ML17278A251: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 06/27/1985
| issue date = 06/27/1985
| title = Advises That State of Wa Energy Facility Site Evaluation Council Concurs W/Util 850618 Application for Amend to License NPF-21,revising Tech Spec 3.8.4.2 Re Primary Containment Penetration Conductor Overcurrent Devices
| title = Advises That State of Wa Energy Facility Site Evaluation Council Concurs W/Util 850618 Application for Amend to License NPF-21,revising Tech Spec 3.8.4.2 Re Primary Containment Penetration Conductor Overcurrent Devices
| author name = ESCHELS C
| author name = Eschels C
| author affiliation = WASHINGTON, STATE OF
| author affiliation = WASHINGTON, STATE OF
| addressee name = BUTLER W R
| addressee name = Butler W
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000397
| docket = 05000397

Revision as of 00:11, 19 June 2019

Advises That State of Wa Energy Facility Site Evaluation Council Concurs W/Util 850618 Application for Amend to License NPF-21,revising Tech Spec 3.8.4.2 Re Primary Containment Penetration Conductor Overcurrent Devices
ML17278A251
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/27/1985
From: Eschels C
WASHINGTON, STATE OF
To: Butler W
Office of Nuclear Reactor Regulation
References
TAC-57993, NUDOCS 8507020531
Download: ML17278A251 (4)


Text

REGULA.Y INFORMATION DISTRIBUTI SYSTEM (RIDS)r.<<ACCESSION NBR:8507020531 DOC~DATE~85/06/27, NOTARIZED:'O DOCKET FACIL:50-397 HPPSS Nuclear Projects Unit 2g llashington Public Powe 05000397 AUTH NAME AUTHOR AFFILIATION KSCHKLSgC, Nashingtonr

'State of REC IP~NAME RECIPIENT AFFILIATION BUTLERt>~RE Licensing Branch 2

SUBJECT:

Advises that, State of llA Ener gy Facility Site Evaluation Council concurs w/util 850618 application for amend to License NPF-21irevising Tech Spec 3,8',2',e.primary.

containment penetration conductor over current devices;DISTRIBUTION CODE: A001D COPIES RECEI)ED:LTR,"ENCL SIZE'ITLE:

OR Submittali General Distribution NOTES: OL~12/20/83 05000397 RECIP IENT ID CODE/NAME NRR LB2 BC 01 INTERNAL;ACRS 09 El D/HDS2 NRR/DL DIR NRR/DL/TSRG NRR/DSI/RAB RGN5 COPIES'TTR ENCL 6 1 1 1 1 1 REC IP IENT ID CODE/NAME ADM/LFMB NRR/DE/MTEB NRR/DL/ORAB MKTB REG F IL 04COPIES LTTR ENCL 1 1 1 1 1 1 EXTERNAL: 24X LPDR NSIC 03 05 KGLG BRUSKEgS NRC PDR 02 1 1 0 TOTAL NUMBER OF COPIES REQUIRED'TTR 28 ENCl v s sl y g serg g+O~Curtis Pschels Chairman STATE OF WASHINCTON ENERCY FACILITY SITE EVALUATION COUNCIL Mail Stop PY.71 o Olympia, Washington 98504 o (206)4594490 o (SCAN)5854490 3une 27, 1985 Q5qcng9g Director of Nuclear Reactor Regulations Attention:

Mr.W.R.Butler, Chief Licensing Branch No.2, Division of Licensing U.S.Nuclear Regulatory Commission Washington, D.C.20555

Dear Mr.Butler:

SUBJECT:

AMENDMENT TO FACILITY OPERATING LICENSE NPF-21, WPPSS NUCLEAR PRO3ECT NO.2 During their regular meeting of June 20 1985, the Washington State Energy Facility Site Evaluation Council reviewed and subsequently adopted a motion indicating their concurrence with the Washington Public.Power Supply System's request, by letter dated 3une 18, 1985, for an emergency change to the Operating License for Nuclear Project No.2.Specifically, the Supply System's request involves an emergency change to Technical Specification 3.8.0.2, Primary Containment Penetration Conductor Overcurrent Protective Devices.The Council was notified of the proposed amendment request by the Supply System in accordance with the notification requirements of 10 CFR 50.91.We appreciate the opportunity to review the proposed license amendment.

Sincerely, Curtis Eschels Chairman CE:MM:ab cc: Don Mazur, WPPSS 3erry Sorensen, WPPSS 3ohn Bradfute, NRC.850702053i 850b27 PDR ADDCN, 05000397 P PDR 0