Issue date: 04/03/1986
From: Eschels C
WASHINGTON, STATE OF
To: Adensam E
Office of Nuclear Reactor Regulation
References
TAC-60546, NUDOCS 8604090039
Download: ML17278A684 (4)


Text

REGULATO FORNATION DISTRIBUTION N (RIDS)

ACCESSION, NBR: 8604090039 DOC. DATE: 86/04/03 NOTARIZED: NO DOCKET

'AC IL: 50-397 WPPSS Nuclear Progec ti Unit 2i Washington Public Powe 05000397 AUTH. NANFr AUTHOR AFFILIATION ESCHELSi C. " Washing toni State of RECIP. MANE RECIPIENT AFFILIATION ADENSAMa E. Q. BWR Prospect Directorate 3

SUBJECT:

Notifies of motion adopted on 860324 offering no comments on WPPSS 860117 application for amend to License NPF-.21.

First refueling outage scheduled to begin on 860401. Plant will complete leak rate test during refueling outage.

DISTRIBUTION CODE: A001D COPIES RECEIVED: LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution NOTES:

REC IP IENT COPIES REC IP IENT COPIES ID CODE/NANE LTTR ENCL ID CODE/NAME LTTR ENCL BWR ADTS BWR EB BWR EICSB BWR FOB BWR PD3 PD 01 BRADFUTEt J BWR PSB BWR RSB INTERNAL: ACRS 09 ADN/LFNB 1 ELD/HDS2 NRR/DHFT/TSCB NRR/ORAS 04 1 RGN5 EXTERNAL: 24X 1 EG8cQ BRUSKE> S LPDR 1 NRC PDR 02 NSIC 1 1 TOTAL NUNBER OF COPIES REQUIRED: LTTR 30 ENCL

' rh,t"

'h

sTAlo g+r O~

CURI5 ESCHEI5 Chairman < inca +

STATE OF WASHINGTON ENERCY FACILITY SITE EVALUATION COUNCIL Mail Stop PV-11 o Olympia, Washington 98504 o (206) 4594490 o (SCAN) 5854490 April 3, 1986 Director of Nuclear Reactor Regulation Attention: Ms. E. G. Adensam, Project Director BWR Project Directorate No. 3 Division of BWR Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Ms. Adensam:

SUBJECT:

AMENDMENT TO FACILITYOPERATING LICENSE NPF-21, WPPSS NUCLEAR PROJECT NO.2 During their regular meeting of March 20,1986, the Washington State Energy Facility Site Evaluation Council reviewed and adopted a motion indicating that the Council had no comments on the Washington Public Power Supply System's request, by letter dated January 17,1986, to amend the Operating License for Nuclear Project No. 2.

The Supply System's request involved a change to the surveillance requirements under technical 'specification 0.6.1.2.d, and an exemption from a provision of Appendix J to CFR Part 50 Section III.D, to allow for postponement of the WNP-2 drywell head "0" ring type B test until the reactor is shutdown for the first refueling outage. That outage is now scheduled to begin on April 1, 1986, and the plant will complete the leak rate test during the refueling outage.

The Council was notified of the proposed amendment request by the Supply System in accordance with the notification requirements of 10 CFR 50.91.

We appreciate the opportunity to review this license amendment.

Sincerely, Sb04090039 Sb0403 PDR ADOCK 05000397 P PDR Curtis Eschels

'hairman CE:MM:ab cc: D.W. Mazur, WPPSS G.C. Sorensen, WPPSS J.O. =Bradfute, NRC