPC)

OPA (e-mail to OPA)

L. Plisco, Ril DRP (LRP)

M. Tschiltz (MDT)

K. Clark (KNC2)

G. Holahan (GMH)

PMNS (meeting announcement coordinator) i Hard Coov rDocket File ~~!}

' PUBLIC' '

SQN Rdg.

OGC ACRS Receptionist, OWFN and TWFN cc: Licensee & Service List i

l l'

pn anau y*.

-t UNITED STATES l

g j

NUCLEAR REGULATORY COMMISSION

't WASHINGTON, D.C. 20666-0001

\\*****p8 May 8, 1998 MEMORANDUM TO: Frederick J. Hebdon, Director Project Directorate 11-3 Division of Reactor Projects - 1/Il Office of Nuclear Reactor Regulation FROM:

Ronald W. Hernan, Senior Project Manager p, 4 Project Directorate 11-3 l

Division of Reactor Projects - 1/II Office of Nuclear Reactor Regulation t

SUBJECT:

FORTHCOMING MEETING WITH TENNESSEE VALLEY AUTHORITY l

- EXTENSION OF EMERGENCY DIESEL GENERATOR ALLOWED OUTAGE TIME TO 7 DAYS l

l

. DATE & TIME:

Thursday, May 14,1998 l

9:30 a.m. - 11:30 a.m.

LOCATION:

U. S. Nuclear Regulatory Commission l

One White Flint North Room 0-3-B-4 l

11555 Rockville Pike, Rockville, Maryland l

PURPOSE:

This meeting is being held at the request of TVA to discuss the NRC

)

request for additional information regarding the Technical Specification change request to extend the emergency diesel generator allowed outage time from 3 00ys to 7 days.

PARTICIPANTS *:

NBC D/.6 R. Hernan M. Caruso J. Smith, et. al F. Hebdon 1.Jung J. Calvo A. El-Bassioni A. Gill O. Chopra i

Docket Nos. 50-327 and 50-328 l

cc: See next page CONTACT: Ronald W. Hernan, NRR 301-415-2010

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the Public" 59 Federal Register 48340, 9/20/94.

L

Mr. J. A. Scalice SEQUOYAH NUCLEAR PLANT Tennessee Valley Authority cc:

Senior Vice President Mr. Pedro Salas, Manager Nuclear Operations Licensing and Industry Affairs Sequoy#

Tennessee Valley Authority Nuclear Plant 6A Lookout Place Tennessee Valley Authority 1101 Market Street P.O. Box 2000 Chattanooga, TN 37402-2801 Soddy Daisy, TN 37379 Mr. Jack A. Bailey Mr. J. T. Herron, Plant Manager j

Vice President Sequoyah Nuclear Plant Engineering & Technical Services Tennesses Valley Authority Tennessee Valley Authority P.O. Box 2000 6A Lookout Place Soddy Daisy, TN 37379 1101 Market Street Chattanooga, TN 37402-2801 Regional Administrator U.S. Nuclear Regulatory Commission Mr. Masoud Bajestani Region ll Site Vice President 61 Forsyth Street, SW.

Sequoyah Nuclear Plant Suite 23T85 Tennessee Valley Authority Atlanta, GA 30303-3415 P.O. Box 2000 Soddy Daisy, TN 37379 Mr. fAelvin C. Shannon Senior Resident inspector General Counsel Sequoyah Nuclear Plant Tennessee Valley Authority U.S. Nuclear Regulatory Commission ET 10H 2600 Igou Ferry Road 400 West Summit Hill Drive Soddy Daisy, TN 37379 Knoxville, TN 37902 Mr. Michael H. Mobley Director Mr. Raul R. Baron, General Manager Division of Radiological Health-Nuclear Assurance 3rd Floor, L and C Annex Tennessee Valley Authority 401 Church Street 4J Blue Ridge Nashville, TN 37243-1532 1101 Market Street Chattenooga, TN 37402-2801 County Executive Hamilton County Courthouse Mr. Mark J. Burzynski, Manager Chattanooga, TN 37402-2801 Nuclear Licensing Tennessee Valley Authority 4J Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801

>