IR 05000313/2019006

From kanterella
Jump to navigation Jump to search
Annual Assessment Letter for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2019006 and 05000368/2019006)
ML20055E100
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 03/03/2020
From: John Dixon
NRC/RGN-IV/DRP/RPB-D
To: Dinelli J
Entergy Operations
References
Download: ML20055E100 (5)


Text

March 3, 2020

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 (REPORT 05000313/2019006 AND 05000368/2019006)

Dear Mr. Dinelli:

The U.S. Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Arkansas Nuclear One, Units 1 and 2, reviewing performance indicators, inspection results, and enforcement actions from January 1, 2019, through December 31, 2019.

This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at Arkansas Nuclear One, Units 1 and 2, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green) and all performance indicators were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2021.

This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections), and other changes to the baseline inspection program described in SECY-19-0067, Recommendations for Enhancing the Reactor Oversight Process. Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. Additionally, during this period the NRC will schedule an additional inspection per a revised version of Temporary Instruction (TI) 2515/194, Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerability in Electrical Power Systems (NRC Bulletin 2012-01) for any sites who elect to implement the guidance of the Industry Initiative on Open Phase Condition, Revision 3 (Agency Documents Access and Management System (ADAMS) Accession No. ML19163A176). Licensees will be individually notified when the NRC schedules these inspections.

On March 12, 2018, the NRC issued a Confirmatory Order (ADAMS Accession No. ML18072A191) (EA-17-132 and EA-17-153) to the Entergy fleet that included Arkansas Nuclear One, Units 1 and 2. On January 27, 2020, the NRC initiated a Confirmatory Order follow-up inspection at Entergy Corporate Headquarters in Jackson, MS, of the Confirmatory Order actions required to be completed by the end of calendar year 2019, in accordance with Inspection Procedure 92702, Follow-up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, And Alternative Dispute Resolution Confirmatory Orders. The results of this inspection, which are currently being evaluated, will be documented in NRC Inspection Report 05000416/2020011, 05000313/2020010, and 05000368/2020010, 05000458/2020010, and 05000382/2020011.

The NRC plans to conduct future follow-up inspections of the remaining open Confirmatory Order actions required to be completed by Entergy. The NRC will coordinate with Entergy to schedule these inspection activities.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (817) 200-1574 with any questions you have regarding this letter.

Sincerely,

/RA/

John L. Dixon, Jr., Chief Reactor Projects Branch D Division of Reactor Projects Docket Nos. 05000313 and 05000368 License Nos. DPR-51 and NPF-6 Enclosure:

Inspection Plan cc w/ encl: Distribution via LISTSERV

IP 22 Inspection Activity Plan Report Arkansas Nuclear One 01/01/2020 - 12/31/2021 Unit Start End Activity CAC Title Staff Count ANO ENTERGY CO FOLLOWUP - 2 2 1, 2 12/01/2019 03/31/2020 IP 92702 CONF 001581 Enforcement Related Order Follow-Up-Only ANO 2020 INITIAL EXAM (UNIT 1) 6 1 03/01/2020 03/07/2020 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1 03/29/2020 04/04/2020 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

Inservice Inspection 2RF27 - ANO 1 2 03/23/2020 04/03/2020 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RS 12PI Radiation Safety 2 1, 2 03/23/2020 03/27/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 03/23/2020 03/27/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls Security Access Control .02 1 1, 2 05/11/2020 05/15/2020 IP 71130.02 000734 Access Control 1, 2 05/11/2020 05/15/2020 IP 71151 001338 Performance Indicator Verification Arkansas Nuclear 1, 2 - Powered Operated Valves Inspection 3 1, 2 06/08/2020 06/12/2020 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements 1, 2 06/22/2020 06/26/2020 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements RS5678 Radiation Safety PS Team 4 1, 2 06/15/2020 06/19/2020 IP 71124.05 000729 Radiation Monitoring Instrumentation 1, 2 06/15/2020 06/19/2020 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 06/15/2020 06/19/2020 IP 71124.07 000731 Radiological Environmental Monitoring Program 1, 2 06/15/2020 06/19/2020 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation MC&A - Material Control & Accounting 1 1, 2 06/15/2020 06/19/2020 IP 71130.11 000742 Material Control and Accounting (MC&A)

ANO 2020 BRQ (Unit 2) 2 2 07/05/2020 07/11/2020 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance EP Exercise and PI Inspection 4 1, 2 09/14/2020 09/18/2020 IP 71114.01 000716 Exercise Evaluation This report does not include INPO and OUTAGE activities. Page 1 of 3 This report shows only on-site and announced inspection procedures.

2/19/2020 11:25:48 AM

IP 22 Inspection Activity Plan Report Arkansas Nuclear One 01/01/2020 - 12/31/2021 Unit Start End Activity CAC Title Staff Count EP Exercise and PI Inspection 4 1, 2 09/14/2020 09/18/2020 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 09/14/2020 09/18/2020 IP 71151 001397 Performance Indicator Verification Security Equipment .04 and Training .07 2 1, 2 10/05/2020 10/09/2020 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1, 2 10/05/2020 10/09/2020 IP 71130.07 000739 Security Training ANO UNIT 2 2021 INITIAL EXAM 7 2 02/28/2021 03/06/2021 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

2 03/28/2021 04/03/2021 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

Security Access Auth .01 and Access Control .02 w/PIV 2 1, 2 03/08/2021 03/12/2021 IP 71130.01 000733 Access Authorization 1, 2 03/08/2021 03/12/2021 IP 71130.02 000734 Access Control 1, 2 03/08/2021 03/12/2021 IP 71151 001338 Performance Indicator Verification Inservice Inspection 1RF29 - ANO 1 1 04/12/2021 04/23/2021 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP 1,3,PI 2 1, 2 04/19/2021 04/23/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 04/19/2021 04/23/2021 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation Design Bases Assurance (Teams) 21M - ANO 6 1, 2 06/14/2021 07/02/2021 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

ANO1 2021 BRQ 2 1 06/27/2021 07/03/2021 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Security FFD .08 1 1, 2 07/19/2021 07/23/2021 IP 71130.08 000740 Fitness For Duty Program FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - ANO 6 1, 2 08/02/2021 08/06/2021 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1, 2 08/23/2021 08/27/2021 IP 71130.03 000735 Contingency Response - Force-On-Force Testing This report does not include INPO and OUTAGE activities. Page 2 of 3 This report shows only on-site and announced inspection procedures.

2/19/2020 11:25:48 AM

IP 22 Inspection Activity Plan Report Arkansas Nuclear One 01/01/2020 - 12/31/2021 Unit Start End Activity CAC Title Staff Count EP Program Inspection 1 1, 2 08/16/2021 08/20/2021 IP 71114.02 000717 Alert and Notification System Testing 1, 2 08/16/2021 08/20/2021 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1, 2 08/16/2021 08/20/2021 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 08/16/2021 08/20/2021 IP 71114.05 000720 Maintenance of Emergency Preparedness 1, 2 08/16/2021 08/20/2021 IP 71151 001397 Performance Indicator Verification RP 2,4 2 1, 2 08/30/2021 09/03/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 08/30/2021 09/03/2021 IP 71124.04 000728 Occupational Dose Assessment Inservice Inspection 2RF28 - ANO 1 2 09/20/2021 10/01/2021 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

This report does not include INPO and OUTAGE activities. Page 3 of 3 This report shows only on-site and announced inspection procedures.

2/19/2020 11:25:48 AM