ML19290E021: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:-
{{#Wiki_filter:-
        ,
d j                                    UNION ELECTRIC COMPANY teos omATsoT sTmarr ST. Louis. Missount
d j                                    UNION ELECTRIC COMPANY teos omATsoT sTmarr ST. Louis. Missount
       .aonw n.eavam
       .aonw n.eavam pN so[."[[*'
          . . . . . . '
pN so[."[[*'
January 29, 1980              s t 'a' * -' a == a ' * * ' *
January 29, 1980              s t 'a' * -' a == a ' * * ' *
* Mr. Gaston Fiorelli, Chief Reactor Construction & Engineering Support Branch U.S. Nuclear Regulatory Commi'ssion Region III 799 Roosevelt Rd.
* Mr. Gaston Fiorelli, Chief Reactor Construction & Engineering Support Branch U.S. Nuclear Regulatory Commi'ssion Region III 799 Roosevelt Rd.
Line 37: Line 34:
                         " Tapping the bolt head with a hammer, finger threading the nut, then tighten to a maximum of 30 foot pounds torque.
                         " Tapping the bolt head with a hammer, finger threading the nut, then tighten to a maximum of 30 foot pounds torque.
s
s
         ,          ~                                                FEB        11980
         ,          ~                                                FEB        11980 8003 0 40 0lf6
                  -
8003 0 40 0lf6


. ,
      ,
        .
g . Mr. Gaston Fiorelli                          January 29, 1980 Contrary to the above, the inspectors determined that the manufacturer's recommendations to ensure that cable trays are adequately joined were neither translated in cable tray installa-tion procedure WP302 nor inspection procedure OCP302.
g . Mr. Gaston Fiorelli                          January 29, 1980 Contrary to the above, the inspectors determined that the manufacturer's recommendations to ensure that cable trays are adequately joined were neither translated in cable tray installa-tion procedure WP302 nor inspection procedure OCP302.
CORRECTIVE ACTION TAKEN AND RESULTS ACHIEVED:
CORRECTIVE ACTION TAKEN AND RESULTS ACHIEVED:
Line 54: Line 46:
Full compliance will be achieved by March 1, 1980 upon implementation of the revision to QCP-302, incorporation of ICP-2, Rev. 1, to WP-302, and reinspection of previously accepted cable tray.
Full compliance will be achieved by March 1, 1980 upon implementation of the revision to QCP-302, incorporation of ICP-2, Rev. 1, to WP-302, and reinspection of previously accepted cable tray.


      .
   , e-Mr. Gaston Fiorelli                            January 29, 1980 J
            -
,
   , e-
    .  -
Mr. Gaston Fiorelli                            January 29, 1980 J
If you have any questiona regarding this response or additional information is required, please let me know.
If you have any questiona regarding this response or additional information is required, please let me know.
Yours very truly,
Yours very truly,
                                                         'th tohn K. Bry QAK
                                                         'th tohn K. Bry QAK 2
                                                              .-
LAO /jds cc:  W. A. Hansen
2 LAO /jds cc:  W. A. Hansen
                             .}}
                             .}}

Revision as of 15:14, 1 February 2020

Responds to NRC 800104 Ltr Re Violations Noted in IE Insp Rept 50-483/79-12.Corrective Action:Addl Installation Recommendations Have Been Obtained from Cable Tray Manufacturer
ML19290E021
Person / Time
Site: Callaway Ameren icon.png
Issue date: 01/29/1980
From: Bryan K
UNION ELECTRIC CO.
To: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19290E018 List:
References
ULNRC-336, NUDOCS 8003040018
Download: ML19290E021 (3)


Text

{{#Wiki_filter:- d j UNION ELECTRIC COMPANY teos omATsoT sTmarr ST. Louis. Missount

      .aonw n.eavam pN so[."[[*'

January 29, 1980 s t 'a' * -' a == a ' * * ' *

  • Mr. Gaston Fiorelli, Chief Reactor Construction & Engineering Support Branch U.S. Nuclear Regulatory Commi'ssion Region III 799 Roosevelt Rd.

Glen Ellyn, IL 60137 ULNRC- 3 36

Dear Mr. Fiorelli:

INSPECTION REPORT NO. 50-483/79-12 This is in response to your letter of January 4, 1980 reporting results of an inspection at Union Electric Company's Callaway Plant Site on November 14-16, 1979 and as detailed in in-spection report number 50-483/79-12. None of the material in the inspection report or in this response are considered proprietary by Union Electric Company. The following is in response to the item listed in Appendix A, Notice of Violation, of the inspection report. Infraction (483/79-12-04) 10CFR50, Appendix B, Criterion III states, in part, that " Measures shall be established to assure that applicable regulatory requirements and the desir basis . . . are correctly translated into specifications, drawings, procedures, and instructions." Design drawing EOR-8900 Revision 9 paragraph 2.12 states, " Trays will be joined with splice plates and hardware according to tray manufacturer's recommendations." P-W Industries, the cable tray manufacturer in a letter dated August 14, 1979 recommended

                       " Tapping the bolt head with a hammer, finger threading the nut, then tighten to a maximum of 30 foot pounds torque.

s

       ,           ~                                                 FEB         11980 8003 0 40 0lf6

g . Mr. Gaston Fiorelli January 29, 1980 Contrary to the above, the inspectors determined that the manufacturer's recommendations to ensure that cable trays are adequately joined were neither translated in cable tray installa-tion procedure WP302 nor inspection procedure OCP302. CORRECTIVE ACTION TAKEN AND RESULTS ACHIEVED: As a result of the NRC finding, additional installation recommendations have been obtained from the cable tray manufacturer. P-W Industries has provided the following as an alternate method for joining cable trays: "When connection hardware is drawn up tight as determined by visually observing the head of the connector bolt coming into firm contact with the tray side rail, the resultant torque is adequate to insure electrical continuity and structural integrity." This recommendation was submitted to Dechtel via RCI-2-205-E. Bechtel concurred with the recommendation on January 18, 1980. By issuing an Interim Change to Procedure (ICP-2, Rev. 1, to WP-302, Rev. 7) on January 29, 1980, this recommendation was included in the cable tray installation procedure. CORRECTIVE ACTION TO BE TAKEN TO AVOID FURTHER NONCOMPLIANCE: Quality Control procedure QCP-302 will be revised to include a visual inspection to assure that the connection bolt head is in firm contact with the tray side rail. Previously inspected tray will be reinspected to the new criterion, DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED: Full compliance will be achieved by March 1, 1980 upon implementation of the revision to QCP-302, incorporation of ICP-2, Rev. 1, to WP-302, and reinspection of previously accepted cable tray.

 , e-Mr. Gaston Fiorelli                            January 29, 1980 J

If you have any questiona regarding this response or additional information is required, please let me know. Yours very truly,

                                                        'th tohn K. Bry QAK 2

LAO /jds cc: W. A. Hansen

                            .}}