ANO Mid-Cycle Inspection Plan Transmittal Letter 2021
ML21232A223
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 09/01/2021
From: John Dixon
NRC/RGN-IV/DRP/RPB-D
To: Dinelli J
Entergy Operations
References
IR 2021005
Download: ML21232A223 (7)


Text

September 1, 2021 Mr. John Dinelli, Site Vice President Arkansas Nuclear One Entergy Operations, Inc.

N-TSB-58 1448 S.R. 333 Russellville, AR 72802-0967

SUBJECT:

UPDATED INSPECTION PLAN FOR ARKANSAS NUCLEAR ONE - UNITS 1 AND 2 (REPORT 05000313/2021005 AND 05000368/2021005)

Dear Mr. Dinelli:

The enclosed inspection plan lists the inspections scheduled through June 30, 2023, for Arkansas Nuclear One (ANO). The U.S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

Inspection Procedure (IP) 71111.21N.03 is included in the inspection plan as a placeholder for your next Design Basis Assurance Inspection (Programs). The NRC is still determining the specific technical area to replace the previously performed power-operated valves programs inspection, IP 71111.21N.02. Once the inspection area has been determined, an inspection procedure will be issued publicly at least six months prior to the start of this inspection.

In response to the COVID-19 public health emergency (PHE), the NRC is adjusting inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the Reactor Oversight Process (ROP). Each planned inspection is being carefully reviewed in order to determine if any portions of the inspection can be performed remotely, determine how best to perform on-site portions to minimize personnel health risks, and adjust inspection schedules if needed. This is done in accordance with guidance contained in the February 1, 2021 memo, Calendar Year 2021 Inspection Guidance During COVID-19 Telework Restrictions located in the NRCs Agencywide Documents Access and Management System (ADAMS) (ADAMS Accession No. ML21027A274). For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here: https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs

J. Dinelli 2 important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.

The NRC will also be performing baseline inspections of licensee cyber security programs. The specific schedule and procedure to be used for these inspections is being developed by the NRC staff. The staff expects to communicate the schedule for these inspections to each utility separately.

The Regional Administrator has approved the staffs plan to conduct Inspection Procedure 71003, Post-Approval Site Inspection for License Renewal, at your facility, Unit 1, as indicated in the enclosed inspection plan.

On March 12, 2018, the NRC issued a Confirmatory Order (ADAMS Accession No. ML18072A191) (EA-17-132 and EA-17-153) to the Entergy fleet that included ANO. The Regional Administrator has approved the staffs plan to conduct follow-up inspection of Entergys implementation of actions required by the Confirmatory Order actions in accordance with Inspection Procedure 92702, Followup on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, And Alternative Dispute Resolution Confirmatory Orders. The NRC will continue to coordinate with Entergy regarding this inspection, which is currently in progress.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (817) 200-1574 with any questions you have regarding this letter.

Sincerely, John L. Digitally signed by John L. Dixon Dixon Date: 2021.09.01 08:38:37 -05'00' John L. Dixon, Jr., Chief Reactor Projects Branch D Division of Reactor Projects Docket Nos. 05000313 and 05000368 License Nos. DPR-51 and NPF-6

Enclosure:

Inspection Plan cc w/ encl: Distribution via LISTSERV

ML21232A223 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: ASanchez Yes No Publicly Available Sensitive NRC-002 OFFICE SPE: DRP/D BC: DRP/D NAME ASanchez JDixon SIGNATURE AAS JLDJ DATE 08/18/2021 09/01/2021 IP 22b Site Inspection Activity Plan 07200013 - ANO 07/01/2021 - 06/30/2023 Unit Start End Activity CAC Title Staff Count ANO ISFSI Triennial Loading Inspection (1 week in April)(Part 72) 2 1 4/1/2022 4/30/2022 IP 60855 001001 Operation Of An ISFSI Prepared on 8/18/2021 1:40:36 PM 1 of 4

