IR 05000334/2015006: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 32: Line 32:


===Enclosure:===
===Enclosure:===
Beaver Valley Power Station Inspection/Activity Plan cc w/encl: Distribution via ListServ
Beaver Valley Power Station Inspection/Activity Plan cc w/encl: Distribution via ListServ  
 
ML16054A769  SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME JKrafty/ JK via email SShaffer/ SWS SKennedy/ SRK DATE 02/ 23 /16 02 / 23 /16 02/ 23 /16 Page 1 of 302/02/201612:54:40Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteBeaver ValleyInspection / Activity Plan01/01/2016-12/31/20177111111B-BV1 REQUAL INSP W/ P/F RESULTS21 IPLicensed Operator Requalification Program7111111B04/11/201604/15/201671124-RAD SAFETY INSPECTION11,2 IPRadiological Hazard Assessment and Exposure Controls71124.0103/07/201603/11/20161,2 IPOccupational ALARA Planning and Controls71124.0203/07/201603/11/20161,2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0303/07/201603/11/20161,2 IPOccupational Dose Assessment71124.0403/07/201603/11/2016EP-EP EXERCISE EVALUATION41,2 IPExercise Evaluation711140106/13/201606/17/20167111107T-TRIENNIAL HEAT SINK11,2 IPHeat Sink Performance7111107T05/16/201605/20/2016EXM10/3-BEAVER VALLEY 1 INITIAL EXAM61 FY17-BV1 INITIAL OPERATOR LICENSING EXAMU0192209/12/201609/16/20161 FY17-BV1 INITIAL OPERATOR LICENSING EXAMU0192210/31/201611/11/20167111117T-PERMANENT PLANT MODIFICATIONS31,2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T06/06/201606/10/20161,2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T06/20/201606/24/201671124-RAD SAFETY INSPECTION31,2 IPRadiation Monitoring Instrumentation71124.0507/11/201607/15/20161,2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0607/11/201607/15/20161,2 IPRadiological Environmental Monitoring Program71124.0707/11/201607/15/20161,2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0107/11/201607/15/201671124-RAD SAFETY INSPECTION11,2 IPRadiological Hazard Assessment and Exposure Controls71124.0110/03/201610/07/20161,2 IPOccupational ALARA Planning and Controls71124.0210/03/201610/07/20161,2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/03/201610/07/20161,2 IPOccupational Dose Assessment71124.0410/03/201610/07/20167111108P-BV U1 INSERVICE INSPECTION21 IPInservice Inspection Activities - PWR7111108P10/03/201610/14/201671124-RAD SAFETY INSPECTION11,2 IPRadiological Hazard Assessment and Exposure Controls71124.0112/12/201612/16/20161,2 IPOccupational ALARA Planning and Controls71124.0212/12/201612/16/20161,2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0312/12/201612/16/2016This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
 
Page 2 of 302/02/201612:54:40Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteBeaver ValleyInspection / Activity Plan01/01/2016-12/31/201771124-RAD SAFETY INSPECTION11,2 IPOccupational Dose Assessment71124.0412/12/201612/16/20161,2 IPOccupational Exposure Control Effectiveness71151-OR0112/12/201612/16/201671124.08-RADWASTE11,2 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0812/05/201612/09/201671124-HP INSPECTION11,2 IPRadiological Hazard Assessment and Exposure Controls71124.0104/10/201704/14/20171,2 IPOccupational ALARA Planning and Controls71124.0204/10/201704/14/20171,2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0304/10/201704/14/20177111108P-U2 INSERVICE INSPECTION2 2 IPInservice Inspection Activities - PWR7111108P04/10/201704/21/20177111111B-BV2 REQUAL INSP WITH P/F RESULTS2 2 IPLicensed Operator Requalification Program7111111B06/19/201706/23/201710/8EXAM-BEAVER VALLEY 2 INITIAL EXAM6 2 FY18-BV2 INITIAL OPERATOR LICENSING EXAMU0193809/11/201709/15/2017 2 FY18-BV2 INITIAL OPERATOR LICENSING EXAMU0193810/09/201710/20/2017EP-EP PROGRAM INSPECTION21,2 IPAlert and Notification System Testing711140206/19/201706/23/20171,2 IPEmergency Preparedness Organization Staffing and Augmentation System711140306/19/201706/23/20171,2 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140506/19/201706/23/20171,2 IPPerformance Indicator Verification7115106/19/201706/23/201771124-HP INSPECTION11,2 IPOccupational Dose Assessment71124.0406/05/201706/09/20171,2 IPRadiation Monitoring Instrumentation71124.0506/05/201706/09/201771152B-PI&R BIENNIAL21,2 IPProblem Identification and Resolution71152B06/01/201706/05/20171,2 IPProblem Identification and Resolution71152B06/15/201706/19/2017TI-191-FUKUSHIMA LESSON LEARNED11,2 IPInspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 20122515/19107/10/201707/15/2017ISFSI-ISFSI LOADING CAMPAIGN INSPECTION11,2 IPOperation Of An ISFSI6085507/24/201707/28/20171,2 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.107/24/201707/28/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
 
