Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E LAMAR BLVD
ARLINGTON, TX 76011-4511
August 31, 2016
Clay Warren, Acting Site Vice President
Arkansas Nuclear One
Entergy Operations, Inc.
1448 SR 333
Russellville, AR 72802-0967
SUBJECT:
MID-CYCLE ASSESSMENT LETTER FOR ARKANSAS NUCLEAR ONE,
UNITS 1 AND 2 (REPORT 05000313/2016005 AND 05000368/2016005)
Dear Mr. Warren:
On August 11, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle
performance review of Arkansas Nuclear One (ANO), Units 1 and 2. The NRC reviewed the
most recent quarterly performance indicators (PIs) in addition to inspection results and
enforcement actions from July 1, 2015, through June 30, 2016. This letter informs you of the
NRCs assessment of your facility during this period and its plans for future inspections at your
facility.
The NRC determined the performance at ANO, Units 1 and 2 during the most recent quarter
remained within the Multiple/Repetitive Degraded Cornerstone Column of the NRCs Reactor
Oversight Process (ROP) Action Matrix. On March 4, 2015, ANO Units 1 and 2 transitioned to
the Multiple/Repetitive Degraded Cornerstone Column (Column 4) of the ROP Action Matrix as
a result of having one Yellow finding in each unit involving the failure to adequately approve the
design and to load test a temporary lift assembly, and one Yellow finding in each unit involving
the failure to design, construct, and maintain plant design features required to protect safety-
related equipment from the effects of flooding.
On June 9, 2016, the NRC completed a supplemental inspection and independent review of the
causes for declining safety performance at ANO, as well as corrective actions taken and
planned to sustain improvement efforts. The NRC inspection team determined that ANO,
Units 1 and 2 are being operated safely and Entergy Operations, Inc. (EOI) understands the
depth and breadth of performance concerns associated with ANOs performance decline. The
NRC team concluded that effective implementation of the licensees Comprehensive Recovery
Plan (CRP), supported by the allocation of adequate resources and continued enhanced
oversight by EOI leadership, should lead to substantial and sustained performance
improvement. The NRC team identified missed opportunities for ANO to have promptly initiated
performance improvements since being placed in Column 4. The NRC team also concluded
that your evaluations and corrective actions for three unplanned, Unit 2 scrams that contributed
to a White Unplanned Scrams per 7000 Critical Hours PI, were satisfactory. Based on the
C. Warren
- 2 -
results of this inspection, the White PI was closed. The results of the inspection were
documented in NRC Inspection Report 05000313/2016007 and 05000368/2016007
(ML16161B279).
In a letter dated May 17, 2016, ANO Comprehensive Recovery Plan (ML16139A059), EOI
notified the NRC staff of its plan to perform specific actions to resolve the causes for declining
performance at ANO. On June 17, 2016, the NRC issued a Confirmatory Action Letter
(ML16169A193) which confirmed EOI commitments to take specific actions included in the
ANO Comprehensive Recovery Plan. The Confirmatory Action Letter groups these actions in
six categories:
Significant performance deficiencies (i.e., actions to address the two Yellow findings)
Identification, assessment and correction of performance deficiencies
Human performance
Equipment reliability and engineering programs
Safety culture
Service water self-assessment
The NRC plans to conduct quarterly inspections to review your progress toward completing the
ANO Comprehensive Recovery Plan actions that are identified in the Confirmatory Action Letter.
The NRC will use Inspection Procedure 92702, Follow-up on Traditional Enforcement Actions
Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, and
Alternative Dispute Resolution Confirmatory Orders, to assess your effectiveness in completing
corrective actions. The results of these inspections will provide information for future
performance assessments of ANO in accordance with NRC Inspection Manual Chapter 0305,
Operating Reactor Assessment Program.
The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine
inspections performed by resident inspectors are not included in the inspection plan. The
inspections listed during the second half of the inspection plan are tentative and may be revised
at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the
resolution of any scheduling conflicts and personnel availability issues. The NRC will contact
you as soon as possible to discuss changes to the inspection plan should circumstances
warrant any changes. This inspection plan does not include security related inspections, which
will be sent via separate, non-publicly available correspondence.
