Mid-Cycle Assessment Letter for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2016005 and 05000368/2016005)
ML16237A412
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 08/31/2016
From: Kennedy K
NRC/RGN-IV/DRP/RPB-E
To: Warren C
Entergy Operations
O'Keefe C
References
IR 2016005
Download: ML16237A412 (8)


See also: IR 05000313/2016005

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E LAMAR BLVD

ARLINGTON, TX 76011-4511

August 31, 2016

Clay Warren, Acting Site Vice President

Arkansas Nuclear One

Entergy Operations, Inc.

1448 SR 333

Russellville, AR 72802-0967

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR ARKANSAS NUCLEAR ONE,

UNITS 1 AND 2 (REPORT 05000313/2016005 AND 05000368/2016005)

Dear Mr. Warren:

On August 11, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle

performance review of Arkansas Nuclear One (ANO), Units 1 and 2. The NRC reviewed the

most recent quarterly performance indicators (PIs) in addition to inspection results and

enforcement actions from July 1, 2015, through June 30, 2016. This letter informs you of the

NRCs assessment of your facility during this period and its plans for future inspections at your

facility.

The NRC determined the performance at ANO, Units 1 and 2 during the most recent quarter

remained within the Multiple/Repetitive Degraded Cornerstone Column of the NRCs Reactor

Oversight Process (ROP) Action Matrix. On March 4, 2015, ANO Units 1 and 2 transitioned to

the Multiple/Repetitive Degraded Cornerstone Column (Column 4) of the ROP Action Matrix as

a result of having one Yellow finding in each unit involving the failure to adequately approve the

design and to load test a temporary lift assembly, and one Yellow finding in each unit involving

the failure to design, construct, and maintain plant design features required to protect safety-

related equipment from the effects of flooding.

On June 9, 2016, the NRC completed a supplemental inspection and independent review of the

causes for declining safety performance at ANO, as well as corrective actions taken and

planned to sustain improvement efforts. The NRC inspection team determined that ANO,

Units 1 and 2 are being operated safely and Entergy Operations, Inc. (EOI) understands the

depth and breadth of performance concerns associated with ANOs performance decline. The

NRC team concluded that effective implementation of the licensees Comprehensive Recovery

Plan (CRP), supported by the allocation of adequate resources and continued enhanced

oversight by EOI leadership, should lead to substantial and sustained performance

improvement. The NRC team identified missed opportunities for ANO to have promptly initiated

performance improvements since being placed in Column 4. The NRC team also concluded

that your evaluations and corrective actions for three unplanned, Unit 2 scrams that contributed

to a White Unplanned Scrams per 7000 Critical Hours PI, were satisfactory. Based on the

C. Warren

- 2 -

results of this inspection, the White PI was closed. The results of the inspection were

documented in NRC Inspection Report 05000313/2016007 and 05000368/2016007

(ML16161B279).

In a letter dated May 17, 2016, ANO Comprehensive Recovery Plan (ML16139A059), EOI

notified the NRC staff of its plan to perform specific actions to resolve the causes for declining

performance at ANO. On June 17, 2016, the NRC issued a Confirmatory Action Letter

(ML16169A193) which confirmed EOI commitments to take specific actions included in the

ANO Comprehensive Recovery Plan. The Confirmatory Action Letter groups these actions in

six categories:

Significant performance deficiencies (i.e., actions to address the two Yellow findings)

Identification, assessment and correction of performance deficiencies

Human performance

Equipment reliability and engineering programs

Safety culture

Service water self-assessment

The NRC plans to conduct quarterly inspections to review your progress toward completing the

ANO Comprehensive Recovery Plan actions that are identified in the Confirmatory Action Letter.

The NRC will use Inspection Procedure 92702, Follow-up on Traditional Enforcement Actions

Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, and

Alternative Dispute Resolution Confirmatory Orders, to assess your effectiveness in completing

corrective actions. The results of these inspections will provide information for future

performance assessments of ANO in accordance with NRC Inspection Manual Chapter 0305,

Operating Reactor Assessment Program.

The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine

inspections performed by resident inspectors are not included in the inspection plan. The

inspections listed during the second half of the inspection plan are tentative and may be revised

at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the

resolution of any scheduling conflicts and personnel availability issues. The NRC will contact

you as soon as possible to discuss changes to the inspection plan should circumstances

warrant any changes. This inspection plan does not include security related inspections, which

will be sent via separate, non-publicly available correspondence.