Page 3 of 302/02/201612:54:40Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteBeaver ValleyInspection / Activity Plan01/01/2016-12/31/201771124-HP INSPECTION11,2 IPRadiological Hazard Assessment and Exposure Controls71124.0110/16/201710/20/20171,2 IPOccupational ALARA Planning and Controls71124.0210/16/201710/20/20171,2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/16/201710/20/20171 IPOccupational Exposure Control Effectiveness71151-OR0110/16/201710/20/20171 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0110/16/201710/20/20177111121-CDBI91,2 IPComponent Design Bases Inspection711112110/16/201710/20/20171,2 IPComponent Design Bases Inspection711112110/30/201711/03/20171,2 IPComponent Design Bases Inspection711112111/13/201711/17/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
}}
}}

Revision as of 09:22, 20 May 2018

ROP 16 Annual Assessment Letter for Beaver Valley Power Station, Units 1 & 2 (Report 05000334/2015006 and 05000412/2015006)
ML16054A769
Person / Time
Site: Beaver Valley
Issue date: 03/02/2016
From: Kennedy S R
NRC/RGN-I/DRP/PB6
To: Richey M
FirstEnergy Nuclear Operating Co
Shared Package
ML16039A100 List:
References
IR 2015006
Download: ML16054A769 (6)


Text

March 2, 2016

Mr. Marty Richey Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4 Shippingport, PA 15077

SUBJECT: ANNUAL ASSESSMENT LETTER FOR BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (REPORT 05000334/2015006 AND 05000412/2015006)

Dear Mr. Richey:

On February 9, 2016, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Beaver Valley Power Station, Unit Nos. 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2015, through December 31, 2015. This letter informs inspections at your facility. The NRC determined that overall, Beaver Valley Power Station, Unit Nos. 1 and 2, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Beaver Valley Power Station, Unit Nos. 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through December 31, 2017. Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 60855.1, Operation of an ISFSI Independent Spent Fuel Storage Installation at Operating Plants The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In response to the accident at Fukushima, the Commission issued Order EA-12-Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12- remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The audit was completed for Beaver Valley Power Station Unit Nos. 1 and 2, and the information gathered will aid staff in development of the Final Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing TI 2515- and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communications/Staffing/Multi- In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at (610) 337-5046 with any questions you have regarding this letter.

Sincerely,/RA/ Silas R. Kennedy, Chief Projects Branch 6 Division of Reactor Projects Docket Nos. 50-334 and 50-412 License Nos. DPR-66 and NPF-73

Enclosure:

Beaver Valley Power Station Inspection/Activity Plan cc w/encl: Distribution via ListServ

