Category:E-Mail
MONTHYEARML24290A0442024-10-15015 October 2024 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for September 2024 ML24281A1592024-10-0707 October 2024 Acceptance Review for FPL LAR - St. Lucie Unit 2 - Fuel Methodology Changes in Support of Transition to 24- Month Fuel Cycles ML24254A2562024-09-0606 September 2024 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for August 2024 ML24248A2422024-09-0404 September 2024 Acceptance Review for St. Lucie, Unit 2 - Relief Request (RR) 14: Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval ML24246A0152024-08-12012 August 2024 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for July 2024 ML24194A1222024-07-11011 July 2024 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for June 2024 ML24192A2302024-07-10010 July 2024 003 Radiation Safety Baseline Inspection Information Request ML24176A1612024-06-15015 June 2024 NRR E-mail Capture - (External_Sender) May 2024 FPL Marine Turtle Removal Monthly Report ML24150A2192024-05-29029 May 2024 (E-Mail) St. Lucie, Unit 2 - License Amendment Request, Updated Spent Fuel Pool Criticality Analysis - Acceptance Review ML24149A3532024-05-24024 May 2024 Change in Estimated Review Schedule for Nextera Common Emergency Plan Amendment ML24134A0142024-05-10010 May 2024 NRR E-mail Capture - (External_Sender) Pasl Monthly Turtle Report for April 2024 ML24122C6922024-05-0101 May 2024 NextEra Fleet EP Amendment - Demonstration Drill ML24113A0372024-04-22022 April 2024 NRR E-mail Capture - Acceptance Review - Turkey Point 3 and 4 and St. Lucie 2 - Request to Use Later Code of ASME (L-2024-LLR-0024) ML24101A2202024-04-0808 April 2024 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for March 2024 ML24074A4262024-03-12012 March 2024 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for February 2024 ML24177A2512024-02-12012 February 2024 Acceptance Review for RR 7-Proposed Alternative - Extension of Inspection Interval for St. Lucie Unit 1 Reactor Pressure Vessel Welds from 10 to 20 Years ML24036A2152024-02-0505 February 2024 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for January 2024 ML24031A5472024-01-13013 January 2024 NRR E-mail Capture - (External_Sender) December 2023 FPL Marine Turtle Removal Monthly Report ML24002A7272023-12-16016 December 2023 NRR E-mail Capture - (External_Sender) November 2023 FPL Marine Turtle Removal Monthly Report ML23332A0352023-11-27027 November 2023 Conversion to Improved Technical Specifications Change in Estimated Review Schedule ML23326A0252023-11-20020 November 2023 NRR E-mail Capture - (External_Sender) October 2023 FPL Marine Turtle Removal Monthly Report ML24008A1582023-11-14014 November 2023 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for October 2023 ML23254A2852023-09-11011 September 2023 NRR E-mail Capture - (External_Sender) August 2023 FPL Marine Turtle Removal Monthly Report ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23243A9182023-08-31031 August 2023 NRR E-mail Capture - Re Audit Plan - St. Lucie ITS Conversion LAR - Setpoints ML23228A1482023-08-16016 August 2023 NRR E-mail Capture - Acceptance Review Results - St. Lucie Nuclear Plant, Unit 2 Alternative PSL2-I5-RR-01 (L-2023-LLR-0038) ML23226A0762023-08-14014 August 2023 NRR E-mail Capture - Request for Additional Information - St. Lucie Plant, Units 1 and 2 - Adopt 10 CFR 50.69 (L-2022-LLA-0182) ML23226A0692023-08-12012 August 2023 NRR E-mail Capture - (External_Sender) July 2023 FPL Marine Turtle Removal Monthly Report ML23223A0152023-08-11011 August 2023 NRR E-mail Capture - Acceptance Review Results - St. Lucie Nuclear Plant, Unit 2 Alternative PR-10 (L-2023-LLR-0039) ML23191A1952023-07-10010 July 2023 NRR E-mail Capture - (External_Sender) June 2023 FPL Marine Turtle Removal Monthly Report ML23216A1412023-06-30030 June 2023 August 2023 RP Inspection Document Request ML23248A1292023-06-29029 June 2023 NRR E-mail Capture - St Lucie 50.69 - Additional Audit Questions ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23198A0662023-06-22022 