September 05, 2024
SUBJECT:
ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - COMPREHENSIVE ENGINEERING TEAM INSPECTION REPORT 05000313/2024011 AND 05000368/2024011
Dear Doug Pehrson:
On August 8, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Arkansas Nuclear One, Units 1 and 2 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Vincent G. Gaddy, Chief Engineering Branch 1 Division of Operating Reactor Safety Docket Nos. 05000313, 05000368 License Nos. DPR-51, NPF-6
Enclosure:
As stated
Inspection Report
Docket Nos.
05000313 and 05000368
License Nos.
Report Nos.
05000313/2024011 and 05000368/2024011
Enterprise Identifier:
I-2024-011-0010
Licensee:
Entergy Operations, Inc.
Facility:
Arkansas Nuclear One, Units 1 and 2
Location:
Russellville, AR
Inspection Dates:
July 15, 2024, to August 08, 2024
Inspectors:
D. Bryen, Reactor Inspector
W. Cullum, Senior Reactor Inspector
C. Franklin, Reactor Inspector
S. Kobylarz, Contractor
R. Kumana, Senior Reactor Inspector
R. Smith, Reactor Systems Engineer
F. Thomas, Reactor Inspector
Approved By:
Vincent G. Gaddy, Chief
Engineering Branch 1
Division of Operating Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a comprehensive engineering team inspection at Arkansas Nuclear One, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
===71111.21M - Comprehensive Engineering Team Inspection The inspectors evaluated the following components and listed applicable attributes, permanent modifications, and operating experience:
Structures, Systems, and Components (SSCs) (IP section 03.01)===
For each component sample, the inspectors reviewed the licensing and design bases including:
- (1) the Updated Final Safety Analysis Report (UFSAR);
- (2) the Technical Specifications (TS); and
- (3) the Technical Requirements Manual (TRM). The inspectors reviewed a sample of operating procedures (including normal, abnormal, and emergency procedures) and overall system/component health (including condition reports and operability evaluations, if any). The inspectors performed visual inspections of the accessible components to identify potential hazards and/or signs of degradation. Additional component specific design attributes reviewed by the inspectors are listed below.
- (1) B-6, 480V Load Center
- Component modifications and associated evaluations
- Design calculations
- Visual inspection of equipment
- Vendor and design requirements
- Applicable operating experience relevant to sample
- Corrective Action Documents
- Maintenance and Work Orders
- Operator action AC8-HFC-FO-ENB56, Align B56 from another Train
- (2) X-03, Startup Transformer No.1
- Thermography procedure and results
- Voltage analysis and short circuit calculations
- Visual inspection during equipment walkdown
- Review of vendor manual and plant design drawings
- Maintenance and Work Orders
- Design calculations
- Pump vendor manual
- System operating conditions and pump curves
- Physical walkdown of component to include inlet and discharge flow-path
- System health report
- Preventative maintenance tasks
- History of condition reports
- Piping and instrument drawings
- Operator action FLX-HFC-FO-P7AMC, Manual control of EFW Pump
- (4) CV-3824, Unit 1 Service Water Discharge to Flume Valve
- Design calculations
- Drawings and vendor manual
- Preventative maintenance tasks
- History of recent work orders
- Replacement of valve