ML16054A769 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME JKrafty/ JK via email SShaffer/ SWS SKennedy/ SRK DATE 02/ 23 /16 02 / 23 /16 02/ 23 /16 Page 1 of 302/02/201612:54:40Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteBeaver ValleyInspection / Activity Plan01/01/2016-12/31/20177111111B-BV1 REQUAL INSP W/ P/F RESULTS21 IPLicensed Operator Requalification Program7111111B04/11/201604/15/201671124-RAD SAFETY INSPECTION11,2 IPRadiological Hazard Assessment and Exposure Controls71124.0103/07/201603/11/20161,2 IPOccupational ALARA Planning and Controls71124.0203/07/201603/11/20161,2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0303/07/201603/11/20161,2 IPOccupational Dose Assessment71124.0403/07/201603/11/2016EP-EP EXERCISE EVALUATION41,2 IPExercise Evaluation711140106/13/201606/17/20167111107T-TRIENNIAL HEAT SINK11,2 IPHeat Sink Performance7111107T05/16/201605/20/2016EXM10/3-BEAVER VALLEY 1 INITIAL EXAM61 FY17-BV1 INITIAL OPERATOR LICENSING EXAMU0192209/12/201609/16/20161 FY17-BV1 INITIAL OPERATOR LICENSING EXAMU0192210/31/201611/11/20167111117T-PERMANENT PLANT MODIFICATIONS31,2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T06/06/201606/10/20161,2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T06/20/201606/24/201671124-RAD SAFETY INSPECTION31,2 IPRadiation Monitoring Instrumentation71124.0507/11/201607/15/20161,2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0607/11/201607/15/20161,2 IPRadiological Environmental Monitoring Program71124.0707/11/201607/15/20161,2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0107/11/201607/15/201671124-RAD SAFETY INSPECTION11,2 IPRadiological Hazard Assessment and Exposure Controls71124.0110/03/201610/07/20161,2 IPOccupational ALARA Planning and Controls71124.0210/03/201610/07/20161,2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/03/201610/07/20161,2 IPOccupational Dose Assessment71124.0410/03/201610/07/20167111108P-BV U1 INSERVICE INSPECTION21 IPInservice Inspection Activities - PWR7111108P10/03/201610/14/201671124-RAD SAFETY INSPECTION11,2 IPRadiological Hazard Assessment and Exposure Controls71124.0112/12/201612/16/20161,2 IPOccupational ALARA Planning and Controls71124.0212/12/201612/16/20161,2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0312/12/201612/16/2016This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 2 of 302/02/201612:54:40Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteBeaver ValleyInspection / Activity Plan01/01/2016-12/31/201771124-RAD SAFETY INSPECTION11,2 IPOccupational Dose Assessment71124.0412/12/201612/16/20161,2 IPOccupational Exposure Control Effectiveness71151-OR0112/12/201612/16/201671124.08-RADWASTE11,2 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0812/05/201612/09/201671124-HP INSPECTION11,2 IPRadiological Hazard Assessment and Exposure Controls71124.0104/10/201704/14/20171,2 IPOccupational ALARA Planning and Controls71124.0204/10/201704/14/20171,2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0304/10/201704/14/20177111108P-U2 INSERVICE INSPECTION2 2 IPInservice Inspection Activities - PWR7111108P04/10/201704/21/20177111111B-BV2 REQUAL INSP WITH P/F RESULTS2 2 IPLicensed Operator Requalification Program7111111B06/19/201706/23/201710/8EXAM-BEAVER VALLEY 2 INITIAL EXAM6 2 FY18-BV2 INITIAL OPERATOR LICENSING EXAMU0193809/11/201709/15/2017 2 FY18-BV2 INITIAL OPERATOR LICENSING EXAMU0193810/09/201710/20/2017EP-EP PROGRAM INSPECTION21,2 IPAlert and Notification System Testing711140206/19/201706/23/20171,2 IPEmergency Preparedness Organization Staffing and Augmentation System711140306/19/201706/23/20171,2 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140506/19/201706/23/20171,2 IPPerformance Indicator Verification7115106/19/201706/23/201771124-HP INSPECTION11,2 IPOccupational Dose Assessment71124.0406/05/201706/09/20171,2 IPRadiation Monitoring Instrumentation71124.0506/05/201706/09/201771152B-PI&R BIENNIAL21,2 IPProblem Identification and Resolution71152B06/01/201706/05/20171,2 IPProblem Identification and Resolution71152B06/15/201706/19/2017TI-191-FUKUSHIMA LESSON LEARNED11,2 IPInspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 20122515/19107/10/201707/15/2017ISFSI-ISFSI LOADING CAMPAIGN INSPECTION11,2 IPOperation Of An ISFSI6085507/24/201707/28/20171,2 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.107/24/201707/28/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 3 of 302/02/201612:54:40Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteBeaver ValleyInspection / Activity Plan01/01/2016-12/31/201771124-HP INSPECTION11,2 IPRadiological Hazard Assessment and Exposure Controls71124.0110/16/201710/20/20171,2 IPOccupational ALARA Planning and Controls71124.0210/16/201710/20/20171,2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/16/201710/20/20171 IPOccupational Exposure Control Effectiveness71151-OR0110/16/201710/20/20171 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0110/16/201710/20/20177111121-CDBI91,2 IPComponent Design Bases Inspection711112110/16/201710/20/20171,2 IPComponent Design Bases Inspection711112110/30/201711/03/20171,2 IPComponent Design Bases Inspection711112111/13/201711/17/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.