June 2023 NRR E-mail Capture - (External_Sender) Green Turtle Nest on Canal Bank, June 2023 ML23198A0642023-06-12012 June 2023 NRR E-mail Capture - (External_Sender) Loggerhead Nest on Canal Bank, May 2023 ML23163A1732023-06-10010 June 2023 NRR E-mail Capture - (External_Sender) May 2023 FPL Marine Turtle Removal Monthly Report ML23163A1222023-05-30030 May 2023 NRR E-mail Capture - (External_Sender) Nest on Intake Canal Bank ML23138A0212023-05-17017 May 2023 Telephone Record, Call with Florida Power and Light Regarding Decommissioning Funding Plan Update Dated March 30, 2021 ML23137A0942023-05-17017 May 2023 NRR E-mail Capture - Audit Plan - St Lucie Plant, Units 1 and 2 - 10 CFR 50.69 LAR ML23135A0292023-05-12012 May 2023 NRR E-mail Capture - (External_Sender) April 2023 FPL Marine Turtle Removal Monthly Report ML23129A8312023-05-0808 May 2023 NRR E-mail Capture - Audit Plan - St. Lucie ITS Conversion LAR - Setpoints ML23109A1862023-04-19019 April 2023 and Turkey Point Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML23198A1592023-04-0707 April 2023 NRR E-mail Capture - (External_Sender) March 2023 FPL Marine Turtle Removal Monthly Report ML23074A2292023-03-15015 March 2023 NRR E-mail Capture - (External_Sender) February 2023 FPL Marine Turtle Removal Monthly Report ML23041A2262023-02-10010 February 2023 NRR E-mail Capture - (External_Sender) January 2023 FPL Marine Turtle Removal Monthly Report ML23065A1142023-02-0101 February 2023 NRR E-mail Capture - (External_Sender) FPL St. Lucie Plant Biological Opinion SERO-2019-03494 - Submittal ML23254A4022023-01-24024 January 2023 RP Inspection_2023-001_Document Request ML23019A0142023-01-18018 January 2023 NRR E-mail Capture - (External_Sender) Regarding St. Lucie Olive Ridley Capture 1/3/2023 ML23006A1822023-01-0606 January 2023 NRR E-mail Capture - (External_Sender) Psl Smalltooth Sawfish Capture 1/5/23 ML23006A1882023-01-0606 January 2023 NRR E-mail Capture - (External_Sender) December 2022 FPL Marine Turtle Removal Monthly Report 2024-09-06
[Table view] Category:Graphics incl Charts and Tables
MONTHYEARL-2024-011, and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications ML22013A3172022-01-12012 January 2022 Trp 030 - St. Lucie SLRA Breakout Questions_Fuel Oil ML22013A3162022-01-12012 January 2022 Trp 020 - St. Lucie SLRA Breakout Questions_Occw ML22013A3342022-01-11011 January 2022 TRP16 - St. Lucie SLRA Breakout Questions_Pwr Internals ML22013A3072022-01-11011 January 2022 Trp 084 St Lucie SLRA - Ssnial Scclombreakoutq ML22012A3912022-01-11011 January 2022 Scoping and Screening 2.3.3.2 & 2.3.3.4 St. Lucie SLRA - Breakout Questions ML22012A2632022-01-10010 January 2022 Trp 3 - St. Lucie Psl SLRA Breakout Question Reactor Head Closure Stud Bolting ML22010A0972022-01-0707 January 2022 Trp 038 Psl Internal Surfaces Breakout Questions - Allik ML22010A1002022-01-0707 January 2022 Trp 033 Psl Selective Leaching Breakout Questions - Allik ML21356A5772021-12-22022 December 2021 Slar Breakout Questions - Fire Protection Scoping and Screening ML22013A3032021-12-21021 December 2021 Trp 143.2 St Lucie SLRA - Breakout Questions Non-Class 1 Fatigue ML22013A3042021-12-21021 December 2021 Trp 143.3 St Lucie SLRA - Breakout Questions EAF ML22013A3022021-12-21021 December 2021 Trp 143.1 St Lucie SLRA - Breakout Questions Class 1 Fatigue ML22013A3012021-12-21021 December 2021 TRP60 St. Lucie SLRA - Breakout Questions Fatigue Monitoring ML22013A2972021-12-21021 December 2021 Trp 77 St. Lucie SLRA - Breakout Questions Corrosion Structural ML22013A2962021-12-21021 December 2021 Trp 74 St. Lucie SLRA - Breakout Questions ML22013A3052021-12-21021 December 2021 Trp 143.4 St Lucie SLRA - Breakout Questions HELB ML22013A2952021-12-21021 December 2021 Trp 47 St. Lucie SLRA - Breakout Questions ML22013A2942021-12-21021 December 2021 Trp 46 St. Lucie SLRA - Breakout Questions Structures Monitoring ML22013A2922021-12-21021 December 2021 Trp 41 St. Lucie SLRA - Breakout Questions ML22013A2882021-12-21021 December 2021 Trp 23 & 147.8 St. Lucie SLRA - Breakout Questions Cranes AMP-TLAA ML22013A2842021-12-21021 December 2021 Trp 18 St. Lucie SLRA - Breakout Questions Bolting Integrity ML22013A2822021-12-21021 December 2021 SLRA - Breakoutt Questions Corrosion OE ML21354A8372021-12-20020 December 2021 Trp 11 St. Lucie SLRA Breakout Questions ML21351A2382021-12-17017 December 2021 Trp 148.1 St. Lucie SLRA - Breakout Questions for TLAA Section 4.7.1 Rev. 1 ML21351A2412021-12-17017 December 2021 Trp 15 St. Lucie SLRA - Internal Coatings Breakout Questions - Allik ML21351A2392021-12-17017 December 2021 Trp 14 St. Lucie SLRA - Buried Pipe Breakout Questions - Allik.Docx L-2021-137, GL 2004-02 Debris Transport Calculation Non-Conservatism2021-07-23023 July 2021 GL 2004-02 Debris Transport Calculation Non-Conservatism L-2018-067, Units 1 and 2 - Submittal of Joint Plant Access Shared Information Table2018-03-19019 March 2018 Units 1 and 2 - Submittal of Joint Plant Access Shared Information Table L-2016-109, Official Service List Changes and Distribution for Safeguards Information and Official Use Only-Security-Related Information2016-05-11011 May 2016 Official Service List Changes and Distribution for Safeguards Information and Official Use Only-Security-Related Information ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML15224B4492015-09-0303 September 2015 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation ML15236A0762015-09-0303 September 2015 Enclosure, Revised St Lucie Tables-LQ-W ML15231A4122015-08-21021 August 2015 FPL St. Lucie Capture Summary 2015 ML15231A4172015-08-21021 August 2015 Power Plant Causal Turtles L-2015-093, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors 10 CFR 50.46 Annual Report2015-03-24024 March 2015 Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors 10 CFR 50.46 Annual Report L-2014-340, RAI Reply - Fourth Ten-Year Interval Unit 2 Relief Request No. 42014-11-0606 November 2014 RAI Reply - Fourth Ten-Year Interval Unit 2 Relief Request No. 4 L-2013-067, Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 20122013-02-14014 February 2013 Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 2012 ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 ML12073A1512012-03-0606 March 2012 NRR E-mail Capture - St. Lucie Discharge Headwall Project L-2010-096, Extended Power Uprate Data for NRC Confirmatory EPU Analyses2010-06-0404 June 2010 Extended Power Uprate Data for NRC Confirmatory EPU Analyses L-2009-078, Extended Power Uprate Data for NRC Confirmatory EPU Analyses2009-04-0202 April 2009 Extended Power Uprate Data for NRC Confirmatory EPU Analyses L-2008-236, Extended Power Uprate, Data for NRC Confirmatory EPU Analyses2008-10-29029 October 2008 Extended Power Uprate, Data for NRC Confirmatory EPU Analyses L-2008-178, Fourth Ten-Year Interval In-Service-Test Program Submittal RAI Reply to Relief Request PR-042008-08-0505 August 2008 Fourth Ten-Year Interval In-Service-Test Program Submittal RAI Reply to Relief Request PR-04 ML0808506472008-03-19019 March 2008 NDE Report on PSL-1 Pressurizer Nozzles ML0810502642008-03-19019 March 2008 NDE Report, on PSL-1 Pressurizer Nozzles, Attachment 2 L-2008-018, Transmittal of Pressurized Butt Weld Alloy Report, and Mitigation Status and Swol Inspection Results2008-02-21021 February 2008 Transmittal of Pressurized Butt Weld Alloy Report, and Mitigation Status and Swol Inspection Results L-2008-002, Corporate Merger of Decommissioning Trustee2008-01-0303 January 2008 Corporate Merger of Decommissioning Trustee ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists ML0526603212005-09-21021 September 2005 Tech Spec Pages for Amendment No. 196, Extension of the Reactor Coolant System Pressure/Temperature Curve Limits 2024-03-13
[Table view] Category:Letter