In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order

Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-

Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to

Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts

towards compliance with these Orders, and the information gathered will aid staff in

development of the ultimate Safety Evaluation for the site. After the NRC staff receives the

Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff

will confirm through inspections the full implementation of the orders mentioned above by

performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies

and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness

Communication/Staffing/Multi-Unit Dose Assessment Plans.

C. Warren

- 3 -

In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the

Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the

NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning

in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue

to conduct quarterly assessment meetings and communicate changes in the assessment of

licensee performance in accordance with the guidance in Inspection Manual Chapter 0305,

Operating Reactor Assessment Program.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs

Rules of Practice, a copy of this letter will be available electronically for public inspection in the

NRC Public Document Room or from the Publicly Available Records (PARS) component of

NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public

Electronic Reading Room).

Please contact Mr. Neil OKeefe at 817-200-1574 with any questions you have regarding this

letter.

Sincerely,

/RA/

Kriss M. Kennedy

Regional Administrator

Docket Nos.

50-313, 50-368

License Nos. DPR-51, NPF-6

Enclosure:

Arkansas Nuclear One Units 1 and 2

Inspection/Activity Plan

Page 1 of 3

08/30/2016

09:31:17

Report 22

Unit

Number

Planned Dates

Start End

Inspection Activity

Title

No. of Staff

on Site

Arkansas Nuclear One

Inspection / Activity Plan

07/01/2016 - 06/30/2018

EXAM

- INITIAL EXAM ANO U1

6

1

INITIAL EXAM ANO UNIT 1 (08/2016)

X02568

07/25/2016

07/29/2016

1

INITIAL EXAM ANO UNIT 1 (08/2016)

X02568

08/22/2016

09/02/2016

RS 5678

- RADIATION SAFETY - TEAM

4

1, 2

IP

Radiation Monitoring Instrumentation

71124.05

06/27/2016

07/01/2016

1, 2

IP

Radioactive Gaseous and Liquid Effluent Treatment

71124.06

06/27/2016

07/01/2016

1, 2

IP

Radiological Environmental Monitoring Program

71124.07

06/27/2016

07/01/2016

1, 2

IP

Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation

71124.08

06/27/2016

07/01/2016

TSB 52B

- BIENNIAL PI&R INSPECTION

5

1, 2

IP

Problem Identification and Resolution

71152B

08/29/2016

09/02/2016

1, 2

IP

Followup On Corrective Actions For Violations And Deviations

92702

08/29/2016

09/02/2016

1, 2

IP

Problem Identification and Resolution

71152B

09/12/2016

09/16/2016

INSP

- BIENNIAL REQUAL INSPECTION U1

2

1

IP

Licensed Operator Requalification Program

7111111B

07/11/2016

07/15/2016

INSP

- BIENNIAL REQUAL INSPECTION U2

2

2

IP

Licensed Operator Requalification Program

7111111B

07/11/2016

07/15/2016

EP-2

- EP PERFORMANCE INDICATORS

2

1

IP

Drill/Exercise Performance

71151-EP01

08/15/2016

08/19/2016

1

IP

ERO Readiness

71151-EP02

08/15/2016

08/19/2016

1

IP

Alert & Notification System Reliability

71151-EP03

08/15/2016

08/19/2016

EP-3

- BIENNIAL EP EXERCISE INSPECTION

4

1, 2

IP

Exercise Evaluation

7111401

08/15/2016

08/19/2016

1, 2

IP

Emergency Action Level and Emergency Plan Changes

7111404

08/15/2016

08/19/2016

EXAM

- INITIAL EXAM U2

6

2

INITIAL EXAM ANO UNIT 2 (02/2017)

X02585

01/09/2017

01/13/2017

2

INITIAL EXAM ANO UNIT 2 (02/2017)

