IR 05000313/2016401: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 35: Line 35:
While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country. Thus due to the security-related information contained in this correspondence, and in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). Please contact me at (817) 200-1527 with any questions you have regarding this letter.
While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country. Thus due to the security-related information contained in this correspondence, and in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). Please contact me at (817) 200-1527 with any questions you have regarding this letter.


Sincerely,/RA/ Mark S. Haire, Chief Plant Support Branch 1  
Sincerely,
/RA/ Mark S. Haire, Chief Plant Support Branch 1  


Division of Reactor Safety  
Division of Reactor Safety  


Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6  
Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 Enclosure:
 
===Enclosure:===
Inspection Plan  
Inspection Plan  



Revision as of 13:13, 10 May 2019

Non-Public Security Inspection Plan for Arkansas Nuclear One NRC Physical Security Inspection Report Numbers 05000313/2016401 and 05000368/2016401)
ML16242A081
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 08/31/2016
From: Haire M S
Division of Reactor Safety IV
To: Warren C
Entergy Operations
References
IR 2016401
Download: ML16242A081 (4)


Text

" " August 31, 2016

Mr. Clay Warren, Acting Site Vice President

Arkansas Nuclear One Entergy Operations, Inc.

1448 SR 333 Russellville, AR 72802-0967

SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR ARKANSAS NUCLEAR ONE (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBERS 05000313/2016401 AND 05000368/2016401)

Dear Mr. Warren:

On August 11, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Arkansas Nuclear One. The results of that review have been transmitted to you separately in a publicly av ailable assessment letter. This letter informs you of the NRC's plans for future security-related inspections at your facility.

The enclosed inspection plan lists the security-related inspections scheduled through June 30, 2018. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to dis cuss changes to the inspection plan should circumstances warrant any changes.

While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country. Thus due to the security-related information contained in this correspondence, and in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). Please contact me at (817) 200-1527 with any questions you have regarding this letter.

Sincerely,

/RA/ Mark S. Haire, Chief Plant Support Branch 1

Division of Reactor Safety

Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 Enclosure:

Inspection Plan

cc w/encl: Mr. Jonathan Laplante Director, Security Operations Entergy Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213

Mr. Gregory D. Brown Manager, Security Entergy Operations, Inc.

Arkansas Nuclear One

1448 S.R. 333 Russellville, AR 72802

cc w/o encl:

Electronic Distribution for Arkansas Nuclear One, Units 1 and 2