- Physical walkdown of valve including a portion of the system
- System health report
- Protection Against External Events
- Mechanical Design Calculations and Considerations
- Electrical Design Calculations and Considerations
- Control Logic for Switchover to Recirculation/Make-up Source
- Ultrasonic Testing (UT) Examinations of Tank Bottom
- Operator Action EFW-HFC-FO-P75AF, Start and align Auxiliary Feedwater (6)2P-89C, Unit 2 High Press Safety Injection Pump
- Maintenance Effectiveness
- Modifications
- Translation of Vendor Specifications
- Protection Against External Events
- Mechanical Design Calculations and Considerations
- Test/Inspection Procedures, Acceptance Criteria, and Recent Results
- Electrical Design Calculations and Considerations
- Operator action HPI2XHE-FO-OTCLT, Establish Cooling after Loss of Feedwater (7)2F-495A/B, Unit 2 Service Water Pre-Screens
- Service Water (SW) pre-screen design basis documents
- Calculations for SW pre-screen design requirements and required differential pressure (dP) requirements
- Work order of external coating application
- SW pre-screen system dP tubing design and instrumentation diagram
- Maintenance work order history records of cleaning of the pre-screens
- System health report review for unit 2 service water
- Visual inspection via pictures and plant walk-down of the as-built configuration and material condition (8)2K-4A, Unit 2 Emergency Diesel Generator
- Updated final safety analysis report, technical specifications, and technical specifications bases document
- Diesel generator system design criteria document
- Vendor manuals and recommendations
- Corrective action program documents
- Preventative maintenance tasks
- Visual inspection of the as-built configuration and material condition
- Calculations for seismic analysis, EDG cooler loading capacity, and load sequencing
- Diesel generator room ventilation
- Diesel generator reliability monitoring
- Updated Safety Analysis Report (USAR), technical specifications (TS), and TS bases document
- Visual inspection of bus for as-built configuration and material condition
- Environmental conditions
- Short circuit and equipment protection
- Load voltage
- Bus under voltage protection alarm
- Component maintenance history
- System Health Report (10)2D-11, Unit 2 125 VDC Battery
- Updated Safety Analysis Report (USAR), technical specifications (TS), and TS bases document
- Visual inspection of battery and rack for as-built configuration and material condition
- Environmental conditions
- Seismic qualification
- Battery duty cycle and sizing
- Operating procedures for Station Blackout (SBO) and Extended Loss of AC Power (ELAP) DC load management
- Short circuit and equipment protection
- Performance test surveillance
- Battery inspection and connection resistance surveillance
- Component maintenance history
- System Health Report
- Operator action DC12XHE-FO-BATLS, Strip Loads on Battery 2D-11
Modifications (IP section 03.02) (5 Samples)
- (2) EC 81705, Unit 1 Replace PZR heaters
- (5) EC 79325, ANO U2 Degraded Voltage Modifications 10 CFR 50.59 Evaluations/Screening (IP section 03.03) (17 Samples)
Upgrade
- (3) FFN-2022-003, ANO 2 Install Microprocessor Relay & Activate Out of Step Function and Loss of Field with Two Zones of Protection / EC 88912
- (4) FFN-2023-003, Unit1/Unit2 Change in Turbine Valve Testing
- (6) EC-94021, Steam Generator Tube Rupture (SGTR) Dose CALC-08-E-0024-04