In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order
Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-
Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to
Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts
towards compliance with these Orders, and the information gathered will aid staff in
development of the ultimate Safety Evaluation for the site. After the NRC staff receives the
Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff
will confirm through inspections the full implementation of the orders mentioned above by
performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies
and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness
Communication/Staffing/Multi-Unit Dose Assessment Plans.
C. Warren
- 3 -
In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the
Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the
NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning
in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue
to conduct quarterly assessment meetings and communicate changes in the assessment of
licensee performance in accordance with the guidance in Inspection Manual Chapter 0305,
Operating Reactor Assessment Program.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs
Rules of Practice, a copy of this letter will be available electronically for public inspection in the
NRC Public Document Room or from the Publicly Available Records (PARS) component of
NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public
Electronic Reading Room).
Please contact Mr. Neil OKeefe at 817-200-1574 with any questions you have regarding this
letter.
Sincerely,
/RA/
Kriss M. Kennedy
Regional Administrator
Docket Nos.
50-313, 50-368
Enclosure:
Arkansas Nuclear One Units 1 and 2
Inspection/Activity Plan
Page 1 of 3
08/30/2016
09:31:17
Report 22
Unit
Number
Planned Dates
Start End
Inspection Activity
Title
No. of Staff
on Site
Arkansas Nuclear One
Inspection / Activity Plan
07/01/2016 - 06/30/2018
EXAM
- INITIAL EXAM ANO U1
6
1
INITIAL EXAM ANO UNIT 1 (08/2016)
X02568
07/25/2016
07/29/2016
1
INITIAL EXAM ANO UNIT 1 (08/2016)
X02568
08/22/2016
09/02/2016
- RADIATION SAFETY - TEAM
4
1, 2
IP
Radiation Monitoring Instrumentation
06/27/2016
07/01/2016
1, 2
IP
Radioactive Gaseous and Liquid Effluent Treatment
06/27/2016
07/01/2016
1, 2
IP
Radiological Environmental Monitoring Program
06/27/2016
07/01/2016
1, 2
IP
Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation
06/27/2016
07/01/2016
TSB 52B
- BIENNIAL PI&R INSPECTION
5
1, 2
IP
Problem Identification and Resolution
08/29/2016
09/02/2016
1, 2
IP
Followup On Corrective Actions For Violations And Deviations
92702
08/29/2016
09/02/2016
1, 2
IP
Problem Identification and Resolution
09/12/2016
09/16/2016
INSP
- BIENNIAL REQUAL INSPECTION U1
2
1
IP
Licensed Operator Requalification Program
7111111B
07/11/2016
07/15/2016
INSP
- BIENNIAL REQUAL INSPECTION U2
2
2
IP
Licensed Operator Requalification Program
7111111B
07/11/2016
07/15/2016
- EP PERFORMANCE INDICATORS
2
1
IP
Drill/Exercise Performance
71151-EP01
08/15/2016
08/19/2016
1
IP
ERO Readiness
71151-EP02
08/15/2016
08/19/2016
1
IP
Alert & Notification System Reliability
71151-EP03
08/15/2016
08/19/2016
- BIENNIAL EP EXERCISE INSPECTION
4
1, 2
IP
Exercise Evaluation
7111401
08/15/2016
08/19/2016
1, 2
IP
