Letter Sequence Meeting |
|---|
|
|
MONTHYEARGO2-85-093, Requests Exemption from Reporting Future ESF Actuations Resulting from Chlorine Monitor Tape Depletion or Spurious Reactor Water Cleanup High Delta Flow,Per 10CFR50.73(f). Justification for Exemption Provided1985-02-20020 February 1985 Requests Exemption from Reporting Future ESF Actuations Resulting from Chlorine Monitor Tape Depletion or Spurious Reactor Water Cleanup High Delta Flow,Per 10CFR50.73(f). Justification for Exemption Provided Project stage: Other GO2-85-163, Forwards Remittance of Application Fee for 850220 LER Exemption Request,Per 850313 Request1985-03-25025 March 1985 Forwards Remittance of Application Fee for 850220 LER Exemption Request,Per 850313 Request Project stage: Other GO2-85-216, Application for Amend to License NPF-21,revising Tech Specs Re Surveillance Requirement 4.6.1.1 to Allow Certain Containment Isolation Valves to Be Excluded While Plant at Power,To Avoid Unnecessary Personnel Hazards.Fee Paid1985-04-25025 April 1985 Application for Amend to License NPF-21,revising Tech Specs Re Surveillance Requirement 4.6.1.1 to Allow Certain Containment Isolation Valves to Be Excluded While Plant at Power,To Avoid Unnecessary Personnel Hazards.Fee Paid Project stage: Request ML17277B7251985-04-25025 April 1985 Proposed Tech Specs Revising Surveillance Requirement 4.6.1.1 to Allow Certain Containment Valves to Be Excluded While Plant at Power to Avoid Unnecessary Personnel Hazard Project stage: Other ML17277B7711985-05-30030 May 1985 Proposed Tech Specs Limiting Condition for Operation to Seven of Nine Pairs of Suppression Chamber Drywell Vacuum Breakers Operable & All Nine Pairs Closed Project stage: Other GO2-85-278, Application for Amend to License NPF-21,changing Tech Spec Surveillance Requirement to Demonstrate Operability of Suppression Chamber Drywell Vacuum Breaker Pairs from Once Per 31 Days to Once Per 92 Days.Fee Paid1985-05-30030 May 1985 Application for Amend to License NPF-21,changing Tech Spec Surveillance Requirement to Demonstrate Operability of Suppression Chamber Drywell Vacuum Breaker Pairs from Once Per 31 Days to Once Per 92 Days.Fee Paid Project stage: Request ML17278A2381985-06-13013 June 1985 Proposed Tech Spec Reflecting Recent Changes in Surveillance Testing Re Use of Fuses as Overcurrent Protection Devices Project stage: Other GO2-85-312, Application for Amend to License NPF-21,changing Tech Spec 3.8.4.2 to Reflect Recent Changes in Surveillance Testing Re Use of Fuses as Overcurrent Protection Devices.Fee Paid1985-06-13013 June 1985 Application for Amend to License NPF-21,changing Tech Spec 3.8.4.2 to Reflect Recent Changes in Surveillance Testing Re Use of Fuses as Overcurrent Protection Devices.Fee Paid Project stage: Request GO2-85-321, Proposed Emergency Tech Spec Reflecting Installation of Larger Fuses in Primary Containment Penetration Conductor Overcurrent Protective Devices1985-06-18018 June 1985 Proposed Emergency Tech Spec Reflecting Installation of Larger Fuses in Primary Containment Penetration Conductor Overcurrent Protective Devices Project stage: Other ML17278A2071985-06-18018 June 1985 Application for Amend to License NPF-21,requesting Emergency Tech Specs Change to Reflect Installation of Larger Fuses in Primary Containment Penetration Conductor Overcurrent Protective Devices.Fee Paid Project stage: Request ML17278A2631985-06-25025 June 1985 Safety Evaluation Supporting Amend 14 to License NPF-21 Project stage: Approval ML17278A2611985-06-25025 June 1985 Amend 14 to License NPF-21,changing Several Fuse Sizes Listed in Tech Spec Table 3.8.4.2-1,making Table Listings Consistent W/Fuses Actually Installed for Overcurrent Protection as Result of Previous Design Changes Project stage: Other ML17278A2511985-06-27027 June 1985 Advises That State of Wa Energy Facility Site Evaluation Council Concurs W/Util 850618 Application for Amend to License NPF-21,revising Tech Spec 3.8.4.2 Re Primary Containment