Other: GO2-86-060, Responds to Exxon Nuclear Corp 860617 Notification That NRC Considered Updated Hot Channel Delta CPR Methodology in Cotransa Model to Be Unreviewed.Addl Calculation Performed. No Further Action Necessary, GO2-86-113, Advises That Submittal of Base Licensing Amend Delayed Until 860301 Based on Recent Operating History.Suppl Will Be Submitted on 860501 to Address Actual Conditions.Spring Outage Scheduled for 860415 & Cycle 2 for 860602, GO2-86-381, Forwards NEDC-31107, Safety Review of WPPSS Nuclear Project 2 at Core Flow Conditions Above Rated Flow Throughout Cycle I & Final Feedwater Temp Reduction, Per 860226 Commitment, ML17278A575, ML17278A805, ML17278A846, ML17278A863, ML20206K639
|
MONTHYEARML20206K6391972-05-31031 May 1972 Ack Receipt of Re Technical Basis for Accepting Weld Surface Area W/Bluish Tint.No Further Questions Project stage: Other ML17278A2521985-06-26026 June 1985 Notification of 850627 Meeting W/Util & Exxon in Bethesda,Md to Identify & Clarify Preliminary Requirements for First Refueling of Plant Project stage: Meeting ML17278A3201985-07-26026 July 1985 Summary of 850627 Meeting W/Util & Exxon Nuclear in Bethesda,Md Re Util Plans & Preparations for Cycle 2 Core Reload Currently Scheduled for Spring 1986.List of Attendees & Viewgraphs Encl Project stage: Meeting ML17278A5301985-12-20020 December 1985 Tech Specs Changing Time for Purging Through Standby Gas Treatment Sys to 150 H Per 365 Days from Present 90 H Allotted Project stage: Other GO2-85-858, Application for Amend to License NPF-21,revising Tech Spec Sections 3.6.1.8 & 4.6.1.8.3 to Change Time for Purging Through Standby Gas Treatment Sys to 150 H Per 365 Days from Present 90 H Allotted.Fee Paid1985-12-20020 December 1985 Application for Amend to License NPF-21,revising Tech Spec Sections 3.6.1.8 & 4.6.1.8.3 to Change Time for Purging Through Standby Gas Treatment Sys to 150 H Per 365 Days from Present 90 H Allotted.Fee Paid Project stage: Request GO2-85-895, Amends 851220 Application for Amend to License NPF-21 & Requests one-time Only Change to Tech Specs,Revising Standby Gas Sys Purge Limit from 90 to 150 H1985-12-31031 December 1985 Amends 851220 Application for Amend to License NPF-21 & Requests one-time Only Change to Tech Specs,Revising Standby Gas Sys Purge Limit from 90 to 150 H Project stage: Request ML17278A5751986-01-17017 January 1986 Proposed Tech Spec Table 3.8.4.3-1 Re Motor Operated Valves Thermal Overload Protection Project stage: Other GO2-86-081, Application for Amend to License NPF-21,changing Tech Specs to Add Auxiliary Steam & Fuel Pool Cooling Sys Valves to Update Table 3.8.4.3-1 Re Motor Operated Valves Thermal Overload Protection.Fee Paid1986-01-17017 January 1986 Application for Amend to License NPF-21,changing Tech Specs to Add Auxiliary Steam & Fuel Pool Cooling Sys Valves to Update Table 3.8.4.3-1 Re Motor Operated Valves Thermal Overload Protection.Fee Paid Project stage: Request GO2-86-113, Advises That Submittal of Base Licensing Amend Delayed Until 860301 Based on Recent Operating History.Suppl Will Be Submitted on 860501 to Address Actual Conditions.Spring Outage Scheduled for 860415 & Cycle 2 for 8606021986-01-30030 January 1986 Advises That Submittal of Base Licensing Amend Delayed Until 860301 Based on Recent Operating History.Suppl Will Be Submitted on 860501 to Address Actual Conditions.Spring Outage Scheduled for 860415 & Cycle 2 for 860602 Project stage: Other GO2-86-282, Application for Amend to License NPF-21,extending Time Period for Reg Guide 1.97,Rev 2 Implementation to Prior to Startup Following Second Refueling Outage.Fee Paid1986-03-28028 March 1986 Application for Amend to License NPF-21,extending Time Period for Reg Guide 1.97,Rev 2 Implementation to Prior to Startup Following Second Refueling Outage.Fee Paid Project stage: Request