- (7) EC-0054105613, (Temporary Change) Integrated Control System: Runback on Loss of a Single RCP Disabled
- (8) EC 94259, U1 Evaluation of Opening 1 RUB of PZR Breakers
- (9) EC 93796, ICS Tri-Stable Relay Printed Circuit Board Acceptable Replacement Components and Repair
- (11) EC-93597, Evaluation of Operational Measures to Minimize Peaking Factor Deviations
- (12) EC-95315, Service Water As-Left Flow Test Margin Recovery Methodology Using 2SW-13A/B/C
- (13) EC-93600, Alternate External Coating or Pipe Treatment for Buried Service Water Related Piping
- (14) EC-95163, Unit 1 Steam Generator Under-Temperature Post Weld Heat Treat (PWHT) Evaluation
- (16) EC 95372, Update Calcs for the 2023 Offsite Power Supply Study
- (17) EC-0054009942, Evaluate Alternative Material for Valve Internals of Containment Spray Header B Isolation Valve
Operating Experience Samples (IP section 03.04) (3 Samples)
- (1) OE-NOE-2021-00107, Battery Charger Relay
- (2) OE-NOE-2023-00071, Check valve testing for AFW
- (3) OE-NOE-HQN-2023-00348, Invalid NDE Testing for Lift Rigs
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On August 8, 2024, the inspectors presented the comprehensive engineering team inspection results to Doug Pehrson and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
2403.013
HPSI Motor Inspection and Maintenance 2P89-A, B, & C
88-E-0035-74
Seismic calculations for various mechanical equipment
associated with the Diesel Generators at Arkansas Nuclear
One Unit-2
89-E-0144-01
EDG Loading for Buses 2A3 and 2A4
91-D-2003-01
Emergency Diesel Generator Capacity Ratings
91-E-0090-02
ANO-2 EDG Ventilation
ANO-ER-06-019-
Qualification for Service Water Bay Pre-Screens - 2F-495A
and 2F-495B and Associated Work Platforms
000
CALC-09-E-0002-
ANO-1 Start-Up 2 Fast and Manual Transfer Capability
CALC-09-E-0016-
ANO-1 Start-up #1 & Unit Aux Millstone Studies
CALC-11-E-0006-
ANO-2 Start-Up 2 Fast and Manual Transfer Capability
CALC-14-E-0002-
ANO-2 FLEX Battery Load Shed Calculation
CALC-16-E-0364-
ANO-2 EDG Transient Analysis for EDG Governor
Replacement
CALC-18E-
00008-01
Table 2.1, Unit 1Worst Case Arc Flash Values
001
CALC-19-E-0074-
ANO-1 Replacement Pressurizer Heater Bundle (Non-
Pressure Boundary), Pressurizer Supports, and Surge Line
Qualification
CALC-19-E-0074-
ANO-1 Replacement Heater Bundle Closure Analysis
CALC-19-E-0074-
ANO-1 Pressurizer Heater Bundel Replacement: Stress
Analysis of Pressure Boundary Except Diaphragm and Seal
CALC-19-E-0074-
ANO-1 Pressurizer Heater Sheath Wall Thickness Deviation
Evaluation
Calculations
CALC-4.8.1
AP&L Condensate Storage Tanks
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
CALC-6-E-0002-
ANO Offsite Power Requirements
CALC-6600-2-882
Piping Stress Summary ANSI-B31.1
CALC-80-D-1083-
CST Nozzle Stress Analysis
1/18/1980
CALC-82-2086-60
Design Calculations for T-41B
07/15/1985
CALC-82-D-2086
Piping Design Criteria for "Q" CST Project
07/15/1985
CALC-82-D-2086-
Volume of CST T-41B Requiring Tornado Missile Protection
CALC-84-D-
Seismic Qualification Report of 2D11 Battery, Type LC-31
CALC-84-E-0103-
Panel 2D01 - Plant Protection Study
CALC-84-EQ-
0034-01
Aging, Pressure, and Radiation Susceptibility Analyses of
Allis Chalmers Motors on a Worst Case Basis
CALC-85-S-
00002-01
ANO-2 Diesel Generator #1 (2K-4A) and #2 (2K-4B)
Loading
CALC-86-E-0020-
1E Station Battery 2D11 Duty Cycle and Sizing Calculation