X02585

02/13/2017

02/17/2017

71111.08

- INSERVICE INSPECTION 1R26

1

1

IP

Inservice Inspection Activities - PWR

7111108P

09/26/2016

10/07/2016

RS 12 PI

- RADIATION SAFETY

2

1, 2

IP

Radiological Hazard Assessment and Exposure Controls

71124.01

10/03/2016

10/07/2016

1, 2

IP

Occupational ALARA Planning and Controls

71124.02

10/03/2016

10/07/2016

1, 2

IP

Occupational Exposure Control Effectiveness

71151-OR01

10/03/2016

10/07/2016

1, 2

IP

RETS/ODCM Radiological Effluent Occurrences

71151-PR01

10/03/2016

10/07/2016

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Attachment 2 - Proposed Inspection Plan

Official Use Only - Sensitive Internal Information/Security-Related Information

ANO

Official Use Only - Sensitive Internal Information/Security-Related Information

Enclosure

Page 2 of 3

08/30/2016

09:31:17

Report 22

Unit

Number

Planned Dates

Start End

Inspection Activity

Title

No. of Staff

on Site

Arkansas Nuclear One

Inspection / Activity Plan

07/01/2016 - 06/30/2018

EB1-21T

- ANO COMPONENT DESIGN BASIS INSPECTION

7

1, 2

IP

Component Design Bases Inspection

7111121

10/31/2016

12/02/2016

ISFSI

- LOADING INSPECTION (ONE WEEK IN MONTH)

1

1, 2

IP

Operation of an Independent Spent Fuel Storage Installation at Operating Plants

60855.1

12/01/2016

12/30/2016

CAL QTR1

- CAL CLOSURE INSPECTION QTR1

4

1, 2

IP

Followup On Corrective Actions For Violations And Deviations

92702

01/01/2017

03/31/2017

RS 13 PI

- RADIATION SAFETY

3

1, 2

IP

Radiological Hazard Assessment and Exposure Controls

71124.01

03/13/2017

03/17/2017

1, 2

IP

In-Plant Airborne Radioactivity Control and Mitigation

71124.03

03/13/2017

03/17/2017

1, 2

IP

Occupational Exposure Control Effectiveness

71151-OR01

03/13/2017

03/17/2017

1, 2

IP

RETS/ODCM Radiological Effluent Occurrences

71151-PR01

03/13/2017

03/17/2017

71111.08

- INSERVICE INSPECTION 2R25

1

2

IP

Inservice Inspection Activities - PWR

7111108P

03/13/2017

03/23/2017

EB2-03

- LICENSE RENEWAL INSPECTION (PHASE 1)

2

2

IP

Post-Approval Site Inspection for License Renewal

71003

03/20/2017

03/24/2017

CAL QTR2

- CAL CLOSURE INSPECTION QTR2

4

1, 2

IP

Followup On Corrective Actions For Violations And Deviations

92702

04/01/2017

06/30/2017

TSB 52B

- BIENNIAL PI&R

4

1, 2

IP

Problem Identification and Resolution

71152

05/01/2017

05/05/2017

1, 2

IP

Problem Identification and Resolution

71152

05/15/2017

05/19/2017

CAL QTR3

- CAL CLOSURE INSPECTION QTR3

4

1, 2

IP

Followup On Corrective Actions For Violations And Deviations

92702

07/01/2017

09/30/2017

EP-1

- BIENNIAL EP PROGRAM INSPECTION

1

1, 2

IP

Alert and Notification System Testing

7111402

07/10/2017

07/14/2017

1, 2

IP

Emergency Preparedness Organization Staffing and Augmentation System

7111403

07/10/2017

07/14/2017

1, 2

IP

Emergency Action Level and Emergency Plan Changes

7111404

07/10/2017

07/14/2017

1, 2

IP

Correction of Emergency Preparedness Weaknesses and Deficiencies

7111405

07/10/2017

07/14/2017

EP-2

- EP PERFORMANCE INDICATOR VERIFICATION

1

1, 2

IP

Drill/Exercise Performance

71151-EP01

07/10/2017

07/14/2017

1, 2

IP

ERO Readiness

71151-EP02

07/10/2017

07/14/2017

1, 2

IP

Alert & Notification System Reliability

71151-EP03

07/10/2017

07/14/2017

EXAM

- INITIAL EXAM

5

1

INITIAL EXAM ANO UNIT 1-(05/18)

X02628

01/22/2018

01/26/2018

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Attachment 2 - Proposed Inspection Plan

