Letter Sequence Other |
|---|
|
|
MONTHYEARML20262D8641976-03-26026 March 1976 Piping & Instrumentation Diagram: Type Gs,Oil Piping Diagram Project stage: Other GO2-85-098, Application for Amend to License NPF-21,revising Tech Spec Tables 3.3.3-1,3.3.3-2 & 4.3.3.1-1 Re HPCS Pump Discharge Pressure High Signal.High Discharge Signal Will Be Replaced W/Pump Breaker Running Input.Fee Paid1985-02-27027 February 1985 Application for Amend to License NPF-21,revising Tech Spec Tables 3.3.3-1,3.3.3-2 & 4.3.3.1-1 Re HPCS Pump Discharge Pressure High Signal.High Discharge Signal Will Be Replaced W/Pump Breaker Running Input.Fee Paid Project stage: Request ML17277B6361985-02-27027 February 1985 Proposed Changes to Tech Spec Tables 3.3.3-1,3.3.3-2 & 4.3.3.1-1 Re HPCS Pump Discharge Pressure High Signal Project stage: Request GO2-85-133, Application for Amend to License NPF-21,changing Tech Spec Tables 3.3.2-1,3.3.2-2,3.3.2-3 & 4.3.2.1-1 Re Isolation Actuation Instrumentation Trip Setpoints & Allowable Values. Fee Paid1985-03-13013 March 1985 Application for Amend to License NPF-21,changing Tech Spec Tables 3.3.2-1,3.3.2-2,3.3.2-3 & 4.3.2.1-1 Re Isolation Actuation Instrumentation Trip Setpoints & Allowable Values. Fee Paid Project stage: Request ML17277B6601985-03-13013 March 1985 Proposed Tech Specs,Changing Tables 3.3.2-1,3.3.2-2,3.3.2-3 & 4.3.2.1-1 Re Isolation Actuation Instrumentation Trip Setpoints & Allowable Values Project stage: Other GO2-85-137, Application for Amend to License NPF-21,authorizing Relief for One Time Only from Tech Spec 4.4.3.2-1 Requirement of Leak Testing of RCS Pressure Isolation Valves RCIC-V-66, RCIC-V-13 & RHR-V-231985-03-14014 March 1985 Application for Amend to License NPF-21,authorizing Relief for One Time Only from Tech Spec 4.4.3.2-1 Requirement of Leak Testing of RCS Pressure Isolation Valves RCIC-V-66, RCIC-V-13 & RHR-V-23 Project stage: Request ML17277B6641985-03-14014 March 1985 Proposed Tech Spec Table 4.4.3.2-1, RCS Pressure Isolation Valves, Deferring Leak Testing for Valves RCIC-V-66, RCIC-V-13 & RHR-V-23 Until First Refueling Outage Project stage: Other GO2-85-148, Requests That Target Date of 850601 Be Established for Final Disposition of 850227 Application for Amend to License NPF-21,changing Tech Specs for HPCS Pump Discharge Pressure - High Signal1985-03-18018 March 1985 Requests That Target Date of 850601 Be Established for Final Disposition of 850227 Application for Amend to License NPF-21,changing Tech Specs for HPCS Pump Discharge Pressure - High Signal Project stage: Request ML17277B7201985-04-19019 April 1985 Proposed Tech Spec Changes to Provide Written Description of Location of Thermocouples Used to Determine Drywell Average Air Temp in Lieu of Specific Elevations/Azimuths Project stage: Other GO2-85-209, Application for Amend to License NPF-21,changing Tech Spec Surveillance Requirement 4.6.1.7 to Provide Written Description of Location of Thermocouples Used to Determine Drywell Average Air Temp.Fee Paid1985-04-19019 April 1985 Application for Amend to License NPF-21,changing Tech Spec Surveillance Requirement 4.6.1.7 to Provide Written Description of Location of Thermocouples Used to Determine Drywell Average Air Temp.Fee Paid Project stage: Request ML20197J5461985-04-22022 April 1985 Forwards Reactor Sys Branch SER Re Util 850227 Application to Amend License NPF-21,changing Tech Specs.Licensee Proposed Mods for HPCS Pump Discharge Pressure High Flow Signal Acceptable.Salp Input Also Encl Project stage: Other GO2-85-251, Application for Amend to License NPF-21,License Condition 18,eliminating High Drywell Pressure Signal from Automatic Depressurization Sys Initiation Logic,Thereby Making Low Pressure ECCS Qualified as High Pressure Sys.Fee Paid1985-05-16016 May 1985 Application for Amend to License NPF-21,License Condition 18,eliminating High Drywell Pressure Signal from Automatic Depressurization Sys Initiation Logic,Thereby Making Low Pressure ECCS Qualified as High Pressure Sys.Fee Paid Project stage: Request GO2-85-275, Requests That 850516 Application to Amend License NPF-21, Revising