MONTHYEARIR 05000335/20250102024-10-21021 October 2024 Notification of St. Lucie Plant Units 1 & 2 Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000335/2025010 and 05000389/2025010 ML24227A9702024-10-18018 October 2024 Letter to Kenneth Mack Dir, License and Reg Compliance, NextEra Energy, Inc Response to Request Re Engagement Re Sub License Renewal Environmental Review - St Lucie Nuclear Plant 1 and 2 L-2024-085, Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results2024-10-15015 October 2024 Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results L-2024-165, Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made2024-10-14014 October 2024 Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) ML24255A3092024-09-30030 September 2024 SLRA - Revised SE Letter L-2024-155, Subsequent License Renewal Application, Third Annual Update2024-09-27027 September 2024 Subsequent License Renewal Application, Third Annual Update L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes 05000335/LER-2024-001, Unplanned Reactor Scram2024-09-25025 September 2024 Unplanned Reactor Scram IR 05000335/20240112024-09-18018 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000335/2024011 and 05000389/2024011 L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 552024-09-0909 September 2024 Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55 IR 05000335/20240052024-08-22022 August 2024 Updated Inspection Plan for St. Lucie, Units 1 & 2 - Report 05000335/2024005 and 05000389/2024005 L-2024-140, Cycle 28 Core Operating Limits Report2024-08-14014 August 2024 Cycle 28 Core Operating Limits Report L-2024-133, Snubber Program Plan Submittal2024-08-14014 August 2024 Snubber Program Plan Submittal L-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis IR 05000335/20240022024-08-13013 August 2024 Integrated Inspection Report 05000335-2024002 and 05000389-2024002 L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval 05000389/LER-2024-003, Unplanned Reactor Scram2024-08-0505 August 2024 Unplanned Reactor Scram ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan 05000389/LER-2024-002-01, Safety Injection Tank Vent Through Wall Leakage2024-07-11011 July 2024 Safety Injection Tank Vent Through Wall Leakage L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review ML24172A1562024-06-27027 June 2024 Relief Request - PSL2-I5-RR-01 Proposed Alternative to Amse Code XI Code Examination Requirements - System Leakage Test of Reactor Pressure Vessel Bottom Head and Class 1 and 2 Piping in Covered Trenches L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports IR 05000335/20244012024-06-0303 June 2024 Security Baseline Inspection Report 05000335/2024401 and 05000389/2024401 ML24135A0642024-05-17017 May 2024 Correction Letter - Amendment Nos. 253 and 208 Regarding Conversion to Improved Standard Technical Specifications L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation IR 05000335/20240012024-05-10010 May 2024 Integrated Inspection Report 05000335/2024001 and 05000389/2024001 ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report ML24108A0632024-04-18018 April 2024 – Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection L-2024-056, Annual Radiological Environmental Operating Report for Calendar Year 20232024-04-17017 April 2024 Annual Radiological Environmental Operating Report for Calendar Year 2023 L-2024-064, Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report2024-04-17017 April 2024 Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report L-2024-054, 2023 Annual Environmental Operating Report2024-04-0909 April 2024 2023 Annual Environmental Operating Report ML24093A2612024-04-0202 April 2024 – Investigation Summary, Office of Investigations Case Number 2-2023-005 L-2024-047, Proposed Use of a Subsequent ASME Code Edition and Addenda2024-03-28028 March 2024 Proposed Use of a Subsequent ASME Code Edition and Addenda 2024-09-09
[Table view] Category:Map
