Notification of NRC Evaluations of Changes, Tests and Experiments Inspection (05000313/2022002 and 05000368/20220020 and Request for Information
ML22075A205
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 03/31/2022
From: Vincent Gaddy
NRC/RGN-IV/DORS/EB1
To: Sullivan J
Entergy Operations
References
IR 2022002
Download: ML22075A205 (5)


See also: IR 05000313/2022002

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD.

ARLINGTON, TX 76011-4511

March 31, 2022

Mr. Joe Sullivan, Site Vice President

Arkansas Nuclear One

Entergy Operations, Inc.

N-TSB-58

1448 S.R. 333

Russellville, AR 72802-0967

SUBJECT: ARKANSAS NUCLEAR ONE - NOTIFICATION OF NRC EVALUATIONS OF

CHANGES, TESTS AND EXPERIMENTS INSPECTION (05000313/2022002

AND 05000368/2022002) AND REQUEST FOR INFORMATION

Dear Mr. Sullivan:

The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff

will conduct the baseline inspection of changes, tests and experiments at your Arkansas

Nuclear One site from May 16 to May 20, 2022. The inspection will consist of three reactor

inspectors from the NRCs Region IV office for one week. The inspection will be conducted in

accordance with NRC Inspection Procedure 71111.17T, Evaluations of Changes, Tests and

Experiments, dated December 8, 2016.

Experience has shown that this inspection is resource intensive for both the NRC inspectors

and your staff. To minimize the impact to your onsite resources and to ensure a productive

inspection, we have enclosed a request for information needed for this inspection. Please note

that the documents are requested to be provided by May 2, 2022. Upon review of these

documents, the inspectors will select additional documentation for review upon arrival. It is

important that all documents are up-to-date and complete in order to minimize the number of

additional documents requested during the preparation and/or the onsite portions of the

inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Michael Hall of your Licensing organization.

If there are any questions about this inspection or the material requested, please contact the

lead inspector, Wayne Sifre, by telephone at 817-200-1193 or by e-mail at

Wayne.Sifre@nrc.gov.

PAPERWORK REDUCTION ACT STATEMENT

This letter contains mandatory information collections that are subject to the Paperwork

Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)

approved these information collections (approval number 3150-0011). Send comments

regarding this information collection to the Information Services Branch, Office of the Chief

Information Officer, Mail Stop: T6 A10M, U.S. Nuclear Regulatory Commission, Washington,

DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the

J.Sullivan 2

Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of

Management and Budget, Washington, DC 20503.

PUBLIC PROTECTION NOTIFICATION

The NRC may not conduct nor sponsor, and a person is not required to respond to, a request

for information or an information collection requirement unless the requesting document

displays a currently valid OMB control number.

This letter, its enclosure, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document

Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public

Inspections, Exemptions, Requests for Withholding.

Sincerely,

Vincent G. Digitally signed by Vincent G.

Gaddy

Gaddy Date: 2022.03.31 09:04:18

-05'00'

Vincent G. Gaddy, Chief

Engineering Branch 1

Division of Operating Reactor Safety

Docket No(s). 50-313; 50-368

License No(s). DPR-51; NPF-6

Enclosure:

Request for Information

Cc w/ encl: Distribution via LISTSERV

ML22075A205

SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: WCS Yes No Publicly Available Sensitive NRC-002

OFFICE DORS/EB1 DORS/EB1

NAME VGaddy WSifre

SIGNATURE /RA/ /RA/

DATE 3/21/2022 3/22/2022

Request for Information

Evaluations of Changes, Tests and Experiments Inspection

Arkansas Nuclear One

Inspection Report: 05000313/2022002; 05000368/2022002

Inspection Dates: May 16 - 20, 2022

Inspection Procedure: IP 71111.17T, Evaluations of Changes, Tests and Experiments

Lead Inspector: Wayne Sifre, Senior Reactor Inspector

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or electronic

format (preferred) by May 2, 2022 to the attention of Wayne Sifre. We request that you

categorize the documents in your response with the numbered list below. If only hard copies of

the requested documents are available or if the electronic format is too large, please inform the

lead inspector and provide the documents on the first day of the onsite inspection. Also, the

inspectors will select specific items from the information requested below and request from your

staff additional documents needed during the onsite inspection weeks. We ask that the specific

items requested be available and ready for review on the first day of inspection. If you have any

questions regarding this information request, please contact the lead inspector as soon as

possible.

1. A copy of any procedures for conducting 10 CFR 50.59 applicability determinations,

screenings, and evaluations and any other 10 CFR 50.59 program-related documents.

These documents, for example, may include procedures for implementation of alternate

processes or screening criteria such as for replacement part evaluations, design

equivalent changes, long-term configuration control, etc.

2. A list with descriptions of all 10 CFR 50.59 applicability determinations of fully

implemented changes, tests and experiments performed since the last triennial 10 CFR

50.59 inspection that did not result in a screening.

3. A list with descriptions of all 10 CFR 50.59 screenings of fully implemented changes,

tests and experiments performed since the last triennial 10 CFR 50.59 inspection that

did not result in an evaluation.

4. A list with descriptions of all 10 CFR 50.59 evaluations of fully implemented changes,

tests and experiments performed since the last triennial 10 CFR 50.59 inspection that

did not result in an application for a license amendment.

5. A list with descriptions of all fully implemented changes, tests and experiments where an

alternate process or screening criteria was applied since the last triennial 10 CFR 50.59

inspection.

Enclosure

6. A list with descriptions of all temporary plant modifications implemented since the last

triennial 10 CFR 50.59 inspection. Please note whether these temporary modifications

remain in effect.

7. A list with descriptions of all compensatory actions for degraded or non-conforming

conditions implemented since the last triennial 10 CFR 50.59 inspection.

8. A list with descriptions of all normal, abnormal, and emergency operating procedure

changes implemented since the last triennial 10 CFR 50.59 inspection.

9. A list with descriptions of all corrective action documents related to 10 CFR 50.59

applicability determinations, screenings, and evaluations since the last triennial 10 CFR

50.59 inspection.

10. A list including qualification dates of personnel qualified to prepare, review, or approve

10 CFR 50.59 applicability determinations, screenings, and evaluations.

11. A copy of the current updated final safety analysis report, technical specifications, and

technical specification bases.

12. A copy of any self-assessments or audits performed of 10 CFR 50.59 programs since

the last triennial 10 CFR 50.59 inspection.

13. A copy of the most recent submittal of the report containing a brief description of any

changes, tests and experiments, including a summary of the evaluation of each, required

by 10 CFR 50.59(d)(2).

14. A list of systems and system designators and a set of one-line (i.e., simplified) system

diagrams.

Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can

determine the safety and/or risk significance of the screenings, evaluations, and modifications.

Inspector Contact Information:

Wayne Sifre Wes Cullum Dustin Reinert

Senior Reactor Inspector Reactor Inspector Reactor Inspector

817-200-1193 817-200-1563 817-200-1534

Wayne.Sifre@nrc.gov Wes.Cullum@nrc.gov Dustin.Reinert@nrc.gov

Mailing Address:

U.S. NRC, Region IV

Attn: Wayne Sifre

1600 East Lamar Blvd.

Arlington, TX 76011-4125

2