ML17278A8051986-03-31031 March 1986 Safety Review of WPPSS Nuclear Project 2 at Core Flow Conditions Above Rated Flow Throughout Cycle 1 & Final Feedwater Temp Reduction Project stage: Other GO2-86-311, Clarifies 860226 Application for Amend to License NPF-21, Revising Tech Specs to Support Operation of Plant at Full Rated Power During Cycle 2.Changes Discussed to Expedite Staff Review of Request1986-04-0707 April 1986 Clarifies 860226 Application for Amend to License NPF-21, Revising Tech Specs to Support Operation of Plant at Full Rated Power During Cycle 2.Changes Discussed to Expedite Staff Review of Request Project stage: Request GO2-86-332, Requests Withdrawal of 851220 & 31 Requests for Amend to License NPF-21,revising Tech Specs to Change Standby Gas Sys Limit from 90 to 150 H.Amend No Longer Needed Since Refueling Outage Began Earlier than Expected1986-04-10010 April 1986 Requests Withdrawal of 851220 & 31 Requests for Amend to License NPF-21,revising Tech Specs to Change Standby Gas Sys Limit from 90 to 150 H.Amend No Longer Needed Since Refueling Outage Began Earlier than Expected Project stage: Withdrawal GO2-86-339, Clarifies 860328 Application for Amend to License NPF-21, Revising License Condition 16 to Delay Implementation of Reg Guide 1.97 Requirements Until Second Refueling Outage1986-04-11011 April 1986 Clarifies 860328 Application for Amend to License NPF-21, Revising License Condition 16 to Delay Implementation of Reg Guide 1.97 Requirements Until Second Refueling Outage Project stage: Request GO2-86-367, Provides Supplemental Info Re 860226 Reload Summary Rept Concerning Changes in Expected Cycle 2 Reload Batch.Meeting Requested to Address NRC Concerns w/860520 Restart Date1986-04-24024 April 1986 Provides Supplemental Info Re 860226 Reload Summary Rept Concerning Changes in Expected Cycle 2 Reload Batch.Meeting Requested to Address NRC Concerns w/860520 Restart Date Project stage: Supplement GO2-86-370, Forwards XN-NF-85-138(P), LOCA Break Spectrum Analysis for BWR 5 & Affidavit for Withholding,In Support of Request for Amend to Tech Specs Re Cycle 2 Reload.W/O Rept1986-04-25025 April 1986 Forwards XN-NF-85-138(P), LOCA Break Spectrum Analysis for BWR 5 & Affidavit for Withholding,In Support of Request for Amend to Tech Specs Re Cycle 2 Reload.W/O Rept Project stage: Request GO2-86-381, Forwards NEDC-31107, Safety Review of WPPSS Nuclear Project 2 at Core Flow Conditions Above Rated Flow Throughout Cycle I & Final Feedwater Temp Reduction, Per 860226 Commitment1986-04-30030 April 1986 Forwards NEDC-31107, Safety Review of WPPSS Nuclear Project 2 at Core Flow Conditions Above Rated Flow Throughout Cycle I & Final Feedwater Temp Reduction, Per 860226 Commitment Project stage: Other ML17279A6481986-05-0101 May 1986 Draft Lead Test Assembly Program,Wpps 2 Project stage: Draft Other GO2-86-408, Submits Addl Clarification to 860328 Request for Amend to License NPF-21,requiring Implementation of Fully Qualified wide-range Suppression Pool Level Monitoring Sys Meeting Reg Guide 1.97,Rev 2 Requirements1986-05-0707 May 1986 Submits Addl Clarification to 860328 Request for Amend to License NPF-21,requiring Implementation of Fully Qualified wide-range Suppression Pool Level Monitoring Sys Meeting Reg Guide 1.97,Rev 2 Requirements Project stage: Supplement GO2-86-411, Withdraws 860328 Request to Defer Qualification of Six Psr Valves Until Second Refueling Outage,Per 860328 Application for Amend to License NPF-211986-05-0808 May 1986 Withdraws 860328 Request to Defer Qualification of Six Psr Valves Until Second Refueling Outage,Per 860328 Application for Amend to License NPF-21 Project stage: Request ML17278A8411986-05-22022 May 1986 Provides Supplemental Info to 860226 Application to Amend License NPF-21 Re Cycle 2 Reload.Use of Two Separate Sets for two-loop