ML24227A508

From kanterella
Jump to navigation Jump to search
Summary of the July 15, 2024, Public Outreach to Discuss the NRC 2023 End-Of-Cycle Plant Performance Assessment of Point Beach Nuclear Plant, Units 1 and 2
ML24227A508
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/15/2024
From: James Beavers
NRC/RGN-III/DORS/RPB2
To:
Shared Package
ML24057A283 List:
References
Download: ML24227A508 (1)


Text

LICENSEE: NextEra Energy Point Beach, LLC FACILITY: Point Beach Nuclear Plant, Units 1 and 2

SUBJECT:

SUMMARY

OF THE JULY 15, 2024, PUBLIC OUTREACH TO DISCUSS THE NRC 2023 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT OF POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 On July 15, 2024, from 6:00 p.m. to 9:00 p.m. (CDT), an observation meeting was held by representatives of the U.S. Nuclear Regulatory Commission (NRC) to provide the public with information on the 2023 End-of-Cycle plant performance assessment of Point Beach Nuclear Plant, Units 1 and 2, along with general information on the NRC. The meeting was held during the Two Rivers City Council Meeting in Two Rivers, Wisconsin and was accessible to stream online. The NRC discussed plant performance with local government officials and a member of the public. A representative from the licensee was also present at the event.

The NRC discussed their assessment of Point Beach Nuclear Plant, as documented in the February 28, 2024, End-of-Cycle Assessment Letter (ADAMS Accession Number ML24057A356) during the public outreach. The NRC made various resources available to those in attendance, such as the assessment letter. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC staff James Beavers, Acting Chief Reactor Projects Branch 2 Division of Operating Reactor Safety Docket Nos. 50-266 and 50-301 License Nos. DPR-24 and DPR-27

Enclosure:

As stated cc: Distribution via LISTSERVAugust 15, 2024 Signed by Beavers, James on 08/15/24

SUBJECT:

SUMMARY

OF THE JULY 15, 2024, PUBLIC OUTREACH TO DISCUSS THE NRC 2023 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT OF POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2

DISTRIBUTION:

Michelle Simmons RidsNrrDorlLpl3 RidsNrrPMPointBeach RidsNrrDroIrib Resource Jack Giessner Mohammed Shuaibi Diana Betancourt-Roldan Allan Barker David Curtis Jonathan Feibus R3-DORS ROPassessment.Resource@nrc.gov

ADAMS Accession Number: ML24227A508 OFFICE RIII RIII NAME RNg:gmp JBeavers DATE 08/14/2024 08/15/2024 OFFICIAL RECORD COPY PUBLIC MEETING ATTENDEES

July 15, 2024

U.S. Nuclear Regulatory Commission

J. Kozal, Division Director, Division of Operating Reactor Safety (DORS), Region III T. Hartman, Acting Branch Chief, DORS, Reactor Projects Branch 2 M. Stafford, Senior Resident Inspector J. Masse, Resident Inspector C. Smith, Student Intern

NextEra Energy

B. Griffin

Public

M. Canty

Enclosure