IP 22b Site Inspection Activity Plan Arkansas Nuclear One 07/01/2021 - 06/30/2023 Unit Start End Activity CAC Title Staff Count Security FFD .08 1 1, 2 7/19/2021 7/23/2021 IP 71130.08 000740 Fitness For Duty Program FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - ANO 6 1, 2 8/2/2021 8/6/2021 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1, 2 8/23/2021 8/27/2021 IP 71130.03 000735 Contingency Response - Force-On-Force Testing RP 2,4 2 1, 2 8/30/2021 9/3/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 8/30/2021 9/3/2021 IP 71124.04 000728 Occupational Dose Assessment Biennial PI&R Inspection 4 1, 2 11/1/2021 11/5/2021 IP 71152B 000747 Problem Identification and Resolution 1, 2 11/15/2021 11/19/2021 IP 71152B 000747 Problem Identification and Resolution Phase 4 71003 Inspection 2 1 12/5/2021 12/11/2021 IP 71003 000687 Post-Approval Site Inspection for License Renewal Security Protective Strategy .05 2 1, 2 1/24/2022 1/28/2022 IP 71130.05 000737 Protective Strategy Evaluation Fire Protection Inspection - ANO 3 1, 2 1/31/2022 2/4/2022 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI) 1, 2 2/14/2022 2/18/2022 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

ANO UNIT 1 2022 INITIAL EXAM 6 1 2/27/2022 3/5/2022 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV) 1 4/3/2022 4/9/2022 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

ANO ISFSI Triennial Loading Inspection (Part 50) Feeder for Residents 2 1, 2 4/1/2022 4/2/2022 IP 60855 001001 Operation Of An ISFSI 10 CFR 50.59 Inspection - 17T - Arkansas Nuclear 3 1, 2 5/16/2022 5/20/2022 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments Security Training/Equip Maint .07 and .04 2 1, 2 5/16/2022 5/20/2022 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1, 2 5/16/2022 5/20/2022 IP 71130.07 000739 Security Training In-Office 2022 EP Exercise Scenario Review - ANO 4 1, 2 6/1/2022 7/11/2022 IP 71114.08 000723 Exercise Evaluation  Scenario Review ANO UNIT 2 2022 BRQ 3 2 6/19/2022 6/25/2022 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Prepared on 8/18/2021 1:40:36 PM 2 of 4

IP 22b Site Inspection Activity Plan RP 5,8 2 1, 2 6/27/2022 7/1/2022 IP 71124.05 000729 Radiation Monitoring Instrumentation 1, 2 6/27/2022 7/1/2022 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation EP 2022 Biennial Exercise & PI Inspection - ANO 4 1, 2 8/8/2022 8/12/2022 IP 71114.01 000716 Exercise Evaluation 1, 2 8/8/2022 8/12/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 8/8/2022 8/12/2022 IP 71151 001397 Performance Indicator Verification Heat Exchanger/Sink Performance Inspection - 07T - Arkansas Nuclear 2 1, 2 8/22/2022 8/26/2022 IP 71111.07T 000700 Heat Sink Performance Security Access Control .02 1 1, 2 9/11/2022 10/28/2022 IP 71130.09 001656 Security Plan Changes 1, 2 9/12/2022 9/16/2022 IP 71130.02 000734 Access Control 1, 2 9/12/2022 9/16/2022 IP 71151 001338 Performance Indicator Verification Inservice Inspection 1RF30 - ANO 1 1 10/10/2022 10/21/2022 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP 1,2,PI 2 1, 2 10/17/2022 10/21/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 10/17/2022 10/21/2022 IP 71124.02 000726 Occupational ALARA Planning and Controls Design Bases Assurance Inspection (Program) - 21N - Arkansas Nuclear 3 1, 2 1/1/2023 6/30/2023 IP 71111.21N.03 Design Bases Assurance Inspections (Programs) 2023 Cyber Security Inspection - ANO 4 1, 2 2/6/2023 2/9/2023 IP 71130.10P 000741 Cyber Security ANO UNIT 2 2023 INITIAL EXAM 4 2 1/29/2023 2/4/2023 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV) 2 3/5/2023 3/11/2023 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

Inservice Inspection 2R29 - ANO 1 2 3/20/2023 3/31/2023 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP 1,3,PI 2 1, 2 3/27/2023 3/31/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 3/27/2023 3/31/2023 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation Security Access Authorization .01 - Access Control .02 + PIV + Plan Change .09 2 1, 2 6/5/2023 6/9/2023 IP 71130.01 000733 Access Authorization 1, 2 6/5/2023 6/9/2023 IP 71130.02 000734 Access Control 1, 2 6/5/2023 6/9/2023 IP 71130.09 001656 Security Plan Changes 1, 2 6/5/2023 6/9/2023 IP 71151 001338 Performance Indicator Verification Prepared on 8/18/2021 1:40:36 PM 3 of 4

IP 22b Site Inspection Activity Plan RP 6,7 2 1, 2 6/12/2023 6/16/2023 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 6/12/2023 6/16/2023 IP 71124.07 000731 Radiological Environmental Monitoring Program Prepared on 8/18/2021 1:40:36 PM 4 of 4