Operating Limits for Fuel Types & Separate Set for Single Loop proposed.Marked-up Tech Specs Encl Project stage: Supplement ML17278A8651986-05-23023 May 1986 Safety Evaluation Supporting Amend 27 to License NPF-21 Project stage: Approval ML17278A8631986-05-23023 May 1986 Amend 27 to License NPF-21,revising Tech Spec Table 3.8.4.3-1, Motor-Operated Valves Thermal Overload Protection, to Add Valves Previously Omitted,Add Valves Due to Sys Upgrades & Remove nonsafety-related Valves Project stage: Other ML17278A8481986-05-23023 May 1986 Safety Evaluation Supporting Amend 28 to License NPF-21 Project stage: Approval ML17278A8461986-05-23023 May 1986 Amend 28 to License NPF-21,revising Tech Specs to Support Operation of Facility at Full Rated Power During Cycle 2 & Establishing Operating Limits for All Fuel Types Project stage: Other ML17278A8551986-05-23023 May 1986 Amend 25 to License NPF-21,revising License Condition 2.C.(16) to Require Implementation of Requirements of Rev 2 to Reg Guide 1.97 W/Exception of Flux Monitoring,Prior to Startup Following First Refueling Outage Project stage: Other ML17278A8571986-05-23023 May 1986 Safety Evaluation Supporting Amend 25 to License NPF-21 Project stage: Approval ML17278A8801986-05-29029 May 1986 Offers No Comments on 860117,0226 & 0328 Requests for Amends to License NPR-21.Request for 1-yr Extension to Install Wetwell Level Monitoring Sys Acceptable But Installation Should Be Completed by Second Fuel change-out Project stage: Request GO2-86-060, Responds to Exxon Nuclear Corp 860617 Notification That NRC Considered Updated Hot Channel Delta CPR Methodology in Cotransa Model to Be Unreviewed.Addl Calculation Performed. No Further Action Necessary1986-06-27027 June 1986 Responds to Exxon Nuclear Corp 860617 Notification That NRC Considered Updated Hot Channel Delta CPR Methodology in Cotransa Model to Be Unreviewed.Addl Calculation Performed. No Further Action Necessary Project stage: Other ML17278A9351986-07-16016 July 1986 Notice of Withdrawal of 851220,31 & 860328 Applications for Amends to License NPF-21 Project stage: Withdrawal 1986-04-24
[Table View] |
Text
~r REGUL I NFQRNAT ION DISTR IBUT STEH
( R XDS >
ACCESSION NBR: 8606030i47 DOC. DATE: B6/05/29 NOTARIZED:
NO FACIL:5'0-397 WPPSS Nuclear Progecti Unit 2>
Mashington Publi c Powe AUTH. NAVE AUTHOR AFFILIATION WALLISiC. R.
Wash ing toni State of REC IP. NANE RECIPIENT AFFXLIATIQN ADENSAN> E. G.
BWR Prospect Directorate 3
DOCKET 0 05000397
SUBJECT:
Offers no comments on 860ii7i 0226 8t 0328 requests for amends to License NPR-2i. Request For i-gr extension to install wetlael 1 level monitoring sgs acceptable but installation should be completed bg second fuel change-out.
DISTRIBUTION CODE'OOiD COPIES RECEIVED'TR ENCL SIZE:
TITLE:
QR Submittal:
General Distribution NOTES:
RECIP XENT XD CODE/NANE BWR ADTS BWR E1CSB BMR PD3 PD Oi BWR PSB INTERNAL ACRS ELD/HDS2 NRR/ORAS RGN5 COP IES LTTR ENCL RECIP IENT ID CODE/NANE BWR EB BWR FOB BRADFUTEi J BWR RSB ADN/LFNB D FT/TSCB XL 04 COPIES LTTR ENCL EXTERNAL: 24X LPDR NSIC 03 05 EGZcG BRUSKE~ S NRC PDR 02 TOTAL NUNBER OF COPIES REQUIRED:
LTTR 30 ENCL
t 3Pe.,a
>'9,
'. i C".PUl'0 (tl(l7 Q ) j a 0 I Ink' TLQGL HTwwp Ql gQL 7/c( l )ai 'I'II 13,"<i,<< lXl:>lATQi
""' CQ"~h8:3I AU.QQ<a X 0 l 0f:Qh',,
~h'adg'i P
L a tiu l aalu "P'pc'jr. 'j'll f.a 0f aaa,,"
ed.a>d "a'~a
'", au I:aua, f "H
~a KGIl';P'sK lY. l lh Va)l.ll'aJh 1'0 9<<i'pi (< p
~Aa')
~ 9<a F al pA YiGI a'Ai.lY.'l.ch l'l i 'Y ~~I.3 ill C
~ ~ 5
< u 0 v s 'f i.'<
.ViQ<< lji')~ "-:ijan@
J j
'l~",Vi Na <1',>>
.H.;3,:X.<<.>>; '"
'i"aP la RI 3:l"
.'3.'. <YafaQ"A ~<."jo
,'l i)af 9I ss
'a'u 't P.'k
'$uia
~ 8" >~'~
Pf 6~~90 aVl IG<~U a'au
'"'l'(aBejaao 9 Q.a
"al "'HU
tf ala V J >.'a a,! af a,'u k sa'"> a: l A'.J '
'.i
'T g'"~p
'io> 0'a',aalu'p'kH k a' li'1
'$p! a'a;a ') 4-:'~r fac K4'> >. f.,lia'i ti'.
