ML22229A486

From kanterella
Jump to navigation Jump to search
ANO Inspection Plan Letter 2022 Mid Cycle-FINAL
ML22229A486
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 08/23/2022
From: John Dixon
NRC/RGN-IV/DORS/PBD
To: Sullivan J
Entergy Operations
Dixon J
References
IR 2022005
Download: ML22229A486 (7)


Text

August 23, 2022 Mr. Joseph Sullivan, Site Vice President Arkansas Nuclear One Entergy Operations, Inc.

N-TSB-58 1448 S.R. 333 Russellville, AR 72802-0967

SUBJECT:

UPDATED INSPECTION PLAN FOR ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 (REPORT 05000313/2022005 AND 05000368/2022005)

Dear Mr. Sullivan:

The enclosed inspection plan lists the inspections scheduled through June 30, 2024, for Arkansas Nuclear One, Units 1 and 2. The U.S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

Beginning on January 1, 2023, the engineering inspection frequency will transition from a triennial (3-year) to a quadrennial (4-year) cycle. The new engineering inspection program will consist of a Comprehensive Engineering Team Inspection (CETI)1 and three Focused Engineering Inspections (FEIs) that will be performed in each quadrennial cycle. For the cycle beginning in 2023, the FEIs will be: Fire Protection Team Inspection, Commercial Grade Dedication and an engineering inspection that reviews age-related degradation and management2.

In response to the COVID-19 public health emergency (PHE), the NRC adjusted inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the ROP. While the PHE continues, overall conditions throughout the country support performance of our inspection and oversight activities to return to normal onsite presence by our resident and region-based inspectors and completion of nominal baseline inspection samples. We continue to monitor site-specific conditions and as discussed in our November 2, 2021 memo, Implementation of Inspection Programs Following Re-Entry from the Public Health Emergency for the Reactor Safety Program (ML21295A302), it may be necessary to alter how and when we perform our inspection and oversight activities as 1 Aspects of the Design Basis Assurance Inspection (DBAI), Evaluations of Changes, Tests, & Experiments, and Heat Sink inspections will be included in the CETI inspection. Attached Report 22 will reference DBAI procedure until the CETI procedure is made publicly available. Previously scheduled Evaluation of Changes, Tests, & Experiments and Heat Sink inspections have been cancelled and removed from attached Report 22.

2 The age-related degradation and management procedure is under development and will be publicly available by the end of calendar year 2022.

J. Sullivan 2 we balance the importance of protecting the health and safety of our staff with the need to conduct effective oversight that supports the NRCs critical safety mission.

For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here: https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.

The Regional Administrator has approved the staffs plan to conduct Inspection Procedure 93812, Special Inspection, at your facility, as indicated in the enclosed inspection plan.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 817-200-1574 with any questions you have regarding this letter.

Sincerely, Signed by Dixon, John on 08/23/22 John L. Dixon, Jr., Chief Projects Branch D Division of Operating Reactor Safety Docket Nos. 05000313, 05000368 License Nos. DPR-51, NPF-6

Enclosure:

Inspection Plan Distribution:

cc w/ encl: Distribution via LISTSERV

ML22229A486 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: Yes No Publicly Available Sensitive NRC-002 OFFICE SPE:DORS/D BC:DORS/D NAME ASanchezJLD for JDixon DATE 8/23/2022 8/23/2022 Site Inspection Activity Plan 07200013 - ANO (ISFSI) 07/01/2022 - 06/30/2024 Unit Start End Activity CAC Title Staff Count ANO ISFSI Inspection for Transition to Holtec FW System (Part 72) (Multiple weeks during timeframe) 4 9/1/2023 10/31/2023 IP 60854 001000 Preoperational Testing Of An ISFSI 9/1/2023 10/31/2023 IP 60855 001001 Operation Of An ISFSI 9/1/2023 10/31/2023 IP 60856 001003 Review of 10 CFR 72.212(b) Evaluations Prepared on 8/17/2022 12:38:51 PM 1 of 4

