IR 05000335/2024005

From kanterella
Jump to navigation Jump to search
Updated Inspection Plan for St. Lucie, Units 1 & 2 - Report 05000335/2024005 and 05000389/2024005
ML24235A152
Person / Time
Site: Saint Lucie  
Issue date: 08/22/2024
From: Renee Taylor
NRC/RGN-II/DRP/RPB3
To: Coffey B
Florida Power & Light Co
References
IR 2024005
Download: ML24235A152 (1)


Text

SUBJECT:

UPDATED INSPECTION PLAN FOR ST LUCIE UNITS 1 & 2 - REPORT 05000335/2024005 AND 05000389/2024005

Dear Bob Coffey:

The enclosed inspection plan lists the inspections scheduled through June 30, 2026, for St Lucie Units 1 & 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4630 with any questions you have regarding this letter.

Sincerely, Ryan Taylor, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos. 05000335, 05000389, and 07200061 License No. DPR-67 and NPF-16 Enclosure:

St Lucie Inspection/Activity Plan cc w/ encl: Distribution via LISTSERV August 22, 2024 Childs, Natasha signing on behalf of Taylor, Ryan on 08/22/24

ML24235A152 X

SUNSI Review X

Non-Sensitive

Sensitive X

Publicly Available

Non-Publicly Available OFFICE RII: DRP RII: DRP NAME J. Quinones R. Taylor/N. Childs DATE 8/22/24 8/22/24

Enclosure 07200061 - Saint Lucie (ISFSI)

09/01/2024 - 06/30/2026 Unit Start End Activity CAC Title Staff Count PREOPERATIONAL TESTING OF AN ISFSI

12/9/2024 12/13/2024 IP 60854 001000 Preoperational Testing Of An ISFSI 2/10/2025 2/14/2025 IP 60856 001003 Review of 10 CFR 72.212(b) Evaluations 2/24/2025 2/28/2025 IP 60854 001000 Preoperational Testing Of An ISFSI 3/17/2025 3/21/2025 IP 60854 001000 Preoperational Testing Of An ISFSI 3/17/2025 3/21/2025 IP 60856 001003 Review of 10 CFR 72.212(b) Evaluations OPERATION OF AN ISFSI

3/24/2025 3/28/2025 IP 60855 001001 Operation Of An ISFSI OPERATION OF AN ISFSI

5/4/2026 5/8/2026 IP 60855 001001 Operation Of An ISFSI

Site Inspection Activity Plan Prepared on 8/20/2024 10:49:11 AM 4 of 6 Saint Lucie 09/01/2024 - 06/30/2026 Unit Start End Activity CAC Title Staff Count UNIT 2 IN-SERVICE INSPECTION +SG

2 9/9/2024 9/13/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP OCCUPATIONAL RAD SAFETY AND TRANSPORTATION BASELINE INSPECTION

1,2 9/9/2024 9/13/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 9/9/2024 9/13/2024 IP 71151 000746 Performance Indicator Verification ST LUCIE INITIAL LICENSE EXAM

1,2 10/13/2024 10/18/2024 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)

1,2 12/2/2024 12/13/2024 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

FOCUSED ENGINEERING INSPECTION (AGE-RELATED)

1,2 11/18/2024 11/22/2024 IP 71111.21N.04 001832 Age-Related Degradation 1,2 12/2/2024 12/6/2024 IP 71111.21N.04 001832 Age-Related Degradation MATERIAL CONTROL AND ACCOUNTING

1,2 12/9/2024 12/11/2024 IP 71130.11 000742 Material Control and Accounting (MC&A)

EMERGENCY PREPAREDNESS PROGRAM INSPECTION

1,2 1/13/2025 1/17/2025 IP 71114.02 000717 Alert and Notification System Testing 1,2 1/13/2025 1/17/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1,2 1/13/2025 1/17/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 1/13/2025 1/17/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness 1,2 1/13/2025 1/17/2025 IP 71151 001397 Performance Indicator Verification PREOPERATIONAL TESTING OF AN ISFSI