CALC-86-E-0074-
23
Pressurizer Heater Bundle Closure Torque
CALC-86-E-0074-
24
Detailed Heat Loss Calculation on the Pressurizer Heater
Bundle Insulation System at Arkansas Nuclear One Unit 1
CALC-86-E-0074-
25
Structural Analysis on the Pressurizer Heater Bundle
Insulation System at Arkansas Nuclear One Unit 1
CALC-86-E-0074-
PZR Shock Calc
CALC-88-E-0086-
NRCB-88-04 Review for 2P89 A, B, & C Minimum Flow
Evaluation
7/15/1985
CALC-90-E-0013-
Eval Of Suction and Disch Nozzle Load for HPSI Pump
2P89A 2P89B 2P89C
CALC-90-E-0116-
ANO-2 EOP Setpoint Basis Document
016
CALC-90-E-0116-
Level Versus Volume for Selected Tanks
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
CALC-91-E-0001-
ANO U2 Millstone Study - Connected Load, MCC Circuit
Voltage Drop and Load Center Accident Loading
CALC-91-E-0090-
ANO-2 Switchyard, Battery, DC Corridor 2104 Emergency
(Post Accident) Temperature Evaluation
CALC-91-E-0116-
NPSH Calculation for HPSI and RB Spray
CALC-91-E-0120-
256
Seismic Test Report Review and Acceptance of 2K-4A
EDG Speed Switch 2SY-2801 and 2K-4B Speed Switch
CALC-92-E-0072-
ANO Unit 2 Class 1E 125 VDC Voltage Drop Study
CALC-92-E-0072-
Battery 2D11 Recharge Time
CALC-92-E-0078-
Unit 2 HPSI System Pump Performance Requirements
CALC-93-SQ-
0002-405
Seismic Qual Review Summary for Pressurizer T1
CALC-94-E-0025-
ANO-2 Condensate Inventory Requirements to Remove
Decay Heat for Three Days
CALC-94-E-0025-
ANO-2 Condensate Requirements
CALC-94-SQ-
1001-21
U1 SQUG SEWS and OSVS for Equipment Class 21
CALC-94-SQ-
2001-21
U2 SQUG SEWS and OSVS for Equipment Class 21
CALC-95-SQ-
21-01
USI A-46/IPEEE Tank Evaluations for ANO-1
CALC-95-SQ-
21-01
USI A-46/IPEEE Tank Evaluation for ANO-2
CALC-98-E-0010-
Determination of NPSHA and Minimum Recirculation Flow
for EFW Pumps
CALC-ANO2-EP-
21-00001
Risk-informed Repair Replacement Activities (RI-RRA) -
ANO Unit 2 Service Water
000
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
CALC-D-11
High Pressure Safety Injection Pump Runout
Calculation No.
90-E-0116-01,
Page 166
EOP Criteria for Local Trip of EDG During Degraded SW
Flow
06/17/1991
Corrective Action
Documents
Condition Reports
(CR-ANO-)
1-2009-00470, 1-2010-01466, 1-2015-00299, 1-2021-
01140, 1-2021-01381, 1-2021-01516, 1-2022-00452, 1-
22-00512, 1-2022-01541, 1-2022-01753, 1-2023-00386,
2-2008-00381, 2-2016-02987, 2-2016-04462, 2-2020-
03383, 2-2020-03521, 2-2021-00765, 2-2021-02820, 2-
22-00950, 2-2023-00011, 2-2023-00091, 2-2023-00437,
1-2015-02355, 2-2023-02404, 2-2023-02660, 2-2024-
232, 2-2024-00233, 2-2024-00317, 2-2022-01186, C-
21-00726, C-2021-01717, C-2021-02667, C-2022-03486,
C-2023-03920, C-2024-01205
Condition Reports
(CR-ANO-)
1-2024-01521, 1-2024-01525, 1-2024-01526, 1-2024-
01541, 1-2024-01543, 1-2024-01543, 1-2024-01544, 1-
24-01639, 2-2024-00913, 2-2024-00914, 2-2024-00915,
2-2024-00916, 2-2024-00917, 2-2024-00918, 2-2024-
00919, 2-2024-00920, 2-2024-00921, 2-2024-00963, 2-
24-01033, 2-2024-01034, 2-2024-01039, 2-2024-01936,
C-2024-01205, C-2024-01210, C-2024-01318, C-2024-
01321, C-2024-01333, C-2024-01335, C-2024-01335, C-
24-01337, C-2024-01343
Corrective Action
Documents
Resulting from
Inspection
Condition Reports
(CR-HQN-)
24-00856
2-8143005-C
Pressurizer Heater Bundle Cover Plate Modification
000
35720-2 - 37
CST T-41B as Built Drawings
10/06/1986
C-2083 Sheet 3
Service Water Prescreen
301
E-2001, Sheet 1