Site Inspection Activity Plan Arkansas Nuclear One 07/01/2022 - 06/30/2024 Unit Start End Activity CAC Title Staff Count Special Inspection, Security 1 1,2 8/1/2022 8/4/2022 IP 93812 Special Inspection EP 2022 Biennial Exercise & PI Inspection - ANO 4 1,2 8/8/2022 8/12/2022 IP 71114.01 000716 Exercise Evaluation 1,2 8/8/2022 8/12/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 8/8/2022 8/12/2022 IP 71151 001397 Performance Indicator Verification Heat Exchanger/Sink Performance Inspection - 07T - Arkansas Nuclear 2 1,2 8/22/2022 8/26/2022 IP 71111.07T 000700 Heat Exchanger/Sink Performance Security Access Control .02 1 1,2 9/12/2022 9/16/2022 IP 71130.02 000734 Access Control 1,2 9/12/2022 9/16/2022 IP 71130.09 001656 Security Plan Changes 1,2 9/12/2022 9/16/2022 IP 71151 001338 Performance Indicator Verification Target Set Inspection -ANO 1 1,2 9/12/2022 9/16/2022 IP 71130.14 000743 Review of Power Reactor Target Sets ANO 2022 4Q Resident Baseline 5 1,2 10/1/2022 12/31/2022 IP 71151 000746 Performance Indicator Verification Inservice Inspection 1RF30 - ANO 1 1 10/10/2022 10/21/2022 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP 1,3,PI - ANO 2 1,2 10/17/2022 10/21/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 10/17/2022 10/21/2022 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1,2 10/17/2022 10/21/2022 IP 71151 000746 Performance Indicator Verification ANO 2023 1Q Resident Baseline 5 1,2 1/1/2023 3/31/2023 IP 71151 000746 Performance Indicator Verification Cyber Security Inspection - ANO 4 1,2 2/6/2023 2/9/2023 IP 71130.10 000741 Cybersecurity ANO UNIT 2 2023 INITIAL EXAM 4 2 2/12/2023 2/18/2023 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV) 2 3/19/2023 3/25/2023 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

RP 1,4,PI - 2 1,2 3/27/2023 3/31/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 3/27/2023 3/31/2023 IP 71124.04 000728 Occupational Dose Assessment 1,2 3/27/2023 3/31/2023 IP 71151 000746 Performance Indicator Verification Prepared on 8/17/2022 12:38:51 PM 2 of 4

Site Inspection Activity Plan ANO 2023 2Q Resident Baseline 5 1,2 4/1/2023 6/30/2023 IP 71151 000746 Performance Indicator Verification Inservice Inspection 2R29 - ANO 1 2 4/17/2023 4/28/2023 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP 6,7 2 1,2 6/12/2023 6/16/2023 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1,2 6/12/2023 6/16/2023 IP 71124.07 000731 Radiological Environmental Monitoring Program Security Access Authorization .01 - Access Control .02 + PIV + Plan Change .09 2 1,2 6/12/2023 6/16/2023 IP 71130.01 000733 Access Authorization 1,2 6/12/2023 6/16/2023 IP 71130.02 000734 Access Control 1,2 6/12/2023 6/16/2023 IP 71130.09 001656 Security Plan Changes 1,2 6/12/2023 6/16/2023 IP 71151 001338 Performance Indicator Verification ANO 2023 3Q Resident Baseline 5 1,2 7/1/2023 9/30/2023 IP 71151 000746 Performance Indicator Verification ANO UNIT 1 2023 BRQ 3 1 7/9/2023 7/15/2023 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance EP 2023 Program Inspection - ANO 1 1,2 8/28/2023 9/1/2023 IP 71114.02 000717 Alert and Notification System Testing 1,2 8/28/2023 9/1/2023 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1,2 8/28/2023 9/1/2023 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 8/28/2023 9/1/2023 IP 71114.05 000720 Maintenance of Emergency Preparedness 1,2 8/28/2023 9/1/2023 IP 71151 001397 Performance Indicator Verification Commercial Grade Dedication Inspection - 21N - Arkansas Nuclear 3 1,2 9/11/2023 9/15/2023 IP 71111.21N.03 001808 Commercial Grade Dedication 1,2 9/25/2023 9/29/2023 IP 71111.21N.03 001808 Commercial Grade Dedication ANO 2023 4Q Resident Baseline 5 1,2 10/1/2023 12/31/2023 IP 71151 000746 Performance Indicator Verification FORCE-ON-FORCE PLANNING AND EXERCISE - ANO 4 1,2 11/13/2023 11/17/2023 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1,2 12/11/2023 12/15/2023 IP 71130.03 000735 Contingency Response - Force-On-Force Testing Security FFD .08 1 1,2 11/13/2023 11/17/2023 IP 71130.08 000740 Fitness For Duty Program MC&A - 1 1,2 11/27/2023 12/1/2023 IP 71130.11 000742 Material Control and Accounting (MC&A)

ANO UNIT 1 2024 INITIAL EXAM 7 Prepared on 8/17/2022 12:38:51 PM 3 of 4

Site Inspection Activity Plan 1 2/4/2024 2/10/2024 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV) 1 3/3/2024 3/9/2024 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

Inservice Inspection - ANO (U1) 1 1 4/15/2024 4/26/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

Prepared on 8/17/2022 12:38:51 PM 4 of 4