ML17346A912: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 14: | Line 14: | ||
| page count = 4 | | page count = 4 | ||
| project = CAC:MF9532, CAC:MF9533, EPID:L-2017-LLA-0209 | | project = CAC:MF9532, CAC:MF9533, EPID:L-2017-LLA-0209 | ||
| stage = | | stage = Request | ||
}} | }} | ||
Revision as of 20:12, 24 April 2018
ML17346A912 | |
Person / Time | |
---|---|
Site: | Point Beach |
Issue date: | 12/22/2017 |
From: | Chawla M L Plant Licensing Branch III |
To: | Point Beach |
Chawla M L, NRR/DORL/LPLIII | |
References | |
CAC MF9532, CAC MF9533, EPID L-2017-LLA-0209 | |
Download: ML17346A912 (4) | |
Text
LICENSEE: FACILITY:
SUBJECT:
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 22, 2017 NextEra Energy Point Beach, LLC Point Beach Nuclear Plant, Unit Nos. 1 and 2 SUMMARY OF NOVEMBER 14, 2017, PUBLIC TELECONFERENCE WITH NEXTERA ENERGY POINT BEACH, LLC, TO DISCUSS CONTAINMENT DOME TRUSS LICENSE AMENDMENT REQUEST FOR POINT BEACH NUCLEAR PLANT, UNIT NOS. 1 AND 2 (CAC NOS. MF9532 AND MF9533; EPID L-2017-LLA-0209) On November 14, 2017, a Category 1 public teleconference was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of NextEra Energy Point Beach, LLC (NextEra or licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. By letter dated March 31, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 17090A511 ), the licensee submitted a license amendment request (LAR) for Point Beach Nuclear Plant, Units 1 and 2. The proposed LAR would document a risk-informed resolution strategy to resolve low risk, legacy design code nonconformances associated with construction trusses in the containment building. On October 30, 2017 (ADAMS Accession No. ML 17303A542), the NRC staff submitted a draft request for additional information (RAI) related to the above submittal. The purpose of this public teleconference was for the NRC staff to discuss the draft RAls in further detail in order to gain a better understanding of the methodology adopted in the subject submittal, prior to conducting a site audit on November 29 and 30, 2017, at the NextEra Headquarters in Jupiter, Florida. The NRC staff asked numerous questions regarding the unique approach, and the licensee provided further insight into the adopted methodology. The meeting notice and agenda, dated November 2, 2017, are available in ADAMS as Accession No. ML 17311A084. A list of the meeting attendees is enclosed. There were no members of the public in attendance via bridgeline and public meeting feedback forms were not requested by anyone.
Please direct any inquiries to me at 301-415-8371, or by e-mail to Mahesh.chawla@nrc.gov. Docket Nos. 50-266 and 50-301
Enclosure:
List of Attendees cc: Listserv Mahesh Chawla, Project Manager Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LIST OF ATTENDEES NOVEMBER 14, 2017, PUBLIC TELECONFERENCE WITH NEXTERA ENERGY POINT BEACH, LLC REGARDING POINT BEACH NUCLEAR PLANT, UNIT NOS. 1 AND 2 TO DISCUSS CONTAINMENT DOME TRUSS STRUCTURE LAR Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation Division Name Title Division of Operating Mahesh Chawla Project Manager Reactor Licensing (DORL) Division of Engineering (DE) George Thomas Senior Structural Engineer Dan Hoang Structural Engineer Kamal Manoly Senior Technical Advisor Division of Safety Systems Fred Forsaty Reactor Systems Engineer (DSS) Division of Risk Assessment Chinq Nq Reliability and Risk Analyst (ORA) Shilp Vasavada Reliability and Risk Analyst Sara Lyons Reliability and Risk Analyst NRC Reoion 3 Vijay Meghani Reactor Inspector John Bozqa Senior Reactor Inspector Jim Neurauter Senior Reactor Inspector Tom Hartman Senior Resident Inspector at Point Beach Nuclear Plant NextEra Energy Point Beach, LLC Point Beach Nuclear Lori Christensen Licensing Project Manager Plant/NextEra Headquarters Rich LaPlante Civil/Structural Senior Engineer Mike Lev Project Manager Steve Catron Licensing Fleet Manager Gary Kilby Licensing Lead Project Manaoer Jensen-Hughes Consultants Marlene Delaney Senior Engineer Ill/Manager, Design Enoineerinq Kevin Dommer Principal Engineer Ill Braden Schwarz Enoineer IV Todd Radford Senior Engineer/Structural Engineering Manager (Boston) Enclosure
SUBJECT:
SUMMARY OF NOVEMBER 14, 2017, PUBLIC TELECONFERENCE WITH NEXTERA ENERGY POINT BEACH, LLC, TO DISCUSS CONTAINMENT DOME TRUSS LICENSE AMENDMENT REQUEST FOR POINT BEACH NUCLEAR PLANT, UNIT NOS. 1 AND 2 (CAC NOS. MF9532 AND MF9533; EPID L-2017-LLA-0209) DATED DECEMBER 22, 2017 DISTRIBUTION: PUBLIC RidsNrrPMPointBeach TWertz, NRR SVasavada, NRR SLyons, NRR DHoang,NRR SJones, NRR RidsNrrDorllpl3 RidsNrrLASRohrer JBowen, EDO CNg, NRR KManoly, NRR FForsaty, NRR THartman, R3 JBozga, R3 RidsRgn3MailCenter RidsAcrs_MailCTR JCameron, R3 VMeghani, R3 JRutkowski, R3 KBarclay, R3 ADAMS Accession No. ML 17346A912 OFFICE DORL/LPL3/PM DORL/LPL3/LA NRR/DRA/APLB NAME MChawla SRohrer M Reisi Fard (Slyons for) DATE 12/13/17 12/13/17 12/13/17 OFFICE NRR/DSS/SRXB NRR/DORL/LPL3 DORL/LPL3/PM NAME JWhitman DWrona MChawla (RBeaton for) DATE 12/13/17 12/21/17 12/22/17 OFFICIAL RECORD COPY *via email NRR/DE/ESEB* BWittick (RPettis for) 12/12/17