Penetration Conductor Overcurrent Devices Project stage: Request ML20128F2441985-07-0202 July 1985 Requests Exemption from Specified Sections of 10CFR50.72 & 50.73 Re LERs of Spurious Reactor Protection Sys Actuations. Actuations Caused by Neutron Instrumentation Electrical Noise & Not Safety Concern Project stage: Other ML20197J9681985-07-0909 July 1985 Discusses 850425 Proposed Changes to Tech Specs for Excluding Certain Containment Isolation Valves from Routine Surveillance.Changes Would Not Create Increased Possibility of Violating Primary Containment Integrity Project stage: Other ML17278A2721985-07-10010 July 1985 Informs That Motions Adopted During Wa State Energy Facility Site Evaluation Council 850708 Meeting Indicate Concurrence W/Listed Licensee Requests for Amends to License NPF-21 Project stage: Meeting AECM-85-0180, Requests 10CFR50.73 Exemption for ESF Actuations Occurring from Single Channel Trip Signals,Including Inadvertent Isolations of Reactor Water Cleanup Sys Caused by High Differential Flow Signals or Spurious High Temp Signals1985-07-16016 July 1985 Requests 10CFR50.73 Exemption for ESF Actuations Occurring from Single Channel Trip Signals,Including Inadvertent Isolations of Reactor Water Cleanup Sys Caused by High Differential Flow Signals or Spurious High Temp Signals Project stage: Other GO2-85-656, Clarifies Request for Amend to Tech Spec 3/4.6.4 Re Suppression chamber-drywell Vacuum Breakers.Analysis on Opening Time Response Completed.Tech Spec Changes Not Effected.Amend Request Should Be Processed1985-09-30030 September 1985 Clarifies Request for Amend to Tech Spec 3/4.6.4 Re Suppression chamber-drywell Vacuum Breakers.Analysis on Opening Time Response Completed.Tech Spec Changes Not Effected.Amend Request Should Be Processed Project stage: Request ML17278A4491985-10-18018 October 1985 Responds to Request for Exemption from 10CFR50.72 & 73 Reporting Requirements.Due to Vol of Requests from Other Utils,Requirements Under Reevaluation.Commission Will Address Concerns on Generic Basis Project stage: Approval ML17279A6821986-05-0202 May 1986 Safety Evaluation Supporting Amend 22 to License NPF-21 Project stage: Approval ML17279A6761986-05-0202 May 1986 Amend 22 to License NPF-21,revising Tech Spec 4.6.1.1 to Allow Certain Containment Isolation Valves to Be Excluded from Routine Surveillance Requirements While Plant at Power Project stage: Other GO2-86-945, Application for Amend to License NPF-21 Changing Tech Spec Section 3.8.4.2 to Remove Requirement to List Fuse Sizes & Test Fuses on Rotating 18-month Basis for Primary Containment Penetration Conductor Protective Devices1986-10-0707 October 1986 Application for Amend to License NPF-21 Changing Tech Spec Section 3.8.4.2 to Remove Requirement to List Fuse Sizes & Test Fuses on Rotating 18-month Basis for Primary Containment Penetration Conductor Protective Devices Project stage: Request ML17278B0661986-10-31031 October 1986 Safety Evaluation Supporting Amend 30 to License NPF-21 Project stage: Approval ML17278B0641986-10-31031 October 1986 Amend 30 to License NPF-21,revising Tech Spec Section 3/4.6.4 to Permit Plant Operation W/Two of Nine Sets of Suppression chamber-to-drywell Vacuum Breakers Inoperable Project stage: Other ML17279A6751987-02-0909 February 1987 Offers No Comments on Util 860117 Application for Amend to License NPF-21,changing Surveillance Frequency for Operability of Vacuum Breaker Pairs & Position Indicators from 31 to 92 Days Project stage: Request 1985-06-27
[Table View] |
Text
REGULAT
(
INFORMATION DISTRIBUTION YSTEM (RIDS)
SION NBR 8507160383 DOC ~ DATE 85/07/1Q NOTARIZED NO DOCKET FACIL:50".~97 NPPSS Nuclear Projects Unit 2~ Nashington Public Posse 05000397 AUTH e f(Apt' AUTHOR AFFILIATION HAHNgF ~ DE Washington'tate of REC IP ~ NAME RECIPIENT AFFILIATION BUTLERgN ~ RE Licensing Branch 2
SUBJECT:
Informs that motions adopted during State of NA State Energy Facility Site Evaluation Council 85Q708 meeting indicate.