Tech Specs for Automatic Depressurization Sys Logic Mods,License Condition 18,be Processed on Exigent Basis to Avoid Startup Delay1985-05-29029 May 1985 Requests That 850516 Application to Amend License NPF-21, Revising Tech Specs for Automatic Depressurization Sys Logic Mods,License Condition 18,be Processed on Exigent Basis to Avoid Startup Delay Project stage: Request GO2-85-286, Provides Further Justification for 850529 Request That 850516 Application for Amend to License NPF-21 Re Automatic Depressurization Sys Logic Mods Be Processed Under Exigent Circumstances1985-05-31031 May 1985 Provides Further Justification for 850529 Request That 850516 Application for Amend to License NPF-21 Re Automatic Depressurization Sys Logic Mods Be Processed Under Exigent Circumstances Project stage: Request GO2-85-302, Requests That Util 850227,0313 & 0516 Requests for Amends to Tech Specs Re HPCS Pump Discharge pressure-high Signal, Isolation Actuation Instrumentation Setpoints & Delta Temps & ADS Logic Be Processed on Exigent & Emergency Bases1985-06-11011 June 1985 Requests That Util 850227,0313 & 0516 Requests for Amends to Tech Specs Re HPCS Pump Discharge pressure-high Signal, Isolation Actuation Instrumentation Setpoints & Delta Temps & ADS Logic Be Processed on Exigent & Emergency Bases Project stage: Other ML17278A2411985-06-12012 June 1985 Amend 10 to License NPF-21,revising Tech Spec 4.4.3.2.2 Re RCS Surveillance Requirements to Provide one-time Only Relief of Leak Testing for 3 of 18 RCS Pressure Isolation Valves Project stage: Other ML17278A2431985-06-12012 June 1985 Safety Evaluation Supporting Amend 10 to License NPF-21 Project stage: Approval ML17278A2311985-06-17017 June 1985 Recommends Approval of Util 850419 Proposed Tech Spec, Changing Surveillance Requirement 4.6.1.7 Re Elevation & Azimuth Location of Thermocouples,Per Original Spec to Inlet Locations of Air Coolers Project stage: Other ML17278A2391985-06-21021 June 1985 Advises of Adoption of Series of Motions Indicating Concurrence W/Listed Amends to License NPF-21 Re HPCS Pump Discharge Pressure,Isolation Actuation Instrumentation & RCS Pressure Isolation Valves Project stage: Other ML17278A2941985-06-23023 June 1985 Comments on 850227 Application for Amend to License, Replacing High Discharge Signal W/Pump Running Input from Pump Breaker.Proposed Changes Will Not Solve Problem. Reevaluation of Proposed Amend Urged Project stage: Request ML17278A2591985-06-25025 June 1985 Safety Evaluation Supporting Amend 12 to License NPF-21 Project stage: Approval ML17278A2561985-06-25025 June 1985 Amend 12 to License NPF-21,changing Isolation Actuation Trip Setpoints & Allowable Values to Reflect More Realistic Values as Determined by Plant Operation Project stage: Other ML17278A2661985-06-25025 June 1985 Safety Evaluation Supporting Amend 13 to License NPF-21 Project stage: Approval ML17278A2641985-06-25025 June 1985 Amend 13 to License NPF-21,permitting Replacement of High Pressure Coolant Sys Pump Discharge Pressure Signal W/Pump Running Signal Taken Directly from Pump Breaker Project stage: Other ML17278A2541985-06-25025 June 1985 Amend 11 to License NPF-21,changing Tech Specs to Remove Automatic Depressurization Sys High Drywell Pressure Instrumentation & to Add Manual Inhibit Switches to Automatic Depressurization Sys Logic Project stage: Other ML17278A3171985-07-18018 July 1985 Amend 15 to License NPF-21,revising Tech Specs Re Drywell Average Air Temp (Surveillance Requirement 4.6.1.7) to Provide Description of Locations of Thermocouples Used to Measure Drywell Average Temp Instead of Specific Elevations Project stage: Other ML17278A3191985-07-18018 July 1985 Safety Evaluation Supporting Amend 15 to License NPF-21 Project stage: Approval 1985-05-29
[Table View] |
Text
REM TO INFORMATION DISTRIBU N
STEM (RIDS)
ACCESSION NBR:8506260460 DOC ~ DATE: 85/06/21 NOTARIZED:
NO DOCKET FACIL:50-397 NPPSS Nuclear Projects Unit 2'i Nashi,ngton Public Powe 05000397 AUTHAME AUTHOR AFFILIATION ESCHELSgC
~
Hashingtoni State of REC IP, NAME RECIPIENT AFFILIATION SCHNENCEReA, Licensing Branch
?
