ML24113A037
| ML24113A037 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point, Saint Lucie |
| Issue date: | 04/22/2024 |
| From: | Michael Mahoney NRC/NRR/DORL/LPL2-2 |
| To: | Mack J Florida Power & Light Co |
| References | |
| L-2024-LLR-0024 | |
| Download: ML24113A037 (3) | |
Text
From:
Michael Mahoney Sent:
Monday, April 22, 2024 7:40 AM To:
Mack, Jarrett Cc:
Mack, Kenneth
Subject:
Acceptance Review - Turkey Point 3 and 4 and St. Lucie 2 - Request to use Later Code of ASME (L-2024-LLR-0024)
Hi Jarrett, By letter L-2024-047, dated March 28, 2024 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML24088A207), Florida Power and Light Company (FPL, the licensee) submitted a request to use a subsequent Association of Mechanical Engineers (ASME) Code and Edition for the Turkey Point Nuclear Generating Unit Nos. 3 and 4 (Turkey Point 3 and 4) and the St. Lucie Nuclear Plant, Unit 2 (St. Lucie 2).
Specifically, FPL requests authorization to adopt the 2019 Edition of the ASME Boiler and Pressure Vessel Code,Section XI (ASME BPV Code,Section XI), for the St. Lucie Unit 2 Fifth 10-Year lnservice Inspection (ISI) Interval and the Turkey Point Unit 3 and Unit 4 (Turkey Point)
Sixth 10-Year ISI Intervals.
Pursuant to Section 50.55a, Codes and standards, paragraph (g)(4)(iv), Applicable [Inservice Inspection] ISI Code: Use of subsequent Code editions and addenda, of Title 10 of the Code of Federal Regulations (10 CFR) states: Inservice examination of components and system pressure tests may meet the requirements set forth in subsequent editions and addenda that are incorporated by reference in paragraph (a) of this section, subject to the conditions listed in paragraph (b) of this section, and subject to Commission approval. Portions of editions or addenda may be used, provided that all related requirements of the respective editions or addenda are met.
The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br /> to complete. The NRC staff expects to complete this review in approximately 3 months, which is July 31, 2024. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted
completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staffs initial review of the application, and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities.
If you have any questions, please contact me.
Thanks Mike Mahoney Project Manager, LPL2-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Desk: (301)-415-3867 Mobile: (301)-250-0450 Email: Michael.Mahoney@nrc.gov
Hearing Identifier:
NRR_DRMA Email Number:
2478 Mail Envelope Properties (SA1PR09MB948693622CED4D603D989417E5122)
Subject:
Acceptance Review - Turkey Point 3 and 4 and St. Lucie 2 - Request to use Later Code of ASME (L-2024-LLR-0024)
Sent Date:
4/22/2024 7:40:00 AM Received Date:
4/22/2024 7:40:05 AM From:
Michael Mahoney Created By:
Michael.Mahoney@nrc.gov Recipients:
"Mack, Kenneth" <Kenneth.Mack2@fpl.com>
Tracking Status: None "Mack, Jarrett" <Jarrett.Mack@fpl.com>
Tracking Status: None Post Office:
SA1PR09MB9486.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3875 4/22/2024 7:40:05 AM Options Priority:
Normal Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date: