ML18139C062: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 15: Line 15:
| page count = 1
| page count = 1
| project =  
| project =  
| stage = Other
| stage = Request
}}
}}



Revision as of 09:01, 5 April 2019

Forwards Inservice Insp Program,Interval 2,821222-921222. Relief Requested from ASME Code,Section Xi Testing & Insp Requirements
ML18139C062
Person / Time
Site: Surry Dominion icon.png
Issue date: 09/21/1982
From: LEASBURG R H
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: DENTON H R, EISENHUT D G
Office of Nuclear Reactor Regulation
Shared Package
ML18130A377 List:
References
546, NUDOCS 8210130427
Download: ML18139C062 (1)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND~

VIRGINIA 23261 R.H. LEASBURG VxoE PRESIDENT NUCLEAR 0PERATXONS September 21, 1982 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attn: Mr. Darrell G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:

Serial No. 546 _NO/WDC: acm Docket No. 50-280 License No. DPR-32 SURRY POWER STATION INSERVICE INSPECTION PROGRAM Pursuant to 10 CFR 50.55a (g), the Virginia Electric and Power Company hereby submits its program for inservice inspection and testing ASME Code Systems during the second ten year interval for Surry Power Station Unit 1. Per 10 CFR 50.55a (g) (4), the ASME Code and addenda "in effect" for this period has been determined to be the 1980 Edition of Section XI with Addenda thru the Winter of 1980. Surry Power Station was not, however, designed to meet the detailed inservice inspection and testing requirements of the ASME Code,Section XI. Therefore, pursuant to 10 CFR 50.55a (g) 6 (i), we request specific relief from ASME Code requirements pertaining to inservice inspection and testing as outlined on the enclosed attachments.

Attachments

.-*8 2io-130421 020921 ; PDR ADOCK 05000280