Station Single Line Diagram
E-2004, Sheet 1
Single Line Meter & Relay Diagram 4160 Volt System, Main
Supply
E-2005, Sheet 1
Single Line Meter & Relay Diagram 4160 Volt System
Engineered Safety Features
Drawings
E-2006, Sheet 1
Single Line Diagram Low Voltage Safety Systems Power
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Supplies
E-2017, Sheet 1B
Red Train Vital AC and 125 V DC Single Line Distribution
E-202, Sheet 4
Schematic Diagram Pressurizer On-Off Heater Power &
Indication
E-2022, Sheet 1
20 Volt AC Engineered Safety Features and 125 Volt DC
Power Distribution Panels
E-2028, Sheet 1
25V DC Distribution Panels 480V AC Pressurizer Heater
Distribution Panels
E-203, Sheet 1
Schematic Diagram Pressurizer Proportional Heater Control
E-2085 Sheet 1
Typical 125V DC Motor Control Center Full Voltage
Reversing Starter
007
E-2102, Sheet 1
Schematic Diagram Emergency Diesel Generator No. 1
(2K4A) Excitation, Regulation, Governor Control
E-2102, Sheet 1A
Schematic Diagram Emergency Diesel Generator No. 1
(2K4A) Excitation, Regulation, Governor Control
E-2102, Sheet 1F
Schematic Diagram Emergency Diesel Generator No. 2
(2K4B) Excitation, Regulation, Governor Control
E-2102, Sheet 2C
Schematic Diagram Emergency Diesel Generator 2K4A
(2DG1) Engine Stop Control
E-2198, Sheet 1
Schematic Diagram Low Pressure Safety Injection Pump
E-2299 Sheet 2
EFW System Discharge Valve 2CV-1026-2
010
E-2299 Sheet 3
008
E-2300 Sheet 1
EFW System Discharge Valve 2CV-1076-2
015
E-514, Sheet 3
Connection Diagram 480 Volt MCC-Reactor Pressurizer
HTRS [Heaters] B72 (Partial)
EC-
0054105613M1R-
168-138Sketch
Sketch Showing the T-Mod Installed
FP-2103, Sheet 1
Fire Zones Intermediate Floor Plan EL 368'-0" and 372'-0"
FP-2103, Sheet 1
Fire Zones Intermediate Floor Plan EL 368-0 and 372-0
M-2012-84, Sheet
2K-4A & B Connection Diagram Power Unit
M-204
M-2060
P&ID Intake Pump House
015
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
M-2209 Sheet 1
28
M-2210, Sheet 1
Piping & Instrument Diagram Service Water System
M-2217, Sheet 3
Piping & Instrument Diagram Emergency Diesel Generator
Auxiliary Systems
M-2292-22 - 41
CST 2T41A as Built Drawings
M-2292-42 - 61
CST 2T41B as Built Drawings
M-242-A-99 1
Outline and Assembly Drawing 18" Class 150 Valve
M-292-4 - 21
CST T-41 as Built Drawings
04/7/1978
M1G-1 Sheet 1
Pressurizer General Arrangement
M1G-14 Sheet 1
Heater Bundle Details
M1G-4, Sheet 1
Pressurizer Heaters Elementary & Power Schematic
MG1-13 Sheets 1-
Pressurizer Heater Bundle Assembly & Details
SK-EC81705-C-
2
Large Pipe Isometric Pressurizer Relief Piping From PSV-
1002 to Quench Tank T-42
Evaluate Alternative Material for Valve Internals of
Containment Spray Header B Isolation Valve
000
U-2 EDG Speed Switch 2SY-2801 & 2SY-2821
Replacement
001
ANO-2 EFW Pump Woodward Governor Controls Upgrade
Obsolete - 2Y-25 Inverter Replacement
Install Debris Baskets on the U2 SW PRE-SCREENS 2F-
495A & 2F-495B
000
ANO U2 Degraded Voltage Modifications
Pressurizer Heater Bundle Replacement ANO Unit 1
000
Pressurizer Heater Bundle Replacement ANO Unit 1
2SW-47A&B (2E-27 Spent Fuel Pool HX Outlet Check
Valves) Installation and 2SW-45A&B Internals Removed
IST Testing Requirements for Unit 2 EFW and HPSI Pumps
Alternate External Coating or Pipe Treatment For Buried
Service Water Related Piping and Holiday Testing
Exemption for Certain Situations
Engineering
Changes