MONTHYEARML21286A6222021-10-27027 October 2021 Achp - Request for Scoping Comments Concerning the Environmental Review of St. Lucie Plant, Units 1 and 2 Subsequent License Renewal Application ML21287A1132021-10-22022 October 2021 Shpo - Request for Scoping Comments Concerning the Environmental Review of St. Lucie Plant, Units 1 and 2 Subsequent License Renewal Application L-2021-073, Environmental Protection Plan Report Request to Renew Industrial Wastewater Facility Permit2021-04-16016 April 2021 Environmental Protection Plan Report Request to Renew Industrial Wastewater Facility Permit ML13360A2022013-12-12012 December 2013 EPA Echo Report Martin County, Fl ML12073A1512012-03-0606 March 2012 NRR E-mail Capture - St. Lucie Discharge Headwall Project ML18127B1491976-10-11011 October 1976 Response to Letter of 8/10/1976, Submits Answers to Beach Survey ML18127B1541976-09-29029 September 1976 Enclosed Is Final Design Drawing of Erosion Protection of Discharge Canal Peninsular Which Is Submitted for Review in Accordance with Letter of 6/22/1976 ML18127B6881975-05-0909 May 1975 Figure Q2.27-4 Topography South of Site. 2021-04-16
[Table view] |
Text
1 NRR-PMDA-ECapture Resource From: Gless, Jodie [Jodie.Gless@fpl.com]
Sent: Tuesday, March 06, 2012 2:40 PM To: Logan, Dennis Cc: Foster, Stacy; Hollowell, Ed; Frehafer, Ken; Cocotos, Peter; Orr, Franklin; MORGAN, Gary
Subject:
St. Lucie Discharge Headwall Project Attachments:
10 year nesting totals O_N.xlsx; 2004 to 2011 M onthly Nesting Data.xlsx; Seawall Boundary Figure.pdf; FDEP CCCL Seawall Permit 12-6-11 exp 2014.pdf; PSL Discharge Headwall Project.doc; Nesting segments.pdf Hi Dennis, FPL put together a narrative explaining the need, purpose and description of the project, as well as the proposed conditions for work and the species considered. In the narrative, nesting numbers, a figure and a map are referenced. They are all attached to this email. I have also attached the FDEP CCCL permit.
Jeff Howe, from the Fish and Wildlife Service, has been involved in the project. He is aware that we are sending you the attached information. His contact information is 772-562-3909 X 283 and Jeffrey_Howe@fws.gov. Please contact me if you need any additional information.
Thank you,
Jodie Jodie Gless
Florida Power & Light Company Environmental Services 561-691-2801 office 561-358-0374 cell
Jodie.Gless@fpl.com
Table 1. The total number of sea turtle nests observed and the number marked for productivity analysisin each of the 1km zones "N" and "O" delineated by species for the past ten years.
N O N O N O N O N O N O1.2002220239 3 514 6 4 0 7 2 2 02.2003152202 210 2 7 0 312 8 1 13.2004162167 4 4 8 7 0 0 8 6 2 04.2005206204 4 51314 1 2 8 3 1 05.200692142 2 4 4 5 0 0 6 3 6 26.200714486 2 112 7 0 1 7 4 0 07.2008152172 2 6 711 0 3 7 4 0 08.2009129164 3 110 8 3 11213 1 39.201023316810 3 917 2 4 6 2 0 010.2011242301 7 82642 2 5 7 5 4 0 Cc CmDcTotal Nests ObsNests MarkedTotal Nests ObsNests MarkedTotal Nests ObsNests Marked MarchAprilMayJuneJulyAugustSeptemberZone O N O N O N O N O N O N O NAverage nests per year for each month2004 Cc 0 0 0 03120516550653212 0 0ZoneMarch Cm 0 0 0 0 0 0 0 2 4 3 3 2 0 1 O0.125 Dc 0 0 1 2 3 2 2 4 0 0 0 0 0 0 N0.3752005 Cc 0 0 0 02730759383621821 0 0April Cm 0 0 0 0 0 0 1 1 810 5 2 0 0 O1.5 Dc 0 0 1 1 1 3 1 4 0 0 0 0 0 0 N1.8752006 Cc 0 0 0 034194438502914 6 0 0May Cm 0 0 0 0 0 0 1 1 1 1 3 2 0 0 O26.75 Dc 0 0 0 2 1 3 2 1 0 0 0 0 0 0 N23.3752007 Cc 0 0 0 01217306029461419 1 0June Cm 0 0 0 0 0 0 0 1 3 3 4 7 0 1 O73 Dc 0 2 2 1 1 2 1 2 0 0 0 0 0 0 N78.1252008 Cc 0 0 0 02419806552481619 0 0July Cm 0 0 0 0 0 0 3 2 5 5 2 0 1 0 O66.25 Dc 0 0 1 2 2 4 1 1 0 0 0 0 0 0 N61.8752009 Cc 0 0 0 0 915795558451713 1 0August Cm 0 0 0 0 0 0 1 1 1 3 2 5 4 1 O25 Dc 0 1 3 3 5 4 5 3 0 1 0 0 0 0 N21.8752010 Cc 0 0 0 011195910370802830 0 1September Cm 0 0 0 0 0 0 2 0 7 4 6 4 2 1 O1.25 Dc 0 0 1 1 1 1 0 3 0 1 0 0 0 0 N0.752011 Cc 0 0 1 0502813410990792626 0 0 Cm 0 0 0 0 1 012 918 910 7 1 1 Dc 1 0 2 3 1 1 0 2 1 1 0 0 0 0TOTAL NEST=
1 3121521418758462553049520017510 6
St. Lucie Discharge Headwall Project Need for the Project A series of storms and hurricanes
- Frances (2004), Jeanne (2004) and Wilma (2005)
- have caused dune and beach erosion seaward of the discharge canal of the Florida Power and Light Company (FPL) St. Lucie Nuclear Plant on Hutchinson Island in St. Lucie County.
The damage eroded a critical area in front of the discharge canal.
To protect the canal, FPL subsequently constructed several dune restoration projects, but storms have repeatedly eroded these repair attempts.
Purpose of the Project FPL proposes to protect the open coast shoreline fronting the discharge canal and northern headwall through construction of a sheet pile seawall.
The seawall will provide an immediate protective barrier against an encroaching shoreline.
In order for the work to be completed prior to the next hurricane season, work needs to be conducted during sea turtle nesting season.
Since work will be conducted on the beach, which is known sea turtle nesting habitat for leatherback, loggerhead and green sea turtles, Jeff Howe from the Fish and Wildlife Service has indicated that the project may affect and is likely to adversely affect sea turtle nesting.
An incidental take statement will be required to perform nesting relocations for construction purposes in the area of the sheet pile installation.
Description of Project A sand dune was placed seaward of the proposed seawall prior to the start of turtle nesting season (March 1). The sand restored the dune profile, which is approximately 45 feet from top to toe, and provides a stable work area for the construction of the seawall, immediately adjacent to the access road. The proposed seawall location will provide a rigid coastal structure to provide hurricane protection for FPL's St. Lucie Nuclear Plant discharge canal.
After March 1 st, an approximately 7 to 10 foot area directly adjacent to the seaward side of the wall will be required for construction of the seawall. This area is required to support the following equipment and work activities.
- 1. A small drill rig and associated support (wood cribbing) used to drill in the tieback rods for the seawall may encroach, or extend into this area.
- 2. The sheet pile installer, which rides on top of the installed sheets will extend over this area directly adjacent to the seaward side of the wall but will not be putting pressure on the sand in this area. The initial sheet installation that requires the equipment to be supported on the ground will be started on the wing walls that are west of the rigid coastal structure, i.e. the north south portion of the proposed seawall. This equipment does not use vibration or a hammer to install the sheet pile.
Reference http://www.giken.com/en/press
-in/principle/
for information on the sheet pile installation process. As an additional precaution, FPL has employed an independent engineering company, Dunkelberger Engineering, to perform vibration monitoring during the installation proce ss.
- 3. Some minor excavation, less than 4
-5 feet in depth along the length of the wall will be required for form work and installation of the concrete tie beam at the top of the sea wall.
- 4. All other work in this 7
-10 ft area directly adjacent to the seaward side of the wall will be construction foot traffic and hand tools, associated with installation of the tieback rods, and construction of the concrete tie beams.
Other than the work described above, the construction of the seawall will be able to be supported from the west side of the rigid coastal structure, i.e. the north south portion of the proposed seawall.
To provide a safe work area for people that may be walking on the beach and to provide a visible boundary of the work area for the contractor, FP L may install a fence approximately 10 ft east of the proposed location of the seawall. See attached "Seawall Boundary Figure" for location of proposed fence, identified as turtle barrier on the sketch.
The seawall sheet pile and anchor installation is scheduled to be completed prior to May 1 st, with the remainder of the work, i.e.
- concrete cap, anchor tensioning, and sheet pile bracing, scheduled to be complete by the middle of June.
Proposed conditions for work
- As of March 1 and not later than April 30, FPL may conduct work on the beach under the following conditions:
o Work activities may occur no farther than 10 ft seaward of the coastal structure.
o No open trenches shall be left unattended.