concurrence w/listed licensee requests for amends to License NPF 21, DISTRIBUTIoN CODE+
A001D COPIES RECEIVED!LTR
~
ENCL SIZEe TITLE:
OR Submittal:
Gener al Distribution NOTES; OL:12/20/83-05000397 RECIPIENT ID CODE/NAME NRR LB2 BC 01 INTERNAL; ACRS 09 ELD/HDS2 NRR/DL DIR NRR/DL/TSRG NRR/DS I/RAB RGN5 COPIES LTTR ENCL 6
1 1
1 1
1 RECIPIENT ID CODE/NAME ADM/LFMB NRR/DE/MTEB NRR/DL/ORAB METB Qg COPIES LTTR ENCL EXTERNAL: 24X LPDR NSIC 03 05 EGS,G BRUSKEgS NRC PDR 02 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 28 ENCL
EV
>I l li V
fg I
V~,
V y
~
~
II V>f t f
>fthm
>VVVI ff+j f f tt>J
>Ifi I f via~I I
'll J P
l >l.
V'>>IV@ t P 'V>, If, tf
'Vf lt f (rj j I
K 4>v I f
>fff1> i>V>ft fV>vv l 4t>tt> /f'>g.>>'
f
>f
>I I
A,-tt>V>f>V>t ) f l IV>tgVVl t $, PfV>>I e
I II It>
H f V
g /TAN g+
O~
o~
~ N81+
- Curtis Esche3,s Chairman
~
STATE OF WASHINGTON ENERCY FACILITY SITE EVALUATION COUNCIL Mail Stop PY-11 o
Olympia, Washington 98504 o
(2%) 45M490 e
(SCAN) 5854490 3uly 10, 1985 N
Director of Nuclear Reactor Regulations Att'ention:.Mr. W. R. Butler, Chief Licensing Branch No. 2, Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Mr. Butler:
SUB3ECT:
AMENDMENTSTO FACILITYOPERATING LICENSE NPF-21, WPPSS NUCLEAR PROJECT NO. 2 During their regular meeting of 3uly 8, 1985, the Washington State Energy Facility Site Evaluation Council reviewed and subsequently adopted a series of motions indicating their concurrence with the following requests for amendments to NRC's Operating License for the Washington Public Power Supply System's Nuclear Plant No. 2.
Supply System SUB3ECT Re uest for Amendment to Technical S ecifications For:
Feb. 20, 1985 Apr. 25, 1985 May 22, 1985 May 30, 1985 June 13, 1985 Licensee Event Report Exemption Request Surveillance Requirement 0.6.1.1 (Primary Containment Integrity)
Surveillance Requirement 0.8.1.1.2, Electrical Power Systems (A. C. Sources)
Suppression Chamber-Drywell Vacuum Breakers (3/0.6.0 Vacuum Relief) 3.8.0.2, Primary Containment Penetration Conductor Overcurrent Protective Devices The Council received copies of these amendment requests from the Supply System in accordance with the notification requirements of 10 CFR 50.91.
We appreciate the opportunity to review the proposed license amendments.
8507160383 8507i0 PDR ADOCK 05000397'DR FDH:MM:ab cc:
Don Mazur, WPPSS 3erry Sorensen, WPPSS John Bradfu'te, NRC Fred D. Hahn Acting Chairman
III f'