MONTHYEARL-2024-184, Radiological Emergency Plan Revision 772024-11-0505 November 2024 Radiological Emergency Plan Revision 77 L-2024-173, Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-31031 October 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-175, Cycle 34 Core Operating Report2024-10-24024 October 2024 Cycle 34 Core Operating Report L-2024-177, Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-10-22022 October 2024 Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes L-2024-085, Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results2024-10-15015 October 2024 Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results L-2024-165, Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made2024-10-14014 October 2024 Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports L-2024-155, Subsequent License Renewal Application, Third Annual Update2024-09-27027 September 2024 Subsequent License Renewal Application, Third Annual Update L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 552024-09-0909 September 2024 Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55 L-2024-140, Cycle 28 Core Operating Limits Report2024-08-14014 August 2024 Cycle 28 Core Operating Limits Report L-2024-133, Snubber Program Plan Submittal2024-08-14014 August 2024 Snubber Program Plan Submittal L-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report L-2024-073, Cycle 34 Core Operating Limits Report2024-05-0101 May 2024 Cycle 34 Core Operating Limits Report L-2024-072, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report L-2024-069, Radiological Emergency Plan Revision 762024-04-22022 April 2024 Radiological Emergency Plan Revision 76 L-2024-066, Sixth 10-Year Inservice Testing Interval Relief Request No. PR-022024-04-17017 April 2024 Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02 L-2024-056, Annual Radiological Environmental Operating Report for Calendar Year 20232024-04-17017 April 2024 Annual Radiological Environmental Operating Report for Calendar Year 2023 L-2024-064, Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report2024-04-17017 April 2024 Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report L-2024-054, 2023 Annual Environmental Operating Report2024-04-0909 April 2024 2023 Annual Environmental Operating Report L-2024-047, Proposed Use of a Subsequent ASME Code Edition and Addenda2024-03-28028 March 2024 Proposed Use of a Subsequent ASME Code Edition and Addenda 2024-09-09
[Table view] |
Text
March 28, 2024 L-2024-047 10 CFR 50.55a
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington DC 20555-0001
RE: St. Lucie Nuclear Plant, Unit 2 Docket No. 50-389 Renewed Facility Operating License NPF-16
Turkey Point Nuclear Plant, Un it 3 and 4 Docket Nos. 50-250 and 50-251 Subsequent Renewed Facility Operating Licenses DPR-31 and DPR-41
Proposed Use of a Subsequent ASME Code Edition and Addenda
Pursuant to 10 CFR 50.55a(g)(4)(iv), Florida Power & Light Company (FPL) hereby requests authorization to adopt the 2019 Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI (ASME BPV Code,Section XI), for the St. Lucie Unit 2 Fifth 10-Year lnservice Inspection (ISi) Interval and the Turkey Point Unit 3 and Unit 4 (Turkey Point) Sixth 10-Year ISi Intervals. The proposed change would implement a later edition of the ASME BPV Code,Section XI, than the Code of Record for St. Lucie Unit 2 and Turkey Point in accordance with 10 CFR 50.55a(g)(4)(ii). The 2019 Edition of the ASME BPV Code,Section XI, was incorporated by reference in 10 CFR 50.55a(a)(1 )(ii)(C) for licensee ISi programs, as published in Federal Register 87 FR 6512. Implementation of the 2019 Edition of the ASME BPV Code,Section XI, serves to enhance overall quality and safety at FPL's nuclear facilities by establishing to the extent practical, a unified set of inservice inspection requirements.
The enclosure to this letter provides details of the proposed change. Approval is requested by July 31,
2024, to support St. Lucie Unit 2 and Turkey Point Unit 3 scheduled refueling outages in Fall 2024.
This letter contains no new or mod ified regulatory commitments.
Should you have any questions rega rding this submission, please contact Mr. Kenneth Mack, Fleet Licensing Manager, at 561-904-3635.
Steve tron Licensing & Regulatory Compliance Director - Nuclear Fleet Florida Power & Light Company
cc : USNRC Regional Administrator, Region II USNRC Project Manager, St. Lucie Nuclear Plant, Units 1 and 2 USNRC Senior Resident Inspector, St. Lucie Nuclear Plant, Units 1 and 2 USN RC Project Manager, Turkey Point Nuclear Generating Station USN RC Senior Resident Inspector, Turkey Point Nuclear Generating Station Mr. Clark Eldredge, Florida Department of Health
Enclosure :
Florida Power & Light Company
700 Universe Boulevard, Juno Beach, FL 33408 St. Lucie Nuclear Plant, Unit 2, Docket No. 50-389 L-2024-047 Turkey Point Nuclear Plant, Docket Nos. 50-250 and 50-251 Enclosure Page 1 of 2
Proposed Use of Subsequent ASME Code Edition and Addenda In Accordance with 10 CFR 50.55a(g)(4)(iv)
In accordance with 10 CFR 50.55a, "Codes and standards," paragraph (g)(4)(iv) and the guidance provided in Reference 2, Florida Power and Light Company (FPL) requests NRC approval to use provisions of a later edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI (ASME BPV Code,Section XI), for St. Lucie Plant Unit No. 2 (St. Lucie Unit 2), Turkey Point Nuclear Generating Unit No. 3 (Turkey Point Unit 3) and Turkey Point Nuclear Generating Unit No. 4 (Turkey Point Unit 4). Specifically, FPL requests approval to use the 2019 Edition of ASME BPV Code,Section XI, for the St. Lucie Unit 2 Fifth 10-Year Interval lnservice Inspection (ISi) Program and the Turkey Point Unit 3 and Turkey Point Unit 4 Sixth 10-Year Interval ISi Programs.