1,2 12/9/2024 12/13/2024 IP 60854 001000 Preoperational Testing Of An ISFSI 1,2 2/10/2025 2/14/2025 IP 60856 001003 Review of 10 CFR 72.212(b) Evaluations 1,2 2/24/2025 2/28/2025 IP 60854 001000 Preoperational Testing Of An ISFSI 1,2 3/17/2025 3/21/2025 IP 60854 001000 Preoperational Testing Of An ISFSI 1,2 3/17/2025 3/21/2025 IP 60856 001003 Review of 10 CFR 72.212(b) Evaluations CYBER SECURITY INSPECTION

1,2 3/17/2025 3/21/2025 IP 71130.10 000741 Cybersecurity

Site Inspection Activity Plan Prepared on 8/20/2024 10:49:11 AM 5 of 6 OPERATION OF AN ISFSI

1,2 3/24/2025 3/28/2025 IP 60855 001001 Operation Of An ISFSI COMPREHENSIVE ENGINEERING TEAM INSPECTION (CETI)

1,2 3/24/2025 3/28/2025 IP 71111.21M 000713 Comprehensive Engineering Team Inspection 1,2 4/7/2025 4/11/2025 IP 71111.21M 000713 Comprehensive Engineering Team Inspection SECURITY BASELINE INSPECTION

1,2 4/21/2025 4/24/2025 IP 71130.02 000734 Access Control 1,2 4/21/2025 4/24/2025 IP 71130.05 000737 Protective Strategy Evaluation 1,2 4/21/2025 4/24/2025 IP 71130.09 001656 Security Plan Changes 1,2 4/21/2025 4/24/2025 IP 71151 001338 Performance Indicator Verification SECURITY BASELINE INSPECTION

1,2 7/21/2025 7/24/2025 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1,2 7/21/2025 7/24/2025 IP 71130.07 000739 Security Training UNIT 1 IN-SERVICE INSPECTION +SG

1 9/29/2025 10/10/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION

1,2 9/29/2025 10/3/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 9/29/2025 10/3/2025 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1,2 9/29/2025 10/3/2025 IP 71124.04 000728 Occupational Dose Assessment 1,2 9/29/2025 10/3/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation 1,2 9/29/2025 10/3/2025 IP 71151 000746 Performance Indicator Verification 1,2 10/20/2025 10/24/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 10/20/2025 10/24/2025 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1,2 10/20/2025 10/24/2025 IP 71124.04 000728 Occupational Dose Assessment 1,2 10/20/2025 10/24/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation 1,2 10/20/2025 10/24/2025 IP 71151 000746 Performance Indicator Verification SAINT LUCIE REQUAL

1,2 11/16/2025 11/22/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance ST LUCIE INITIAL EXAM

1,2 10/26/2025 11/1/2025 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)

Site Inspection Activity Plan Prepared on 8/20/2024 10:49:11 AM 6 of 6 1,2 11/30/2025 12/13/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

EMERGENCY PREPAREDNESS EXERCISE INSPECTION

1,2 2/9/2026 2/13/2026 IP 71114.01 000716 Exercise Evaluation 1,2 2/9/2026 2/13/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 2/9/2026 2/13/2026 IP 71151 001397 Performance Indicator Verification FOCUSED ENGINEERING INSPECTION (FPTI)

1,2 2/2/2026 2/6/2026 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

1,2 2/23/2026 2/27/2026 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION

1,2 4/6/2026 4/10/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 4/6/2026 4/10/2026 IP 71151 000746 Performance Indicator Verification UNIT 2 IN-SERVICE INSPECTION +SG

2 4/13/2026 4/24/2026 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

OPERATION OF AN ISFSI

1,2 5/4/2026 5/8/2026 IP 60855 001001 Operation Of An ISFSI SECURITY BASELINE INSPECTION

1,2 5/18/2026 5/21/2026 IP 71130.02 000734 Access Control 1,2 5/18/2026 5/21/2026 IP 71130.09 001656 Security Plan Changes 1,2 5/18/2026 5/21/2026 IP 71130.14 000743 Review of Power Reactor Target Sets 1,2 5/18/2026 5/21/2026 IP 71151 001338 Performance Indicator Verification