Text
ACCESSION, NBR:
'ACIL: 50-397 AUTH. NANFr ESCHELSi C. "
RECIP. MANE ADENSAMa E. Q.
REGULATO FORNATION DISTRIBUTION N (RIDS) 8604090039 DOC. DATE: 86/04/03 NOTARIZED:
NO WPPSS Nuclear Progec ti Unit 2i Washington Public Powe AUTHOR AFFILIATION Washing toni State of RECIPIENT AFFILIATION BWR Prospect Directorate 3
DOCKET 05000397
SUBJECT:
Notifies of motion adopted on 860324 offering no comments on WPPSS 860117 application for amend to License NPF-.21.
First refueling outage scheduled to begin on 860401. Plant will complete leak rate test during refueling outage.
DISTRIBUTION CODE:
A001D COPIES RECEIVED: LTR ENCL SIZE:
TITLE:
OR Submittal:
General Distribution NOTES:
REC IP IENT ID CODE/NANE BWR ADTS BWR EICSB BWR PD3 PD 01 BWR PSB COPIES LTTR ENCL REC IP IENT ID CODE/NAME BWR EB BWR FOB BRADFUTEt J BWR RSB COPIES LTTR ENCL INTERNAL: ACRS ELD/HDS2 NRR/ORAS RGN5 EXTERNAL: 24X LPDR NSIC 09 1
1 1
1 ADN/LFNB NRR/DHFT/TSCB 04 EG8cQ BRUSKE> S NRC PDR 02 1
1 TOTAL NUNBER OF COPIES REQUIRED:
LTTR 30 ENCL
rh,t"
'h
CURI5 ESCHEI5 Chairman r sTAlo g+
O~
< inca +
STATE OF WASHINGTON ENERCY FACILITY SITE EVALUATION COUNCIL Mail Stop PV-11 o
Olympia, Washington 98504 o
(206) 4594490 o
(SCAN) 5854490 April 3, 1986 Director of Nuclear Reactor Regulation Attention: Ms. E. G. Adensam, Project Director BWR Project Directorate No. 3 Division of BWR Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Ms. Adensam:
SUBJECT:
AMENDMENTTO FACILITYOPERATING LICENSE NPF-21, WPPSS NUCLEAR PROJECT NO.2 During their regular meeting of March 20,1986, the Washington State Energy Facility Site Evaluation Council reviewed and adopted a motion indicating that the Council had no comments on the Washington Public Power Supply System's request, by letter dated January 17,1986, to amend the Operating License for Nuclear Project No. 2.
The Supply System's request involved a change to the surveillance requirements under technical 'specification 0.6.1.2.d, and an exemption from a provision of Appendix J to CFR Part 50 Section III.D, to allow for postponement of the WNP-2 drywell head "0" ring type B test until the reactor is shutdown for the first refueling outage.
That outage is now scheduled to begin on April 1, 1986, and the plant willcomplete the leak rate test during the refueling outage.
The Council was notified of the proposed amendment request by the Supply System in accordance with the notification requirements of 10 CFR 50.91.
We appreciate the opportunity to review this license amendment.
Sincerely, Sb04090039 Sb0403 PDR ADOCK 05000397 P
PDR CE:MM:ab Curtis Eschels
'hairman cc:
D.W. Mazur, WPPSS G.C. Sorensen, WPPSS J.O. =Bradfute, NRC
'p III hl