fvljN
'3 ) jjl PÃ>)9 3 DG
- c. MP pP".E.'lot gaaool J 9v'aK I 4~14'.l 'wIH
..'ru>>-"apn'r~aa~
Lev& brro~e.".
pd laalf~Iqmo a sd b>a<a<<.'
f~'. t,::
. i')Vl'.'.. S'a l:GGVI333R 2="I'QJ GEAOh
'"463 l iUI l'tJ lI;,TViG llQ1+0 d s w8'c!i6 I".~v.)n'.>9: XofJi':aa'.>uU
"$Q
~ "1 "a'p)i f.',.3 k'IOQ
..l".'3NZ HV l i f
Jt TViHI'
ihNXiGU3 6~ iaAB GQ j R'$H 4 i.3T(a 8(iAHG 63k RNR Hid'~P 5%i'iQA ai'3>>'P T'iT""HI",a87i Vl baa
. ll-l QHR p
'3 cfo')
H]11
'3 C,
1Vi lI'lID H
'll'ihh'xJGQ;3 Q)i 8,i'0')
NWa'.
Hi>> 34".
$ lWai l.<3 aS~c l'lA'l 'rll~aq
>'Uq c
';<<.'Gt"i'j.A,l-a
.~A a>X:aNa a
~"Ji
'>a P
P a3 i:N~i~UAH 9>8A3
~;Q gCa4 3$aN PjP l'l ~ ~
"<I'l I a3 Ify)ill
j
-'la CURTS EKHELS Chairman g serg g+
O~4
< isa~ +
STATE OF WASHINGTON ENERCY FACILITY SITE EVALUATION COUNCIL Mail Stop PY-11 o
Olympia, Washington 98504 o
(206) 4594490 o
(SCAN) 5854490 May 29, 1986 Director of Nuclear Reactor Regulation Attention: Ms. E.G. Adensam, Project Director BWR Project Directorate No. 3 Division of BWR Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Ms. Adensam:
SUBJECT:
AMENDMENTSTO FACILITYOPERATING LICENSE NPF-21, WPPSS NUCLEAR PROJECT NO. 2 During their regular meeting of May 27, 1986, the Washington State Energy Facility Site Evaluation Council reviewed and adopted motions indicating that the Council had no comments on the following requests for amendments to NRC's Operating License for the Washington Public Power Supply System's Nuclear Plant No. 2.
Supply System SUBJECT Re uest for Amendment to Technical S ecifications For:
January 17, 1986 February 26, 1986 March 28, 1986 Changes to Table 3.8.0.3-1 "Motor Operated Valves Thermal Overload Protection," to (1) delete valves which are not safety-related, and (2) add valves due to equipment qualification concerns; Reload License Amendment (Cycle 2) -Allowthe use of fuel assem-blies designed and manufactured by Exxon Nuclear Company for the Cycle 2 reload; Item 3(a)
Modify to extend the implementation date for Regulatory Guide 1.97, Revision 2, from prior to start up following the first refueling outage to prior to start up following the second refueling outage for the Suppression Pool Water Level Monitoring System.
In considering the March 28 request to extend the period for installing the wetwell level monitoring system, the Council found the one year extension to be acceptable, but made the 8606030147 860529 PDR ADOCK 05000397 P
PDR I 0
j
Ms. E. G. Adensam May 29, 1986 Page 2 observation that installation of the level monitoring system should be completed no later than the second fuel change-out.
The Council was notified of these amendment requests by the Supply System in accordance with the notification requirements of 10CFR 50.91.
We appreciate the opportunity to review the proposed license amendments.
S
- rely, C Robert Wallis Acting Chairman CRW:MM:ab cc:
D. W. Mazur, WPPSS G. C. Sorensen, WPPSS J. O. Bradfute, NRC