SUBJECT:
Advises of adoption of series of motions indicating concurrence w/listed amends to License NPF-21 re HPCS pump discharge pressureiisolation actuation instrumentation 8
RCS pressure, isolation valves, DISTRIBUTION CODE:
A001D COPIES RECEIVED:LTR ENCL TITLE:
OR Submittal:
General Distribution NOTES: OL;12/20/83, SIZE 05000397 RECIPIENT ID CODE/NAME>
NRR LB2, BC 01 INTERNAL: ACRS 09 ELD/HDS2 NRR/DL D IR NRR/DL/TSRG NRR/DS I/RAB RGN5 COPIES LTTR ENCL RECIPIENT ID CODE/NAME ADM/LFMB NRR/DE/MTEB NRR/DL/ORAB N
DS I/METB E
04 COPIES" LTTR ENCL' 1
1 ~
1 1
EXTERNAL: 24X LPDR NSIC 03 05 EGEG BRUSKEpS NRC PDR 02 TOTAL NUMBER OF COPIES REQUIRED; LTTR 28 ENCL
4 (g
~ ~
"II.f""W f 44 g>
I WW 4 f, II '
f f
w l' t
II 4
41 f ',)f
~ 4a' 1
4 4
)I f 'wwf 14W f '1'i W ')r
-q $,.4f g 4"44 f
~
4 4' (I'4'f S
wl II, f
%f "I w Pc.>
eifm44 myeWee&ea E
>t 4~~
,p w
4' 4
"",jT '<<>,f II' 4I 1
'1 III II' 1
I fl I.W'WII W y'g
'w I s w' w ~
I g 4
h 44 l
g +TA7g g+
O~
y Curtis Eschels Chairmari 3une 21, 1985 STATE OF WASHINCTON ENERGY FACILITY SITE EVALUATION COUNCIL Mail Stop PY-11 o
Olympia, Washington 98504 o
(206) 45M490 o
(SCAN) 5854490 I
Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Licensing Branch No. 2, Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Mr. Schwencer:
SUBJECT:
AMENDMENTSTO FACILITYOPERATING LICENSE NPF-21, WPPSS NUCLEAR PRO3ECT NO. 2 During their regular meeting of 3une 10, 1985, the Washington State Energy Facility Site Evaluation Council reviewed and subsequently adopted a series of motions indicating their concurrence with the following requests for amendments to NRC's Operating License for the Washington Public Power Supply System's Nuclear Plant No. 2.
Supply System SUB3ECT
, Feb. 27, 1985 Mar. 13, 1985 Mar. 10, 1985 Apr. 19, 1985 May 16, 1985 HPCS Pump Discharge Pressure - High Signal (Tables 3.3.3-1, 3.3.3-2, and tl.3.3.1-1)
Changes to Isolation Actuation Instrumentation (Tables 3.3.2-1, 3.3.2-2, 3.3.2-3, and 0.3.2.1-1)
Reactor Coolant System Pressure Isolation Valves (Table 3.0.3.2-1)
Surveillance Requirement 0.6.1.7 - Drywell Air Temperature Measurements Automatic Depressurization System Logic Modifications, Lic. Condition 18 The Council's concurrence with the above amendment requests was telephonically transmitted to Mr. 3ohn Bradfute, NRC's WNP-2 Project Manager, on 3une 17, 1985.
We should also note that the Council received copies of these amendments from the Supply System in accordance with the notification requirements of 10 CFR 50.91.
We appreciate the opportunity to review the proposed license amendments.
Sine
- ely, Curtis Eschels Chairman CE:MM:ab CC:
Don Mazur, WPPSS 3erry Sorensen, WPPSS 3ohn Bradfute, NRC 85062604h0 850h21 PDR ADQCK 05000397 P
PDR
~ f
-I
" l l= J 0