Emergency Action Level and Emergency Plan Changes
7111404
08/15/2016
08/19/2016
EXAM
- INITIAL EXAM U2
6
2
INITIAL EXAM ANO UNIT 2 (02/2017)
X02585
01/09/2017
01/13/2017
2
INITIAL EXAM ANO UNIT 2 (02/2017)
X02585
02/13/2017
02/17/2017
- INSERVICE INSPECTION 1R26
1
1
IP
Inservice Inspection Activities - PWR
7111108P
09/26/2016
10/07/2016
- RADIATION SAFETY
2
1, 2
IP
Radiological Hazard Assessment and Exposure Controls
10/03/2016
10/07/2016
1, 2
IP
Occupational ALARA Planning and Controls
10/03/2016
10/07/2016
1, 2
IP
Occupational Exposure Control Effectiveness
71151-OR01
10/03/2016
10/07/2016
1, 2
IP
RETS/ODCM Radiological Effluent Occurrences
71151-PR01
10/03/2016
10/07/2016
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Attachment 2 - Proposed Inspection Plan
Official Use Only - Sensitive Internal Information/Security-Related Information
Official Use Only - Sensitive Internal Information/Security-Related Information
Enclosure
Page 2 of 3
08/30/2016
09:31:17
Report 22
Unit
Number
Planned Dates
Start End
Inspection Activity
Title
No. of Staff
on Site
Arkansas Nuclear One
Inspection / Activity Plan
07/01/2016 - 06/30/2018
EB1-21T
- ANO COMPONENT DESIGN BASIS INSPECTION
7
1, 2
IP
Component Design Bases Inspection
7111121
10/31/2016
12/02/2016
- LOADING INSPECTION (ONE WEEK IN MONTH)
1
1, 2
IP
Operation of an Independent Spent Fuel Storage Installation at Operating Plants
60855.1
12/01/2016
12/30/2016
CAL QTR1
- CAL CLOSURE INSPECTION QTR1
4
1, 2
IP
Followup On Corrective Actions For Violations And Deviations
92702
01/01/2017
03/31/2017
- RADIATION SAFETY
3
1, 2
IP
Radiological Hazard Assessment and Exposure Controls
03/13/2017
03/17/2017
1, 2
IP
In-Plant Airborne Radioactivity Control and Mitigation
03/13/2017
03/17/2017
1, 2
IP
Occupational Exposure Control Effectiveness
71151-OR01
03/13/2017
03/17/2017
1, 2
IP
RETS/ODCM Radiological Effluent Occurrences
71151-PR01
03/13/2017
03/17/2017
- INSERVICE INSPECTION 2R25
1
2
IP
Inservice Inspection Activities - PWR
7111108P
03/13/2017
03/23/2017
EB2-03
- LICENSE RENEWAL INSPECTION (PHASE 1)
2
2
IP
Post-Approval Site Inspection for License Renewal
71003
03/20/2017
03/24/2017
CAL QTR2
- CAL CLOSURE INSPECTION QTR2
4
1, 2
IP
Followup On Corrective Actions For Violations And Deviations
92702
04/01/2017
06/30/2017
TSB 52B
- BIENNIAL PI&R
4
1, 2
IP
Problem Identification and Resolution
05/01/2017
05/05/2017
1, 2
IP
Problem Identification and Resolution
05/15/2017
05/19/2017
CAL QTR3
- CAL CLOSURE INSPECTION QTR3
4
1, 2
IP
Followup On Corrective Actions For Violations And Deviations
92702
07/01/2017
09/30/2017
- BIENNIAL EP PROGRAM INSPECTION
1
1, 2
IP
Alert and Notification System Testing
7111402
07/10/2017
07/14/2017
1, 2
IP
Emergency Preparedness Organization Staffing and Augmentation System
7111403
07/10/2017
07/14/2017
1, 2
IP
Emergency Action Level and Emergency Plan Changes
7111404
07/10/2017
07/14/2017
1, 2
IP
Correction of Emergency Preparedness Weaknesses and Deficiencies
7111405
07/10/2017
07/14/2017
- EP PERFORMANCE INDICATOR VERIFICATION
1
1, 2
IP
Drill/Exercise Performance
71151-EP01
07/10/2017
07/14/2017
1, 2
IP
ERO Readiness
71151-EP02
07/10/2017
07/14/2017
1, 2
IP
Alert & Notification System Reliability
71151-EP03
07/10/2017
07/14/2017
EXAM
- INITIAL EXAM
5
1
INITIAL EXAM ANO UNIT 1-(05/18)
X02628
01/22/2018
01/26/2018