Update Engineering Standard NES-13 Document to Add
000
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Clarity to the Design Room Temperature 2P-7A & 2P-7B
EFW Pump Rooms (Room 2024 & 2025) Reference CR-
ANO-2-2022-01648
Unit 1 Steam Generator Under-Temperature Post Weld
Heat Treat (PWHT) Evaluation
Update Calcs for the 2023 Offsite Power Study
SEP-CV-ANO-
001
ANO Check Valve Program
CFR Part 21
Follow-up Report
Further Evaluation of Lift Rig Inspections
11/10/2023
25093
NUPIC Audit/Survey Mistras Services
06/10/2021
BAW-10179P
Revised Final Safety Evaluation for Areva Inc. Topical
Report, Safety Criteria and Methodology for Acceptable
Cycle Reload Analyses
009
CYCLE 31
Core Operating Limits Report
000
Defeat Loss of Single RCP Runback Feature in ICS
000
ANO Unit 1 Turbine Control System DEHC [Digital
Electrohydraulic] Upgrade Implementation
Evaluation of Extending Main Turbine Valve Testing
Intervals
ANO-1 Evaluate Operational Measures to Minimize Peaking
Factor Deviations
000
Steam Generator Tube Rupture (SGTR) Dose CALC-08-E-
24-04 for Flashing Fractions Update for SG T-H Analysis
000
ANO-2 Fuel Assembly Classifications for SFP Criticality
Analysis (12/1/2022)
000
Service Water As-Left Flow Test Margin Recovery
Methodology Using 2SW-13A/B/C
000
ER-ANO-2005-
0148-001
ANO-2 SW Pump Strainers System Hardening NCP
000
FFN-2022-003
ANO 2 Install Microprocessor Relay & Activate Out of Step
Function and Loss of Field with Two Zones of Protection /
Engineering
Evaluations
FFN-2023-001
ANO-2 Steam Generator Tube Rupture Dose Analysis
000
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
(EC94021) (50.59 Evaluation)
FFN-2023-004
Add Switch in Series with RAS Relay to Avoid Lifted Lead
Temp Mod SIPD 9349/EC 95520
FFN-2024-001
[Temporary Change] Integrated Control System: Runback
on Loss of a Single RCP Disabled / EC 0054105613
000
PAD for EC- 0054105613
Defeat Loss of Single RCP Runback Feature in ICS / EC- 0054105613
000
ANO Unit 2 Degraded Voltage Modifications and Associated
Child EC 79326 - 79337 (with exception of EC 79334)
Evaluation of Operational Measures to Minimize Peaking
Factor Deviation
000
ANO-2 Fuel Assembly Classifications for SFP Criticality
Analysis
000
Service Water As-Left Flow Test Margin Recovery
Methodology Using 2SW-13A/B/C
000
Revise Engineering Report CALC-93-R-0003-01, Offsite
Power System Voltage Re-Evaluation
PSA-ANO2-01-
SY-15
ANO-2 PRA - Appendix 15 - Service Water System
Notebook (SW)
2
ULD-2-SYS-10
ANO Unit 2 Service Water System
014
Unit 2 2R29 As Left Performance Balance Plan, EC95315 -
Performance Document
05/10/2023
U1 Ops Turnover Sheet (Reference: Note for monitoring and
initiating action to pump the QCST Valve Pit)
07/17/2024
2HBC-34-1 (2SW-1551) Leak Analysis for SW Piping to
06/24/2024
93-R-0003-01
Engineering Report Offsite Power System Voltage Re-
Evaluation
Letter of Agreement Between ANO and the Army Corp of
Engineers
2/09/2023
Establish RCS Once-Through-Cooling Heat Removal (Unit
2)
08/06/2024
Miscellaneous
Manual Control of P-7A EFW Pump Due to Imminent DC
Battery Depletion (Unit 1)
08/05/2024
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Align B56 to Other Power Train (Unit 1)
08/07/2024
Start and Align P-75 AFW Pump to Steam Generators (Unit
1)
08/07/2024
Startup a Diesel Generator Without DC Control Power (2K-
4B) (Unit 2)
08/06/2024
Perform Load Shedding of Station Vital Batteries Following