Any trenches open at the end of the workday shall be filled in to grade. o The work area will be surveyed in accordance with the sea turtle protection plan prepared for St. Lucie County Development Review Board and provided as part of the permit application package. Night time turtle monitoring will be performed as requested by Florida Fish and Wildlife Conservation Commission.
o All nests within the ongoing construction survey area (600 feet) shall be marked with a protective barrier.
o If a nest occurs in zones O or N, specific marking requirements will be determined on a case-by-case basis through consultation with FWC/FWS.
o No nest may be relocated to accommodate construction activity unless an incidental take statement to relocate nest is obtained from FWS. If an incidental take statement is obtained, FPL will coordinate with FWC and FWS prior to nest relocation.
o FWC and FWS shall be contacted if a sea turtle emergence occurs in the project area during the construction period, including final dune planting activities.
o If FPL chooses to construct a fence to limit public access to the work area The fence will include posts imbedded in the sand (including no concrete or other similar post support material) spaced approximately 8 to 10 ft apart. The fence material will comprise orange plastic fencing or chain link fencing.
At sundown the fencing bottom elevation must occur no less than three feet above the surface of the beach/dune. The fence should be removed, rolled up, or otherwise modified to ensure night access to nesting sea turtles.
As of May 1, no work will occur seaward of the seawall except as described below. Work may continue without restriction landward of the seawall.
o As of May 1 and no later than May 30, excavation may occur up to 2 feet seaward of the installed sheetpile to allow for construction of the seawall cap. All excavation shall be done by hand, and all pits/trenches shall be filled to grade by hand no later than sunset each day. o FPL shall instruct the contractor to finish the more seaward sections of cap (those sections of the seawall cap parallel to the shoreline) first, then complete cap work on the wing walls extending landward. All excavation work for cap construction shall be completed by May 30.
o After May 30 only dune planting may occur seaward of the wall.
o The work area will be surveyed in accordance with the sea turtle protection plan prepared for St. Lucie County Development Review Board and provided as part of the permit application package. Night time turtle monitoring will be performed as requested by Florida Fish and Wildlife Conservation Commission.
o All nests within the ongoing construction survey area (600 feet) shall be marked with a protective barrier.
o If a nest occurs in zones O or N, specific marking requirements will be determined on a case-by-case basis through consultation with FWC/FWS.
o No nest may be relocated to accommodate construction activity unless an incidental take statement to relocate nest is obtained from FWS. If an incidental take statement is obtained, FPL will coordinate with FWC and FWS prior to nest relocation.
FWC and FWS shall be contacted if a sea turtle emergence occurs in the project area during the construction period, including final dune planting activities.
FPL will send FWC and FDEP permit compliance manager for the project a weekly email updating progress on the project.
Turtle survey will continue through the entire nesting season.
Species Considered
As stated earlier, the project area is known nesting habitat for leatherback, loggerhead and green sea turtles. The beach is separated into 1km segments for monitoring purposes. Since the border between N and O is directly in front of the discharge canal, the proposed project is located in both of the segments (see attached map).
Spreadsheets have been provided with nesting data for all three species in the 1km beach segments N and O. However, it is worth noting that the construction will only take place on 400 ft (North to South) of the beach
. If a sea turtle was to nest in a location within the project area where it could be disturbed, a relocation of the eggs to another area would be recommended.
- 0#0R-81R-81PROJECTBOUNDARIESST.LUCIENUCLEARPOWERPLANDISCHARGECANALHEADWALLSTABILIZATIONPROJECTST.LUCIECOUNTY,FLTAYLORENGINEERINGINC.10151DEERWOODPARKBLVDBLDG300SUITE300JACKSONVILLE,FL32256C2009-088 RCFEB2012DRAWNBYDATEDISCHARGECANALPERIMETERROADATLANTICOCEANPROJECT ELEGEND#0FDEPR-MONUMENTSWORKLIMITSDUNEPRESERVATIONZONEPERIMETERROADSILTFENCEPROPOSEDSEAWALLTURTLEBARRIER(10'seawardofseawall)PROPOSEDDUNEFILL60060120Feet PROJECT BOUNDARIES:
ST. LUCIE NUCLEAR POWER PLANT DISCHARGE CANAL HEADWALL STABILIZATION PROJECT ST. LUCIE COUNTY, FL