Official Use Only - Sensitive Internal Information/Security-Related Information

ANO

Official Use Only - Sensitive Internal Information/Security-Related Information

Enclosure

Page 3 of 3

08/30/2016

09:31:17

Report 22

Unit

Number

Planned Dates

Start End

Inspection Activity

Title

No. of Staff

on Site

Arkansas Nuclear One

Inspection / Activity Plan

07/01/2016 - 06/30/2018

EXAM

- INITIAL EXAM

5

1

INITIAL EXAM ANO UNIT 1-(05/18)

X02628

02/26/2018

03/02/2018

CAL QTR4

- CAL CLOSURE INSPECTION QTR4

4

1, 2

IP

Followup On Corrective Actions For Violations And Deviations

92702

10/01/2017

12/31/2017

EB1-07T

- ANO HEAT SINK PERFORMANCE

1

1, 2

IP

Heat Sink Performance

7111107T

10/30/2017

11/03/2017

RS 24

- RADIATION SAFETY

3

1, 2

IP

Occupational ALARA Planning and Controls

71124.02

11/06/2017

11/10/2017

1, 2

IP

Occupational Dose Assessment

71124.04

11/06/2017

11/10/2017

CAL QTR1

- CAL CLOSURE INSPECTION QTR1

4

1, 2

IP

Followup On Corrective Actions For Violations And Deviations

92702

01/01/2018

03/31/2018

EB2-03

- POST-APPROVAL LICENSE RENEWAL (TEAM)

4

2

IP

Post-Approval Site Inspection for License Renewal

71003

01/22/2018

01/26/2018

2

IP

Post-Approval Site Inspection for License Renewal

71003

02/05/2018

02/09/2018

CAL QTR2

- CAL CLOSURE INSPECTION QTR2

4

1, 2

IP

Followup On Corrective Actions For Violations And Deviations

92702

04/01/2018

06/30/2018

7111108

- INSERVICE INSPECTION 1R27

1

1

IP

Inservice Inspection Activities - PWR

7111108P

04/09/2018

04/20/2018

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Attachment 2 - Proposed Inspection Plan

Official Use Only - Sensitive Internal Information/Security-Related Information

ANO

Official Use Only - Sensitive Internal Information/Security-Related Information

Enclosure

ML16237A412

SUNSI Review

By: CFO

ADAMS

Yes No

Publicly Available

Non-Publicly Available

Non-Sensitive

Sensitive

Keyword:

NRC-002

OFFICE: RIV

C: DRP/E

C: DRP/E

D: DRS

D: DRP

RIV/RA

NAME

JDixon

NOKeefe

AVegel

TWPruett

KKennedy

SIGNATURE

/RA/

/RA/

/RA/

/RA/

/RA/

DATE

8/18/16

8/18/16

8/18/16

8/22/16

8/24/16

Letter to Clay Warren from Kriss M. Kennedy dated August 31, 2016

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR ARKANSAS NUCLEAR ONE,

UNITS 1 AND 2 (REPORT 05000313/2016005 AND 05000368/2016005)

DISTRIBUTION:

Regional Administrator (Kriss.Kennedy@nrc.gov)

Deputy Regional Administrator (Scott.Morris@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

Senior Resident Inspector (Brian.Tindell@nrc.gov)

Resident Inspector (Margaret.Tobin@nrc.gov)

Resident Inspector (Andy.Barrett@nrc.gov)

Branch Chief, DRP/E (Neil.OKeefe@nrc.gov)

Senior Project Engineer, DRP/E (John.Dixon@nrc.gov)

Project Engineer, DRP/E (Brian.Correll@nrc.gov)

Project Engineer, DRP/E (Jackson.Choate@nrc.gov)

Administrative Assistant (Mary.Bennett@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (Stephen.Koenick@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)

Director, DIRS, NRR (Chris.Miller@nrc.gov)

Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)

Director, DORL, NRR (Anne.Boland@nrc.gov)

Deputy Director, DORL, NRR (George.Wilson@nrc.gov)

Director, NSIR (Brian.Holian@nrc.gov)

Director, DPR, NSIR (Marissa.Bailey@nrc.gov)

DRP Branch Chiefs (R4DRPBC@nrc.gov)

DRS Branch Chiefs (R4DRSBC@nrc.gov)

ROPreports.Resource@nrc.gov

ROPassessment.Resource@nrc.gov

RidsOeMailCenter.Resource@nrc.gov