Station Blackout (Unit 2)
08/06/2024
Guidelines for 10 CFR 50.59 Evaluations
001
PM 0001517101
2F-495A/B Filter Removal, Cleaning, Reinstallation
7/18/2024
STM 2-42
Service Water & Auxiliary Cooling Water Systems
2
TD 1005.0020
Instructions Metal-Enclosed Low-Voltage Power Circuit
Breaker Switchgear
TDB-015-0210
Instruction Manual Unit 1 Pressurizer Vessel
TDI075-0260
Instruction Manual for Ingersoll-Rand High Pressure Safety
Injection Pumps
TDS188-0040
Installation, Operation, and Maintenance Instructions for
Unit Two High Pressure Safety Injection Pump Motors
Unit 2 SW / ACW
(Tier 1 / 2)
1st Quarter Accessible Walkdown Plan
03/27/2024
1104.005
Integrated Control System
040
1106.006
Emergency Feedwater Pump Operation
115
1107.002
ES Electrical System Operation
051
202.001
2
202.004
Overheating
013
202.008
Blackout
21
2104.004
Shutdown Cooling System
2104.0129
Service Water Change Notice (Form Number 1000.006S)
27
2104.029
Service Water System Operations
27
2104.036
Emergency Diesel Generator Operations (Exhibit 1 & 2)
104
2107.003
Inverter and 120VAC Electrical System Operation (Exhibit
and 17)
040
202.006
Loss of Feedwater
015
Procedures
202.008
Station Blackout
019
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
202.008
DG Operations Station Blackout
202.010
Standard Attachments (Attachment 25)
033
203.012A
Annunciator 2K01 Corrective Action
203.012E
Annunciator 2K05 (E-6) SW Screens dP HI
043
203.012U
Annunciator 2E12 Corrective Action
25
203.01H
Annunciator 2K08 Corrective Action
203.022
Loss Of Service Water
019
203.037
Loss of 125V DC
018
2305.049
EDG Periodic Test
046
2305.062
Service Water System Flow Test (May 10, 2023)
006
2307.016
Unit 2 - 2D-11, 2D-12, & 2D-13 Battery Surveillance
2416.031
Unit 2 2B5 and 2B6 Bus Undervoltage Relay Calibration
2416.045
Unit 2 2K4A/2K4B EDG Periodic Maintenance
21
Extended Loss of AC Power DC Load Management
Loss of Main Feedwater Pump Technical Guide
Engineering Change Process
EN-DC-115-01
Industry Standard Design Process
Acceptance of Vendor Documents
Classification of Structures, Systems, and Components
Safety and Quality Classification of Replacement Parts
Procurement Engineering Process
EN-DC-313-01
Industry Standard Item Equivalency Process
EN-DC-313-02
Procurement Engineering - Technical Evaluation of
Replacement Parts
Entergy Repair/Replacement Program
Implementation of the Technical Specification Surveillance
Frequency Control Program
Loss of Feedwater
FDS-002
Unit 2 Extended Loss of AC Power
OP-1001.008
Surveillance Frequency Control Program
2
OP-1203.027
Loss of Steam Generator Feed
OP-2106.015
Condensate Transfer System
OP-2305.001
Integrated Engineering Safeguards Test
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
OP-2305.063
SU#2 Transformer Load Shed Periodic Test
OP1106.015
Condensate Transfer System
Self-Assessments SW - 2 (Service
Water)
Health Report Draft
07/15/2024
Work Orders
Work Orders
(WOs)
81945, 336255, 431184, 431185, 431186, 504350, 547662,
2641250, 52653569, 52674221, 52772416, 52981454,
53012441, 54036385, 54079917, 54111811, 00015171-01,
00049490-01, 00467461-01, 00509049-06, 00509051-06,
00509053-05, 00509053-06, 00509053-07, 00509053-08,
00509055-18, 00509055-19, 00509055-28, 00509055-29,
00520545-01, 00546322-01, 00574715-04, 00574718-01,
239454-01, 52867578-01, 52867892-01, 52938781-01,
2986131-01, 53006826-01, 53023823-01, 54036262-25,
54036594-16, 54105685-05