ML20202J598: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:.                      .
- ',
                                . SAFEGUARDS INFORMATION-
                                        JUL 111986
    Docket No. 50-348, 50-364
    License No. NPF-2, NPF-8
    Alabama Power Company                            -
    ATTN: Mr. R. P. Mcdonald
            Senior Vice President
    P. O. Box 2641
    Birmingham, AL 35291
    Gentlemen:
    SUBJECT: NRC INSPECTION REPORT NO. 50-348/86-12 AND 50-364/86-12                              i
    This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
    G. F. Gibson on June 16-20, 1986. The inspection included a review of activities
    authorized for your Farley Nuclear facility. At the conclusion of the inspec-
    tion, the findings were discussed with those members of your staff identified in
    the enclosed inspection report.
    Areas examined during the inspection are identified in the report. Within these
    areas, the inspection consisted of selective examinations of procedures and
    representative records, interviews with personnel, and observation of activities
    in progress.
    Within the scope of the inspection, no violations or deviations were identified.
    In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and
    security measures are exempt from public disclosure; therefore, the enclosure to
    this letter, with the exception of the report cover page which presents a
    nonexempt summary, will not be placed in the NRC Public Document Room.
    Should you have any questions concerning this letter, please contact us.
                                              Sincerely,
                                              David M. Verrelli, Chief
                                              Reactor Projects Branch 2
                                              Division of Reactor Projects
    Enclosure:
    NRC Inspection Report
        (Safeguards Information)
    cc w/ encl:    (See page 2)
                                                                      ENCLO
          ,gga FAY @*                                                8AFEGUSURE
                                                                            ARDSCONT  AINS
      G                                                            PUPONSEP AR INF  0
                                                                      AGE
                                                                          ISDE ATION
                                                                                        *d4ATION
                                      pyto s W O E                          CONTROLLEDTHI
                                                                                    -
                                                                                          .
                                                                                  -
                  ,                                                .
                                                                                              n -
 
  ,
,  ,
                                  SAFEGUARDS INFORMATION
      Alabama Power Company                  2
                                                            JUL 111986
      cc w/ encl:
      W. O. Whitt, Executive Vice President
      J. D. Woodard, General Manager -
        Nuclear Plant
      W. G. Hairston, III, General Manager -
        Nuclear Support
      J. W. McGowan, Manager-Safsty Audit
        and Engineering Review
      J. K. Osterholtz, Supervisor-Safety
        Audit and Engineering Review
      bec w/ encl:
      IE File
      NMSS/SGPL
      NRR/DL/SSPB
      bec w/ Inspection Summary:
      Document Control Desk, 016
      NRC Resident Inspector
      State of Alabama
      RII.    ,
                            RII                    RII    RI
        aims'en:hlm          DMcGuire        KBhrr  JSt!ohr HDance  WCM"" M.M7t3
                                                                    SAFE".L  , ,, ,37C.TJATIZ
      1l/ 7./86            "$/Q./86        "5g/86 71 0 /86 Y/n /86 UPON Ei:PA;iA'fION THIS  '
                                a                                    PAGE IS DECONTROILED'
                                aAFEGUARDS INFORM?. TION
                              ,
}}
}}

Latest revision as of 09:37, 1 January 2021

Forwards Insp Repts 50-348/86-12 & 50-364/86-12 on 860616-20.No Violations or Deviations Identified
ML20202J598
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 07/11/1986
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20202J601 List:
References
NUDOCS 8607170111
Download: ML20202J598 (2)


See also: IR 05000348/1986012

Text

. .

- ',

. SAFEGUARDS INFORMATION-

JUL 111986

Docket No. 50-348, 50-364

License No. NPF-2, NPF-8

Alabama Power Company -

ATTN: Mr. R. P. Mcdonald

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NO. 50-348/86-12 AND 50-364/86-12 i

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

G. F. Gibson on June 16-20, 1986. The inspection included a review of activities

authorized for your Farley Nuclear facility. At the conclusion of the inspec-

tion, the findings were discussed with those members of your staff identified in

the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and

security measures are exempt from public disclosure; therefore, the enclosure to

this letter, with the exception of the report cover page which presents a

nonexempt summary, will not be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

David M. Verrelli, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

NRC Inspection Report

(Safeguards Information)

cc w/ encl: (See page 2)

ENCLO

,gga FAY @* 8AFEGUSURE

ARDSCONT AINS

G PUPONSEP AR INF 0

AGE

ISDE ATION

  • d4ATION

pyto s W O E CONTROLLEDTHI

-

.

-

, .

n -

,

, ,

SAFEGUARDS INFORMATION

Alabama Power Company 2

JUL 111986

cc w/ encl:

W. O. Whitt, Executive Vice President

J. D. Woodard, General Manager -

Nuclear Plant

W. G. Hairston, III, General Manager -

Nuclear Support

J. W. McGowan, Manager-Safsty Audit

and Engineering Review

J. K. Osterholtz, Supervisor-Safety

Audit and Engineering Review

bec w/ encl:

IE File

NMSS/SGPL

NRR/DL/SSPB

bec w/ Inspection Summary:

Document Control Desk, 016

NRC Resident Inspector

State of Alabama

RII. ,

RII RII RI

aims'en:hlm DMcGuire KBhrr JSt!ohr HDance WCM"" M.M7t3

SAFE".L , ,, ,37C.TJATIZ

1l/ 7./86 "$/Q./86 "5g/86 71 0 /86 Y/n /86 UPON Ei:PA;iA'fION THIS '

a PAGE IS DECONTROILED'

aAFEGUARDS INFORM?. TION

,