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Attachment 2 - Proposed Inspection Plan
Official Use Only - Sensitive Internal Information/Security-Related Information
Official Use Only - Sensitive Internal Information/Security-Related Information
Enclosure
Page 3 of 3
08/30/2016
09:31:17
Report 22
Unit
Number
Planned Dates
Start End
Inspection Activity
Title
No. of Staff
on Site
Arkansas Nuclear One
Inspection / Activity Plan
07/01/2016 - 06/30/2018
EXAM
- INITIAL EXAM
5
1
INITIAL EXAM ANO UNIT 1-(05/18)
X02628
02/26/2018
03/02/2018
CAL QTR4
- CAL CLOSURE INSPECTION QTR4
4
1, 2
IP
Followup On Corrective Actions For Violations And Deviations
92702
10/01/2017
12/31/2017
EB1-07T
- ANO HEAT SINK PERFORMANCE
1
1, 2
IP
Heat Sink Performance
7111107T
10/30/2017
11/03/2017
- RADIATION SAFETY
3
1, 2
IP
Occupational ALARA Planning and Controls
11/06/2017
11/10/2017
1, 2
IP
Occupational Dose Assessment
11/06/2017
11/10/2017
CAL QTR1
- CAL CLOSURE INSPECTION QTR1
4
1, 2
IP
Followup On Corrective Actions For Violations And Deviations
92702
01/01/2018
03/31/2018
EB2-03
- POST-APPROVAL LICENSE RENEWAL (TEAM)
4
2
IP
Post-Approval Site Inspection for License Renewal
71003
01/22/2018
01/26/2018
2
IP
Post-Approval Site Inspection for License Renewal
71003
02/05/2018
02/09/2018
CAL QTR2
- CAL CLOSURE INSPECTION QTR2
4
1, 2
IP
Followup On Corrective Actions For Violations And Deviations
92702
04/01/2018
06/30/2018
7111108
- INSERVICE INSPECTION 1R27
1
1
IP
Inservice Inspection Activities - PWR
7111108P
04/09/2018
04/20/2018
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Attachment 2 - Proposed Inspection Plan
Official Use Only - Sensitive Internal Information/Security-Related Information
Official Use Only - Sensitive Internal Information/Security-Related Information
Enclosure
SUNSI Review
By: CFO
Yes No
Publicly Available
Non-Publicly Available
Non-Sensitive
Sensitive
Keyword:
OFFICE: RIV
C: DRP/E
C: DRP/E
D: DRS
D: DRP
RIV/RA
NAME
JDixon
NOKeefe
AVegel
TWPruett
KKennedy
SIGNATURE
/RA/
/RA/
/RA/
/RA/
/RA/
DATE
8/18/16
8/18/16
8/18/16
8/22/16
8/24/16
Letter to Clay Warren from Kriss M. Kennedy dated August 31, 2016
SUBJECT:
MID-CYCLE ASSESSMENT LETTER FOR ARKANSAS NUCLEAR ONE,
UNITS 1 AND 2 (REPORT 05000313/2016005 AND 05000368/2016005)
DISTRIBUTION:
Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Scott.Morris@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
Senior Resident Inspector (Brian.Tindell@nrc.gov)
Resident Inspector (Margaret.Tobin@nrc.gov)
Resident Inspector (Andy.Barrett@nrc.gov)
Branch Chief, DRP/E (Neil.OKeefe@nrc.gov)
Senior Project Engineer, DRP/E (John.Dixon@nrc.gov)
Project Engineer, DRP/E (Brian.Correll@nrc.gov)
Project Engineer, DRP/E (Jackson.Choate@nrc.gov)
Administrative Assistant (Mary.Bennett@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (Stephen.Koenick@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
Director, DIRS, NRR (Chris.Miller@nrc.gov)
Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)
Director, DORL, NRR (Anne.Boland@nrc.gov)
Deputy Director, DORL, NRR (George.Wilson@nrc.gov)
Director, NSIR (Brian.Holian@nrc.gov)
Director, DPR, NSIR (Marissa.Bailey@nrc.gov)
DRP Branch Chiefs (R4DRPBC@nrc.gov)
DRS Branch Chiefs (R4DRSBC@nrc.gov)
ROPreports.Resource@nrc.gov
ROPassessment.Resource@nrc.gov
RidsOeMailCenter.Resource@nrc.gov