- 1. ASME Code Component(s) Affected:
All Class 1, 2 and 3 components, supports, and items within the ASME Section XI boundaries.
- 2. Requested Date for Approval:
Approval requested by July 31, 2024.
- 3. Applicable Code Edition and Addenda:
3.1 The ISi Program for the St. Lucie Unit 2, Fourth 10-Year ISi Interval was based on the 2007 Edition of ASME BPV Code,Section XI, with the 2008 Addenda. The Fourth 10-Year ISi Interval began August 8, 2013, and ended August 7, 2023.
Note that the applicable Code of Record for the St. Lucie Unit 2 ISi Program in accordance with 10 CFR 50.55a(g)(4)(ii), Applicable ISi Code: Successive 120-month Intervals, would be the 2017 Edition of ASME BPV Code,Section XI, based on the Fifth 10-Year ISi Interval for St.
Lucie Unit 2 beginning on August 8, 2023.
3.2 The ISi Program for Turkey Point Unit 3, Fifth 10-Year ISi Program was based on the 2007 Edition of ASME BPV Code,Section XI, with the 2008 Addenda. The Fifth 10-Year ISi Interval began on February 22, 2014, and ends on February 21, 2024.
Note that the applicable Code of Record for the Turkey Point Unit 3 ISi Program in accordance with 10 CFR 50.55a(g)(4)(ii) would be the 2017 Edition of ASME BPV Code,Section XI, based on the Sixth ISi 10-Year Interval for Turkey Point Unit 3 beginning on February 22, 2024.
3.3 The ISi Program for Turkey Point Unit 4, Fifth 10-Year ISi Program was based on the 2007 Edition of ASME BPV Code,Section XI, with the 2008 Addenda. The Fifth 10-Year ISi Interval began on April 15, 2014, and ends on April 14, 2024.
Note that the applicable Code of Record for the Turkey Point Unit 4 ISi Program in accordance with 1 O CFR 50.55a(g)(4)(ii) would be the 2017 Edition of ASME BPV Code,Section XI, based on the Sixth ISi 10-Year Interval for Turkey Point Unit 4 beginning on April 15, 2024.
- 4. Proposed Subsequent Code Edition and Addenda:
Pursuant to 10 CFR 50.55a(g)(4)(iv), FPL requests approval to utilize the 2019 Edition of ASME BPV Code,Section XI, for the St. Lucie Unit2 Fifth 10-Year Interval ISi Program and the Turkey Point Unit 3 and Turkey Point Unit 4 Sixth 10-Year Interval ISi Programs.
The proposed change would provide to the extent practical, a unified set of inservice inspection requirements for the FPL Fleet of nuclear reactors. Having the Fleet 10-Year Interval ISi Programs using the same Code of Record provides many implementation benefits which will maintain the existing level of quality and safety and provides cohesive programs for ISi, repairs, replacements, St. Lucie Nuclear Plant, Unit 2, Docket No. 50-389 L-2024-047 Turkey Point Nuclear Plant, Docket Nos. 50-250 and 50-251 Enclosure Page 2 of 2
and pressure testing. Employing different Codes of Record at multiple sites can create procedural and programmatic differences that could potentially result in implementation errors.
FPL has elected to implement the 2019 Edition of ASME BPV Code,Section XI, as the ISi Program Code of Record at St. Lucie Unit 2, Turkey Point Unit 3 and Turkey Point Unit 4, subject to the conditions listed in (b). The 2019 Edition represents the most recent version of ASME BPV Code,Section XI, incorporated by reference in 10 CFR 50.55a, Codes and Standards, thereby providing the most current NRG-approved requirements including incorporated ASME Code Cases.
- 5. Related Requirements:
10 CFR 50.55a(g)(4)(iv), Applicable ISi Code: Use of Subsequent Code Editions and Addenda, states:
"lnservice examination of components and system pressure tests may meet the requirements set forth in subsequent editions and addenda that are incorporated by reference in paragraph (a) of this section, subject to the conditions listed in paragraph (b) of this section, and subject to Commission approval. Portions of editions or addenda may be used, provided that all related requirements of the respective editions or addenda are met."
10 CFR 50.55a(a)(1 )(ii)(C) incorporates by reference Section XI, Division 1, of the ASME BPV Code,Section XI, 2019 Edition as approved in Reference 3.
- 6. Duration of Proposed Request:
The duration of this proposed request would apply for the entirety of the ISi Intervals specified below:
Plant 10-Year ISi ISi Interval ISi Interval Interval Start Date End Date
St. Lucie Unit 2 5th August 8, 2023 August?, 2033 Turkey Point Unit 3 6th February 22, 2024 February 21, 2034 Turkey Point Unit 4 6th April 15, 2024 April 14, 2034
- 7.
References:
7.1 10CFR50.55a, Codes and standards, dated January 1, 2022.
7.2 NRC Regulatory Issue Summary 2004-12, "Clarification on Use of Later Editions and Addenda to the ASME OM Code and Section XI," dated July 28, 2004.
7.3 Federal Register, Final Rule dated October 27, 2022, 87 FR 65128, American Society of Mechanical Engineers 2019-2020 Code Editions.